Having knowledge and experience in Oil & Gas/Petrochemical construction and maintenance from various projects and supply chain Material management .
Knowledgeable Material management fellow bringing 12 years of related experience. Keeps materials moving quickly and accurately to meet customers supply needs.
Highly organized and forward-thinking with detail-oriented approach and good multitasking skills.
Overview
16
16
years of professional experience
3
3
years of post-secondary education
1
1
Certificate
Work History
Sr. Maintenance Materials Coordinator/ Planner
Sadara Chemical (Chem II TDI Unit)
Al Jubail. KSA, Eastern region
03.2017 - Current
Advanced knowledge in SAP MM ERP ECC WM roles and T-codes
Maintain and implement Standardization for each spare
Re-trigger specification changes and update specification as per FFF letter and recommendations
Monitor and maintain re-order flow
Create and update Inventory level (MIN/MAX) based on consumption
Support Turnaround planning & materials
Observe trends and end user requests to create and maintain inventory schedules
Keeping track of consuming values and rejection rate according to purchasing expectations and make sure right number of materials is always available in hand
Assist Maintenance Planner/WAC/Scheduler for technical aspect of maintenance
Provide technical evaluation/Query (TE, TQ) against on Purchase requisitions
Maintain and balance stock of materials required for PPM, Maintenance, refurbishment, pitstop and shutdown activities
Maintain MRP levels and Run Consolidate PR/PO on weekly base
Update; Add/Remove P/N and link with appropriate equipment BOM
Update Dashboard on daily basis (WO status as MAT1, MAT2, MAT3, MAT9)
Provide needy support to end user, MRO Warehouse, Procurement, Trade compliance
Effectively assigned in startup and commissioning team for Plant
Transfer Commissioning start Up CSU Spares from EPC to envelops
Follow workflow from Gatekeeper to secure materials and Equipment's according to requirements
Coordinate maintenance plan for equipment's and implement in SAP system
Create and update BOM list as per the GA drawing & recommendation
Catalog and codify materials as per required specifications
Close Daily basis dashboard request and work order using SAP system
Standardize materials as per categories, codes, standards, and SADARA Spec
Plan ahead material scope for Turnaround, Shut down and priority basis tasks
Selection of equipment and instruments
Preparation and checking of data sheets
Follow up PO/PR with procurement
Record Tracking of shipments with trade compliance and Vendors
Schedule and coordinate inspection with asset integrity and planners for fabrication materials
Conduct tests, trigger OSID materials
Implementing and adding of new activities in database.
Material Planner / Expeditor
GS Engineering (Neotek)/ Technip
01.2015 - 01.2017
Checked and examined all supplies, equipment and materials coming in
Reported repair / refurbish, parts and tools to concerned end user
Receive Job package from Operation to Arrange according to work nature
Coordinate maintenance plan for equipment's installation and implement improvised changes in SAP system
Create and update BOM list
Close Daily basis dashboard request and work orders using SAP system
Plan material scopes and arrange as per schedules
List Shut down materials and priority basis tasks
Provide technical evaluation (TE) against on Purchase requisitions
Maintain Stock level for category materials
Download WO status and update materials Status in WO (MAT1, MAT2, MAT3, MAT9)
Provide needy support to end user, MRO, Procurement, Trade compliance
Selection of equipment and instruments
Preparation and checking of data sheets
Follow up maintenance in equipment breakdowns and corrective actions
Monitoring of Material preservation system.
Material Receiving QC Inspector
SADARA Chemical Company Al-Jubail
02.2013 - 12.2014
Site inspection and respective documentation and control
Prepare Inspection Request for Site PID / Client
Co-ordination with client and sub-contractors NDT Companies
Prepare and issue of nonconformance reports
Preparing inspection requests, reports for client inspection on PWHT HT and related activities of piping, Furnace equipment works
Selection of equipment and instruments
Preparation and checking of data sheets, equipment layouts, piping layouts and piping isometrics
Verify availability of latest revision of approved Machine Calibration Certificates, Procedures at site
Review Test Package; attach weld history and NDT reports
Test package identification, package preparation and verification
Line checking and preparation of punch lists
Witness testing activities.
Piping QC Engineer (NDT& PWHT)
SUNGDO-SK Engineering
06.2012 - 09.2013
Monitoring and conducting material inspection for Mechanical piping, welding, structural and equipment's as per standards, codes and process standard specifications
Conduct NDT Requirements to Verify Material
Such as PMI
To allocate work and completion in accordance with the monitoring system
Pre-review of all the quality and construction procedures and documents prior Upper management review
Responsible for daily checks on the sub-contractors, to ensure carried out work at optimum efficiency
Monitoring and verification of consumables control according to the WPS and project construction standards
Perform engineering supervision and tasks as directed by the management
Preparation of third party's authorities site visits and audits
Maintain project, task files and reports
Supervise the daily activities in the installation of piping spools and supports checking if the works were as per drawings, standards and specifications
Prepare the documents for the QC activities and test packages
Updating all QC activities and prepare the Test packages status and progress reports.
PMI-PWHT QC Inspector
SOGEC NDT (ISSAM KABBANI)
04.2011 - 11.2011
Ensure Pre heat, Heat Input as per WPS
Check the availability of approved WPS, Isometric drawings at site
Site Supervising for Post Weld Heat Treatment (PWHT), PMI, HT, and Pre Heat And ensure all the documents and approved procedures for each test conducting In site
Verify availability of latest revision of approved Machine Calibration Certificates, Procedures at site
Review of materials test certificates and Calibrate certificates for compliance With applicable codes
Prepare detailed records and reports at all inspections conducted at the site And maintain the quality control documentation.
NDT-PWHT-PMI Technician
SOGEC NDT (ISSAM KABBANI)
02.2010 - 02.2011
Organize Positive Material Identification (PMI) to ensure weld and parent material composition
Make Approve of technicians who are going to be in assigned in each site
Conduct and organize Post Weld Heat Treatment (PWHT) team and areas, check parameters with respect to code and approved procedure
Inspection of welding consumables (electrodes storage, baking etc.) and validation of calibration certificates of oven, quiver welding machine, etc..
Inspection of Fit-up, Welding In process/Visual inspection
Conduct MPI/DPT for field joints, offer weld joints for radiography and action against back log.
Mechanical Technician (6 months apprenticeship)
TCR ENGINEERING
02.2009 - 12.2009
Ensure the material inspection conducting based client procedure and standards and codes
Make Approve of technicians who are going to be in assigned in each site
Conduct and organize Post Weld Heat Treatment (PWHT) team and areas, check parameters with respect to code and approved procedure
Inspection of welding consumables (electrodes storage, baking etc.) and validation of calibration certificates of oven, quiver welding machine, etc..
Inspection of Fit-up, Welding In process/Visual inspection
Conduct MPI/DPT for field joints, offer weld joints for radiography and action against back log.
Education
Mechanical Engineering DME -
Karnataka University
Urban Bengaluru
02.2006 - 03.2009
Skills
Timeline
Sr. Maintenance Materials Coordinator/ Planner
Sadara Chemical (Chem II TDI Unit)
03.2017 - Current
Material Planner / Expeditor
GS Engineering (Neotek)/ Technip
01.2015 - 01.2017
Material Receiving QC Inspector
SADARA Chemical Company Al-Jubail
02.2013 - 12.2014
Piping QC Engineer (NDT& PWHT)
SUNGDO-SK Engineering
06.2012 - 09.2013
PMI-PWHT QC Inspector
SOGEC NDT (ISSAM KABBANI)
04.2011 - 11.2011
NDT-PWHT-PMI Technician
SOGEC NDT (ISSAM KABBANI)
02.2010 - 02.2011
Mechanical Technician (6 months apprenticeship)
TCR ENGINEERING
02.2009 - 12.2009
Mechanical Engineering DME -
Karnataka University
02.2006 - 03.2009
India, Saudi Arabia & International (IDP)
Certification
India, Saudi Arabia & International (IDP)
Software
SAP ERP
Disclaimer
I hereby declare that the information furnished by me in this application is true, complete and correct to the best of my knowledge and belief.
Documentation Audit - Responsibilities
Preparation of maintenance, Shutdowns, Inspection and Test plan for construction or maintenance activity of various equipment's and piping according to the codes and standards.
Perform internal audit to identify inaccuracies and incomplete information's in quality System.
All verifications in the quality plan were properly executed.
Inspection reports are complete, accepted and signed by responsible parties.
Prepare all the documents for final internal/ external audit and take corrective actions against all nonconformances are found during audit.
Skill Strength
SAP Module MM, PM & IS creation and master data administration
Hand on experience with Primavera P6 and Plant designing.
Familiar with International Standards ASME - Sec. VIII, Sec. V, Sec. IX, B 31.3, B 16.5
NDT all streams and PWHT & PMI Methods and inspection procedures
Possess strong interpersonal skills and has the ability to work in a multi-cultural team
Disclaimer
I hereby declare that the information furnished by me in this application is true, complete, and correct to the best of my knowledge and belief.
Similar Profiles
Ashwin SabuAshwin Sabu
Safety Officer at Total safety , Sadara TDI TurnaroundSafety Officer at Total safety , Sadara TDI Turnaround