A position as an electrical Assistant Engineer, electrical and electronic skills and knowledge will contribute to your company.
Overview
6
6
years of professional experience
Work History
Power Electronics Assistant Engineer
Ohmium operations Pvt Ltd
Bangalore
11.2018 - Current
Education
B-com -
Burdwan University
01.1994
Technical, Radio/TV course -
Bally Technical Institute
Skills
Analyzing system malfunctions
Understanding flyback inductor design and full bridge Transformer design
Knowledge of LT Spice simulation & PCB Design (pads software)
Testing method of power converter through DSO & function generator
Knowledge of “principle and application of Digital Electronics” & RF system
Performing comprehensive bench repairs, adjustment, troubles detection of electronic circuit
Testing of various type power supply
Troubleshooting abilities
Resourcefulness
Hard work
Fast learning
Knowledge of RT809F Bios programmer
Understanding basic concept of I2C & SPI communication & Can communication
Working with individuals from diverse backgrounds
Comfortable using MS Office & Internet Email
Roles And Responsibilities
Components conservation, having segregated package wise keeping different boxes all passive & active components separately in ascending order for R & D only
Giving components to engineers as per requirements & maintaining excel sheet of R & D
Testing converter, connecting thermocouple and multiplexer, as well as Datalogger
Mounting converter inside the chamber in order to grab the Temp Value of components
Writing the programs in User interface as per our convenient
Checking Temperature & waveshape while the converter is running
Making 60 Hz set up and arranging load as per requirement monitoring Power analyser Data logger value
Fault find out. Before replacement of any magnetics Lm and Lkm value always measuring and writing the note
New PCB visual checking before testing (whether all components orientation is correct or wrong) whether any wire touching heat sink or not in order to avoid catastrophic effect. Whether all screw of Y cap connected or not. Is there any unwanted solder ball or wire cut pc on the PCB or not. Creepage & Clearence as per UL 840 standard
Failure unit device replacement
Final testing unit observation all day long efficiency, components Temperature, input voltage setting, power factor, harmonics
Currentprojects
MARK_2.5 DC/DC converter, (55k Watt) control card/gate driver card testing & so on. (for Lotus Project)
HY STAR Project 60V DC and 240Amp current (14.4kWatt) half bridge tropology newly started
60k Watt three phase (Bi-directional 2 Lebel voltage source inverter as well as rectifier) PFC Control card & gate driver testing (for Lotus Project)
Reliabilitytesting
Thermal cycling test by dint of “ENV SYS Environmental chamber (ET 950) and Keysight (DAQ970A) Datalogger, multiplexer”.(IEC 62093 Clause 6.8 standard) (-40 to 60 Deg C)
Thermal Test various ambient (-40 to 60 Deg C) (Observing Max & Min limit is exceeding or not.)
Damp heat test (10 to 60 Deg C RH Factor 93) completed by dint of “ENV SYS Environmental chamber (ET 950) Keysight (DAQ970A) Data logger”. (IEC 62093 Clause 6.9 standard)
Humidity freeze test completed by dint of “ENV SYS Environmental chamber (ET 950) Keysight (DAQ970A) Data logger”.(IEC 62093 Clause 6.7 standard) (-40 to 60 Deg C and R H Factor 85)
Transformer short circuit test (UL) completed by dint of “Keysight Data logger” and User interface, DSO current probe and Rogowski coil
Mosfet short circuit test of full bridge. (UL)
Bus link capacitor test.(IEC 62093 Clause 6.5 standard) (25 to 60 Deg C, R H Factor 65)
Ventilation Block test (UL) 50% and 100% block
Power derating test at ambient (61 to 65 Deg C) by dint of Power analyser “Hioki PW8001” and Keysight Datalogger, multiplexer
Output rating test
Phase loss test
Phase imbalance test by dint of Ametek 22.5 Programmable power source
UVLO & OVP test by dint of “Solar Arrey Simulator” power supply of Chroma
Working Voltage test. (UL)
Load regulation & line regulation test
Dielectric test (UL) completed by dint of Chroma Hi Pot (Model 19073)
Ground bonding test. (UL) completed by dint of Chroma Ground Bond Tester (Model 19572)
Leakage current test (burn current & shock current) (By using R & C Network)
Component Max Temp Limit test completed by dint of Keysight Datalogger, multiplexer & ENV SYS Environmental chamber (ET 950), DELTA M70A_260 solar Grid Tie Inverter
Output short circuit test (UL) by dint of Tektronix MSO 2024B and LEM CT-LF 1010s
Input wiring missing test. (UL) by dint of UI and DSO and Differential Probe
Previouslycompletedprojects
Tested 36watt series resonance converter. (for Schneider Project completed)
400 Volt/1200 Amp pulse power supply. (for RCI Project completed)
156-watt DC/DC converter multiple output. (Toshiba Project for Railway completed)
24v/4.2Amp 80khz (Dc to Ac full bridge) +24v/2.5Amp dc/dc converter (Toshiba project for railway completed)
Single phase PFC 5.6kw development time worked (for 2U product of ENARKA completed)
2k watt Meru inverter (Input 48V output 240VAC)
1250-watt grid tie inverter testing & debugging control card. (Anchor project of ARKA energy)
Partiallycompletedprojects
Some linear power supply work (FISC project of MRI machine)
Battery Management Work (for VSSC Project)
Dual active bridge (Bidirectional power converter)
Learning
Power Electronics related concept
Coursework
Participated in seminar of LCD/LED TV repairing training program
Technical Field Advisor– Senior Engineer at Ohmium Operation India Private LimitedTechnical Field Advisor– Senior Engineer at Ohmium Operation India Private Limited