Summary
Overview
Work History
Education
Skills
Professional Duties And Responsibility
Personal Information
Declaration
Timeline
Generic
Sameer Saxena

Sameer Saxena

Elevator Installation Engineer
Pennslyvania

Summary

Accomplished elevator installation manager with a proven track record of successfully leading and executing elevator installation projects. Adept at combining technical expertise with strong project management skills to ensure installations are completed efficiently, within budget, and in compliance with safety regulations and industry standards. Effective communicator, skilled in fostering collaborations among clients, contractors, and installation team. Strategic planner with a keen focus on quality assurance and continuous improvement. Dedicated to maintaining a strong emphasis on safety and staying abreast of the latest advancements in elevator technology.

Overview

9
9
years of professional experience
5
5
years of post-secondary education
2
2
Languages

Work History

Construction supervisor

Otis Elevator India PVT Ltd
2022.09 - Current
  • Handled installation and modernization of elevators in commercial offices ,hotels ,hospitals ,low rise villa and high rise residential projects.
  • Have handled installation of following segments of elevators: 1. Low rise to high rise elevators (2 stops to 35 stops).
    2. Different speeds of elevators (0.5 to 6 meter per second) .
    3. Different capacity of elevators (5 to 26 Passengers).
  • Handled different size of projects , which includes average of 30 to 40 units per projects.
  • In total working span of 18 months in OTIS India , have delivered 150+ units against target of 125 units.

Senior Project Engineer

Schindler India PVT Ltd
2021.03 - 2022.09
  • Handled variety of low rise elevator installations and their commissioning .
  • Achieved project deadlines by coordinating with contractors to manage performance and delivered 90+ units yearly .
  • Supervised skilled installation team of company employees called fitter technicians , assessed their scope and requirements to assist with project design determinations.
  • Trained junior engineers in workstation design and material handling and developed positive working relationships with stakeholders to effectively coordinate work activities.
  • Adhered to timelines to meet quality assurance targets.

Senior Installation Engineer

Toshiba Johnson Elevators India PVT Ltd
2017.08 - 2021.03
  • Worked with premium customers like Marriott, ITC and DLF and handled different projects which includes high end lifts having premium cabin finishes and special technical features like high speed operations, advance door opening, grouping of lifts , access card systems, earthquake sensor implementation, dry type air conditioning system and integration of lifts with building management and fire systems.
  • Handled average of 70+ elevators per year .During span of 3 years , received promotion as well.
  • Defined engineering problems, collected data, established facts and drew conclusions to solve project issues.

Installation Engineer

ThyssenKrupp Elevator (I) Pvt. Ltd.
2015.03 - 2017.08
  • Learned and implemented the elevator installation using scaffolding and sccafoldless methods of MRL (Machine Room Less) and Machine Room elevators.
  • Read and interpreted blueprints, technical drawings, schematics, and computer-generated reports.
  • Learned and implemented the microprocessor based controllers testing and commissioning.
  • Handled installation and commissioning of 50 + elevators per year.
  • Conducted research to test and analyze feasibility, design, operation and performance of equipment, components, and systems.

Education

10th Grade -

Kendriya Vidyalaya
BAREILLY (U.P)

12th Grade -

Kendriya Vidyalaya
WAC Line,AGRA (U.P)
2009.03 - 2010.03

Bachelor of Technology - Electrical & Electronics

IMS Engineering College
Ghaziabad
2011.07 - 2015.08

Skills

Project Management

Team Leadership & Workforce management

Proficient in interpreting elevator related drawings

Knowledge of DCS (Destination control system), PMT (Physical measurement technology ) tool to asses the elevator riding ,sccafoldless installation , Machine room and machine room less elevator installation and modernization

Quality assurance and Safety compliance

Materials Management

Project Financial Management

Communication

Customer Relations

Modernization of elevator

Field Operations

Professional Duties And Responsibility

  • Responsible for the all the installation stages starting from the site kick off meeting, material planning, material delivery and it's storage at site.
  • Ensure site readiness for the commence of installation which includes manpower and resource planning and consequently handing over of elevators to customer with stage wise payment collection.
  • Responsible of ensuring safety requirements that are followed at the site during erection and commissioning as per organization safety policies. Set up safety coordination, training, and inspections at site. Stimulating a prominent level of safety awareness always.
  • Monitor the installation process to verify that it aligns with approved designs and specifications. Conduct regular inspections and implement rigorous testing procedures for elevator systems to ensure their functioning, safety and compliance with quality and performance standards.
  • Ensure customer satisfaction and coordination to ensure smooth operations .
  • Handling testing and commissioning of elevators.
  • Supervising field crews to maximize quality and work efficiency by imparting technical trainings.
  • Ensure project deadlines are met, and efficient progress is achieved.
  • Monitor the project schedule and deliverable to avoid cost overruns .
  • Handle cash flow monitoring and provisions delivery on a daily work basis.
  • Maintain accurate and comprehensive reports which entire project installation process adopted and details.
  • Coordinating with other site engineers and supervisors on jobs rendered problems encountered at the site.
  • Handling the emergencies and other unforeseen events on sites.

Personal Information

  • Date of Birth: 04/18/1992
  • Nationality: Indian
  • Marital Status: Married
  • Passport No:- W7641227
  • Visa Type: L2

Declaration

I solemnly declare that the above-mentioned information is true and accurate to the best of my knowledge. 02/01/2024

Timeline

Construction supervisor

Otis Elevator India PVT Ltd
2022.09 - Current

Senior Project Engineer

Schindler India PVT Ltd
2021.03 - 2022.09

Senior Installation Engineer

Toshiba Johnson Elevators India PVT Ltd
2017.08 - 2021.03

Installation Engineer

ThyssenKrupp Elevator (I) Pvt. Ltd.
2015.03 - 2017.08

Bachelor of Technology - Electrical & Electronics

IMS Engineering College
2011.07 - 2015.08

12th Grade -

Kendriya Vidyalaya
2009.03 - 2010.03

10th Grade -

Kendriya Vidyalaya
Sameer SaxenaElevator Installation Engineer