ResearchAssistant
Sandeep Singh

Sandeep Singh

Gurdaspur

Summary

As a Manager The executive manager interacts with the management, marketing, and production staff to discuss the ongoing project's specifications and procedures. They are generally responsible for all the project work and are answerable to high-level authorities. They provide detailed information on the project. The executive manager is the first point of contact for all the engineers and assistant engineers.

Overview

9
9
years of professional experience

Work History

Site Manager

ENSOVA ENERTECH SOLUTIONS PVT. LTD.
04.2024 - Current
  • Boiler, TG, BOP Regular maintenance and annual overhauling
  • Client: Adani Power Rajasthan Ltd, Kawai 2x660MW
  • Managed daily operations of the site, including staff and contractors.
  • Ensured compliance with safety protocols, regulations and standards.
  • Developed strategies to improve operational efficiency and reduce costs.
  • Monitored job progress to ensure quality standards were met.
  • Coordinated workflow between departments to maximize productivity.
  • Responded promptly to customer inquiries or complaints.
  • Maintained records of inventory, assets, personnel and other relevant data.
  • Prepared budgets and monitored expenses to stay within allocated limits.
  • Resolved conflicts between staff members in a timely manner.
  • Negotiated contracts with suppliers for services such as catering or transportation needs.
  • Interviewed and hired qualified candidates to fill open staff positions.

Site Manager

Simar Infrastructure Pvt. Ltd.
10.2022 - 03.2024
  • Boiler, TG, BOP Regular maintenance and Annual Overhauling
  • Client: JSW Energy Barmer 8x135MW
  • Managed daily operations of the site, including staff and contractors.
  • Ensured compliance with safety protocols, regulations and standards.
  • Developed strategies to improve operational efficiency and reduce costs.
  • Analyzed reports to identify areas for improvement in performance or cost savings.
  • Prepared budgets and monitored expenses to stay within allocated limits.
  • Negotiated contracts with suppliers and subcontractors, optimizing budget efficiency.

Site Manager

Simar Infrastructure Pvt. Ltd.
08.2022 - 10.2022
  • Boiler overhauling Unit-3
  • Client: Adani Power Rajasthan Kawai 2x660MW
  • Managed daily operations of the site, including staff and contractors.
  • Ensured compliance with safety protocols, regulations and standards.
  • Developed strategies to improve operational efficiency and reduce costs.

Site Manager

Simar Infrastructures Ltd.
05.2020 - 07.2022
  • Maintenance of Essar Thermal Power Plant Mahan 2x600MW
  • Client: Essar Power MP Ltd
  • Village - Bandhora, Singrauli, MP
  • Monitored job progress to ensure quality standards were met.
  • Coordinated workflow between departments to maximize productivity.
  • Scheduled maintenance tasks and ensured all equipment was functioning properly.
  • Responded promptly to customer inquiries or complaints.
  • Maintained records of inventory, assets, personnel and other relevant data.
  • Analyzed reports to identify areas for improvement in performance or cost savings.

Site Manager

Simar Infrastructures Ltd.
01.2020 - 03.2020
  • Overhauling (shutdown) at NPL Power Plant 2x700.
  • Conducted routine inspections and maintenance of boilers, pumps and valves to ensure efficient operation.
  • Performed troubleshooting activities to identify the root cause of boiler issues.
  • Assisted in designing new systems for existing boilers to improve efficiency.
  • Provided technical support and advice to customers regarding their boiler needs.
  • Instructed customers on proper use of their equipment following the completion of repair work.
  • Identified issues and brought them to the attention of the foreman.
  • Managed movement of materials and equipment to different job sites.
  • Assembled and checked each boiler for defects.

Assistant Manager

Simar Infrastructures Ltd.
12.2018 - 12.2018
  • Boiler overhauling Unit-3
  • Client: Reliance Power Limited
  • Shajanpur, Rosa, UP
  • Assisted in the development of operational strategies to ensure efficient and productive operations.
  • Provided guidance and support to junior staff members on daily tasks, projects, and objectives.
  • Ensured compliance with safety regulations and company policies.

Engineer

Simar Infrastructures Ltd.
09.2017 - 10.2017
  • ESP shutdown & Bottom Ash chain scraper shutdown work
  • APH shutdown
  • APH guide bearing and support bearing inspection
  • APH basket replacement and structural support repair work
  • Thickness survey of Duct
  • Client: Vedanta Power Limited Talwandi Sabo, Mansa, Punjab

Engineer

Simar Infrastructures Ltd.
03.2016 - 03.2017
  • Structural Steel Erection Works
  • Mechanical &Instrumentation Installation like Burner, and soot blower
  • Client: Reliance Industries Pvt
  • Ltd

Engineer

Simar Infrastructures Ltd.
03.2017
  • ESP overhauling in Unit- 2
  • ESP collecting plate and emitting rod replacement work
  • ESP field alignment work
  • Fire water line maintenance (sprinkler system installed)
  • Client: Vedanta Power Limited Talwandi Sabo, Mansa, Punjab

Education

B.E - Mechanical Engineering

Golden College of Engineering & Technology
Gurdaspur Punjab
01.2016

Diploma in Computer Science

SSS. Polytechnic Gurdaspur
Gurdaspur, Punjab
07-2012

Skills

  • Team-oriented
  • Team Leadership
  • Budget Development
  • Inventory Management
  • OSHA safety requirements
  • Site Inspection and Management
  • Quality Assurance
  • Project Management
  • Negotiation
  • Workforce Planning
  • Customer Relationship Management
  • Site Management
  • SOP Development
  • Heavy Lifting
  • Relationship Building
  • Site coordination
  • Subcontractor Management
  • Results-driven
  • Public Relations
  • Day-to-day work planning
  • Monthly billing
  • Execution and supervision of metallurgical test work
  • Development of piping and instrumentation diagrams
  • Organize AOH schedule & budget planning
  • Manpower estimation for scheduled work
  • Cost estimation and cost control
  • Mobilization of new projects
  • Expertise in MS Excel
  • Expertise in MS Word
  • Expertise in PowerPoint
  • Expertise in SAP Software

Projects

Super Heater Erection Work, 03/01/16 - 03/01/17, Reliance Industries Pvt. Ltd. Jamnagar., Engineer (Simar Infrastructures Ltd.), Structural Steel Erection Works., Mechanical & Instrumentation Installation like Burner, and soot blower. Overhauling (shutdown) at TSPL Thermal Power Plant 3x660MW, 03/01/17, Vedanta Power Limited Talwandi Sabo, Mansa, Punjab., Engineer (Simar Infrastructures Ltd.), ESP overhauling in Unit- 2., ESP collecting plate and emitting rod replacement work., ESP field alignment work., Fire water line maintenance (sprinkler system installed). Overhauling (shutdown) at TSPL Thermal Power Plant 3x660MW, 09/01/17 - 10/01/17, Vedanta Power Limited Talwandi Sabo, Mansa, Punjab., Engineer (Simar Infrastructures Ltd.), ESP shutdown & Bottom Ash chain scraper shutdown work., APH shutdown., APH guide bearing and support bearing inspection., APH basket replacement and structural support repair work., Thickness survey of Duct. Overhauling (shutdown) at Reliance Power Plant 4x300, 12/01/18 (25 Days), Reliance Power Limited. Shajanpur, Rosa, UP., Site In-charge (Simar Infrastructures Ltd.), Boiler overhauling Unit-3. Overhauling (shutdown) at NPL Power Plant 2x700, 01/01/20 (70 Days), TATA Power Limited, Mundra, Gujrat., Sr. Engineer (Simar Infrastructures Ltd.), APH and ESP overhauling Unit-1. Maintenance of Essar Thermal Power Plant Mahan 2x600MW, 05/01/20 - 06/01/21, Essar Power MP Ltd. Village - Bandhora, Singrauli, MP., Site In-charge (Simar Infrastructures Ltd.) Overhauling (shutdown) at TSPL Thermal Power Plant 3x660MW, 06/01/21, Vedanta Power Limited Talwandi Sabo, Mansa, Punjab., Site In-charge (Simar Infrastructures Ltd.), Boiler Overhauling in Unit-3. Maintenance of Bajaj LPGCL Thermal Power Plant Mahan 3x660MW, 07/01/21 - 09/01/21, Bajaj Energy Limited, Lalitpur Power Generation Company Limited (LPGCL) in Uttar Pradesh., Site In-charge (Encotec Energy India Pvt. Ltd.) Overhauling (shutdown) at JITPL Thermal Power Plant 2x600MW, 09/01/21 (45 Days), Jindal India Thermal Power Ltd (JITPL) Angul, Orissa., Site In-charge (Encotec Energy India Pvt. Ltd.), Boiler Overhauling in Unit-1. Overhauling (shutdown) at Reliance Power Plant 4x300, 12/01/21 (25 Days), Reliance Power Limited. Shajanpur, Rosa, UP., Site In-charge (Encotec Energy India Pvt. Ltd.), Boiler overhauling Unit-3. Maintenance of JSW Thermal Power Plant 4x300MW, 01/01/22 to 07/01/22, JSW Energy Power Ltd. Ratnagiri Maharashtra., Site Coordinator from Head Office (Encotec Energy India Pvt. Ltd.) Adani Power Rajasthan Kawai 2x660MW, 08/01/22 to 10/01/22, Site In-charge (Simar Infrastructure Pvt. Ltd.), Boiler overhauling Unit-3. JSW Energy Barmer 8x135MW, 10/01/22 to 11/01/23, Site In-charge (Simar Infrastructure Pvt. Ltd.), Boiler, TG, BOP Regular maintenance and Annual Overhauling. Adani Power Rajasthan Ltd, Kawai 2x660MW, 12/01/23 to Current, Site In-charge (Simar Infrastructure Pvt. Ltd.), Boiler, TG, BOP Regular maintenance and annual overhauling. JSW Energy Barmer 8x135MW, 08/01/24 to 09/01/23 (25 Days), Site In-charge (Simar Infrastructure Pvt. Ltd.), Boiler Annual Overhauling (Unit- 3)., Water wall panel replacement work and tube replacement work., Cyclone damage plate replacement work., Vertex replacement work., APH, FAN Overhauling work., Chute replacement work., Duct and damper repair work.

Disclaimer

I, Sandeep Singh, hereby declare that the information contained herein is true and correct to the best of my knowledge and belief.

Languages

  • English, Fluent (speaking, reading, writing)
  • Hindi, Fluent (speaking, reading, writing)
  • Punjabi, Native language

Personal Information

  • Age: 36
  • Father's Name: Mr. Pritam Singh
  • Date of Birth: 03/21/87
  • Gender: Male
  • Nationality: India
  • Marital Status: Married

Timeline

Site Manager

ENSOVA ENERTECH SOLUTIONS PVT. LTD.
04.2024 - Current

Site Manager

Simar Infrastructure Pvt. Ltd.
10.2022 - 03.2024

Site Manager

Simar Infrastructure Pvt. Ltd.
08.2022 - 10.2022

Site Manager

Simar Infrastructures Ltd.
05.2020 - 07.2022

Site Manager

Simar Infrastructures Ltd.
01.2020 - 03.2020

Assistant Manager

Simar Infrastructures Ltd.
12.2018 - 12.2018

Engineer

Simar Infrastructures Ltd.
09.2017 - 10.2017

Engineer

Simar Infrastructures Ltd.
03.2017

Engineer

Simar Infrastructures Ltd.
03.2016 - 03.2017

B.E - Mechanical Engineering

Golden College of Engineering & Technology

Diploma in Computer Science

SSS. Polytechnic Gurdaspur
Sandeep Singh