Summary
Overview
Work History
Education
Skills
Extra-Curricular Activities
Interests
Declaration
Personal Details
Timeline
Generic

Sandeep Kumar Patil

Bhopal

Summary

To work as a professional by contributing positive energy towards self and organization to reach the pinnacle of endeavored and success, in the field of Telecommunication & to achieve and maintain excellence with a goal-oriented approach in management.

Overview

19
19
years of professional experience

Work History

  • Involved in implementation of the GSM 900/1800/2100 system.
  • BTS (LTE-DUS3001) ,installation ,commissioning and integration activity done by (manually and smart-laptop)
  • Involved in U900 activity.
  • Involved in (GSM+LTE) activity.
  • Involved in (GSM+LTE+U900) activity).
  • BTS 6101 & 6202 (2G-Dug 2001&3G-DUW 2001), Installation and commissioning.
  • Involved in antenna swapping activity (2G ,3G AND 4G).
  • Mw installation, commissioning and alignment of Ericsson TN (2p&6p&20p).
  • BSC fault maintenance, alarm monitoring.
  • Installation of BTS and all its related equipments, sweep test (VSWR) testing use of site analyzer .(BIRD)
  • Performing site Acceptance test procedure after site is integrated.
  • Co-ordination with field technicians to resolve any network degrading faults generated at BTS sites
  • Handling Escalations & crises management for Emergencies.

Project Engineer

Ceragone in RIIL 4G Project
04.2015
  • Working in Ceragone in RIIL 4G Project from 4th April, 2015 as a Project Engineer.mw visibility and AT ceragone MW.

Operation & Maintenance Engineer

Reliance Communication Ltd
01.2008
  • Supervision for lying of OFC route, Trenching, Rerouting of OFC and Splicing of OFC on new route/ during OFC cut.
  • Responsible for surveillance & maintained of OFC of NLD and MA route.
  • End to End testing of OFC Link by Light Source Power Meter and OTDR.
  • Coordination with OSP-Fiber Team to ensure minimum outage time and increasing in Network Availability in Area.
  • Tektronix OTDR for measures length of the fiber cable, attenuation/loss, Connector/splice loss, Reflection loss and location of break in an OFC link.
  • Handling Electrical equipment’s like DG sets (Electrical & Mechanical Both side), SMPS, Battery Bank, AVR.PAC etc.
  • Taking care of SDH Network like monitoring the construction that can effect of OF Backbone.
  • Client: Reliance Operation and maintenance

INTRGATION Engineer

VRK Power Ltd
06.2025 - 10.2025
  • Client: Ericsson India Ltd.

Transmission Engg

RIPL
04.2025 - 06.2025
  • Client: TCS.

INTRGATION LEAD

NR Switch & Radio Services
12.2022 - 03.2025
  • Worked on-Site for 5G Jio project Implementation, Integration, Rectification & Acceptance of Baseband 6641 team coordination and RFI surway
  • Client: Ericsson India Ltd.

ZONAL LEAD

02.2016 - 12.2022
  • Client: Ericsson India Ltd.

NLD Fiber Engineer

Pratap Technocrats
05.2015 - 11.2015
  • ECI Bin20 10G 100G login fault maintenance.
  • Corrective & preventive maintenance of the Duct, Fiber and Utilities equipment in the various facilities in the Maintenance Point.
  • Responsible for 400 KM optical fiber line area.
  • Manage & coordinate with FRT team.
  • Maintain smooth operation of OFC (48F) Intercity.
  • Planning network redundancy through ring connectivity.
  • Installation of FMS. Maintenance of Backbone & Intercity routes by checking proper method of ducts laying, OFC Blowing, Splicing & OTDR Testing during major cable cuts and re-routing on the said routes.
  • Preventive Maintenance of Fiber network by routine/planned route surveillance, interacting with local residents, local authorities to save OFC network.
  • For Better Maintenance Check and Simulation of all Utility alarm in site.
  • Preventive Maintenance of Fiber network by routine/planned route surveillance, interacting with local residents, local authorities to save OFC network.
  • Client: Vodafone.

GTL Limited
06.2014 - 11.2015
  • Working as a cluster In charge in GTL O&M project in Bhopal cluster.
  • Responsible for maintaining more than 75 sites of Bhopal Cluster.
  • Handling 5 technician in my team in Bhopal cluster .
  • Responsible for the preventive & corrective maintenance for GTL sites with 99.96% network availability.
  • Responsible for the diesel filing and proper follow-up of diesel billing as well EB Billing, Summarize trackers like Site Electrification, Monthly Consumption of Power & Fuel.
  • Responsible for Vendor Bills verification such as DG spare parts, DG Hired, Material used in site fault rectification etc .
  • Responsible for execution of preventive maintenance timely & Earthling Measuring, Cabling, PM Report and DG Servicing.
  • Providing technical support to our field technician for various fault rectification in BTS, Power plant , battery bank , D.G set , A.C etc .
  • Responsible to share all the fault report , PM reports and daily progress report to our superiors.
  • Implementation, Commissioning and maintenance of DG, Battery Bank, Power Plant and AC with other infra related issue on sites.
  • Supervision of the Power Plant( DELTA,EMERSSION,ETON,ELTEK) & Battery Bank(HBL,AMAR RAJA,EXIDE ) installation and maintenance teams working in my zone.
  • Battery Bank Drain test for finding the battery bank life.(200,300,400,600AH).
  • Alarm rectification or integration though technicians.
  • Responsible for coordination with AC vendor(HITACHI,ACME,AMIGO) and D.G vendor(M&M,EICHER,KIRLOSKAR) for issue rectification.
  • Job profile/Responsibilities

Operation Support Engineer

Alcatel-Lucent Managed Solutions India Private Limited
04.2013 - 04.2014
  • Primarily responsible for all Transmission operation and maintenance activities of (CDMA, GSM & 3G BTS) sites at Betul& Itarsi region.
  • Installation, Commissioning, Alignment, Troubleshooting and Acceptance test of NEC (Pasolink,Neoi, NeoCPV & IP Redio )& Ceragon & NEC XPIC M/W equipments SDH & PDH links Successfully Commissioned.
  • Operation & Maintenance of all type of SDH transport equipments for troubleshooting and Monitoring of alarms. Fibcom, Nortel 16th XE, 4 XE, TN1C, NEC, OME 6110, 6500 & Nortel (DWDM).
  • Successfully Commissioned SDH Transmission equipments of Fibcom & Nortel (Software download, card Configured, Cross Connection Create, E-1 Drop, E-1 through, LAPD Create, Hard and Soft Loop Check between Site and BSC)
  • Celtro equipment E1 compares I&C and troubleshooting
  • Router (Maipu, Cisco). Installation & script configuration and NMS Visibility of the microwave link.
  • Handling the responsibility for planning of ADMs for Cell sites, POI sites and Back Bone sites.
  • Troubleshooting alarm on 3G sites like SCTP Down, Low VSWR, and fault on 2 port Ethernet.
  • Monitor protections for transport at critical BSC & Hub sites in coordination with Utility & BSS teams.
  • Supervising the technicians at site for planned & emergency maintenance activities ensuring minimal outage time.
  • Manage smooth running of utilities by keeping liaison with various vendors.
  • Managed maintenance of electrical equipments like DG Sets (30,25 & 15 kVA), Delta & Eltek Power Plant, Battery Banks, PAC, Servo Stabilizers, AVR PIU Set Installation & Commissioning etc.

I&C Engineer

SWIFTEL TECH
07.2006 - 12.2007
  • Successfully Installed SDH Transmission Equipment (Equipment Configured and fixed in rack, MCB installed for Power Supply, FDMS installed, DDF Installed, PCM or E1 cable routed and Punched at DDF).Successfully Commissioned SDH Transmission equipment (Software download, card Configured, Cross Connection Create, E1 Drop, E1 through, LAPD Create, Hard and Soft Loop Check between Site and MSC, E1 provisioning and Site on-air).
  • I have done successfully installation, commissioning, and Alignment and acceptance test of NEC & Nokia BTS and Microwave PDH & SDH link.
  • Installation, Commissioning, Alignment and Acceptance test of NEC M/W equipments SDH & PDH links.
  • Clients: Railtel

Education

Diploma - Electronics & Telecommunication

S.A.T.I. Polytechnic Vidisha
Bhopal
01.2006

Intermediate - undefined

03.2002

Matriculation - undefined

03.2000

Skills

Time management

Quality control

Project planning

Technical reporting

Extra-Curricular Activities

Chess, Cricket, Volleyball

Interests

Listing music & Watching movies

Declaration

I consider myself familiar with the Telecommunication Engineering aspects. I am also confident of my ability to work individually as well as in a team and I will prove myself as an asset if given chance to work with the organization. I hereby declare that the information furnished above is true to the best of my knowledge and belief Date: 2026-01-06 Place: BHOPAL

Personal Details

  • Father`s Name :- Shri.Panjabraw Patil
  • Mather`s Name :- Smt.Bhagrati patil
  • Date of Birth :-11/11/1983
  • Nationality :- Indian
  • Religion :-Hindu
  • Sex:- Male
  • Marital Status :- married
  • Language :- English & Hindi

Timeline

INTRGATION Engineer

VRK Power Ltd
06.2025 - 10.2025

Transmission Engg

RIPL
04.2025 - 06.2025

INTRGATION LEAD

NR Switch & Radio Services
12.2022 - 03.2025

ZONAL LEAD

02.2016 - 12.2022

NLD Fiber Engineer

Pratap Technocrats
05.2015 - 11.2015

Project Engineer

Ceragone in RIIL 4G Project
04.2015

GTL Limited
06.2014 - 11.2015

Operation Support Engineer

Alcatel-Lucent Managed Solutions India Private Limited
04.2013 - 04.2014

Operation & Maintenance Engineer

Reliance Communication Ltd
01.2008

I&C Engineer

SWIFTEL TECH
07.2006 - 12.2007

Intermediate - undefined

Matriculation - undefined

Diploma - Electronics & Telecommunication

S.A.T.I. Polytechnic Vidisha
Sandeep Kumar Patil