Experienced professional with over 3.5 years adept at managing last-minute changes and excelling under pressure. Recognized for consistently high-quality work and efficiency, with a strong commitment to continuous learning and a positive, proactive attitude. Proven track record of achieving outstanding results and adapting to evolving challenges.
Project Engineer / Support Engineer
OMV Borealis, Kallo Belgium
UOP Renewable Jet Fuel Process Unit, Hydroprocessing Technology-Reactor Section
Prepared Specifications: Developed specifications for high-pressure vessels, separators, and compressor suction drums in the reactor section.
Pressure Safety Valve Specification: Designed and specified pressure safety valves (PSVs) and performed calculations for critical PSVs, including cold separator PRV in the reactor loop.
Reactor Grid Load Calculation: Conducted reactor grid load calculations to determine the maximum pressure drop across reactor beds, optimizing performance and ensuring operational efficiency.
Depressurizing Calculations: Estimated depressurizing rates, sized depressurizing lines, and provided input for control valve sizing.
Process Documentation: Prepared process input datasheets, heat and weight balances for reactor beds and quench, and supported PID markups for vessels.
Jinshang, Chengdu, Sichuan, China
UOP Renewable Jet Fuel Process Unit, Hydroprocessing Technology- Fractionation Section
Equipment Specifications: Created specifications for trayed and packed columns, receivers, and knockout drums in the fractionation section.
Critical PRV Specification: Developed specifications and performed calculations for critical PRVs, including those for the product fractionator column and steam stripper column.
Documentation: Compiled equipment lists, inhibitor specification test methods, sampling schedules, line lists, utility summaries, effluent summaries, and flare load summaries.
HWB Reports: Prepared heat and weight balance (HWB) reports.
Petrobras, Brazil
UOP Renewable Jet Fuel Process Unit, Hydroprocessing Technology- Fractionation Section
Project Scheduling: Developed and managed project schedules to ensure timely completion of deliverables as per contractual dates.
Interdisciplinary Coordination: Coordinated with project teams, including piping and instrumentation, to ensure project deliverables were met.
Hydraulics Calculations: Performed unit hydraulics calculations and prepared hydraulic reports.
PRV Specifications: Prepared specifications and calculations for critical PRVs, including those for cold separator PRVs, product fractionator column PRVs, and steam stripper PRVs.
Test Methods and Sampling: Prepared specifications for test methods and sampling schedules.
NNPCL (UOP Naphtha Hydrotreating Process Unit)
PRV Calculations and Specifications: Conducted calculations and developed specifications for pressure relief valves (PRVs).
Flare Load Summary: Prepared flare load summaries for the project.