As a Manager The executive manager interacts with the management, marketing, and production staff to discuss the ongoing project's specifications and procedures. They are generally responsible for all the project work and are answerable to high-level authorities. They provide detailed information on the project. The executive manager is the first point of contact for all the engineers and assistant engineers.
Super Heater Erection Work, 03/01/16 - 03/01/17, Reliance Industries Pvt. Ltd. Jamnagar., Engineer (Simar Infrastructures Ltd.), Structural Steel Erection Works., Mechanical & Instrumentation Installation like Burner, and soot blower. Overhauling (shutdown) at TSPL Thermal Power Plant 3x660MW, 03/01/17, Vedanta Power Limited Talwandi Sabo, Mansa, Punjab., Engineer (Simar Infrastructures Ltd.), ESP overhauling in Unit- 2., ESP collecting plate and emitting rod replacement work., ESP field alignment work., Fire water line maintenance (sprinkler system installed). Overhauling (shutdown) at TSPL Thermal Power Plant 3x660MW, 09/01/17 - 10/01/17, Vedanta Power Limited Talwandi Sabo, Mansa, Punjab., Engineer (Simar Infrastructures Ltd.), ESP shutdown & Bottom Ash chain scraper shutdown work., APH shutdown., APH guide bearing and support bearing inspection., APH basket replacement and structural support repair work., Thickness survey of Duct. Overhauling (shutdown) at Reliance Power Plant 4x300, 12/01/18 (25 Days), Reliance Power Limited. Shajanpur, Rosa, UP., Site In-charge (Simar Infrastructures Ltd.), Boiler overhauling Unit-3. Overhauling (shutdown) at NPL Power Plant 2x700, 01/01/20 (70 Days), TATA Power Limited, Mundra, Gujrat., Sr. Engineer (Simar Infrastructures Ltd.), APH and ESP overhauling Unit-1. Maintenance of Essar Thermal Power Plant Mahan 2x600MW, 05/01/20 - 06/01/21, Essar Power MP Ltd. Village - Bandhora, Singrauli, MP., Site In-charge (Simar Infrastructures Ltd.) Overhauling (shutdown) at TSPL Thermal Power Plant 3x660MW, 06/01/21, Vedanta Power Limited Talwandi Sabo, Mansa, Punjab., Site In-charge (Simar Infrastructures Ltd.), Boiler Overhauling in Unit-3. Maintenance of Bajaj LPGCL Thermal Power Plant Mahan 3x660MW, 07/01/21 - 09/01/21, Bajaj Energy Limited, Lalitpur Power Generation Company Limited (LPGCL) in Uttar Pradesh., Site In-charge (Encotec Energy India Pvt. Ltd.) Overhauling (shutdown) at JITPL Thermal Power Plant 2x600MW, 09/01/21 (45 Days), Jindal India Thermal Power Ltd (JITPL) Angul, Orissa., Site In-charge (Encotec Energy India Pvt. Ltd.), Boiler Overhauling in Unit-1. Overhauling (shutdown) at Reliance Power Plant 4x300, 12/01/21 (25 Days), Reliance Power Limited. Shajanpur, Rosa, UP., Site In-charge (Encotec Energy India Pvt. Ltd.), Boiler overhauling Unit-3. Maintenance of JSW Thermal Power Plant 4x300MW, 01/01/22 to 07/01/22, JSW Energy Power Ltd. Ratnagiri Maharashtra., Site Coordinator from Head Office (Encotec Energy India Pvt. Ltd.) Adani Power Rajasthan Kawai 2x660MW, 08/01/22 to 10/01/22, Site In-charge (Simar Infrastructure Pvt. Ltd.), Boiler overhauling Unit-3. JSW Energy Barmer 8x135MW, 10/01/22 to 11/01/23, Site In-charge (Simar Infrastructure Pvt. Ltd.), Boiler, TG, BOP Regular maintenance and Annual Overhauling. Adani Power Rajasthan Ltd, Kawai 2x660MW, 12/01/23 to Current, Site In-charge (Simar Infrastructure Pvt. Ltd.), Boiler, TG, BOP Regular maintenance and annual overhauling. JSW Energy Barmer 8x135MW, 08/01/24 to 09/01/23 (25 Days), Site In-charge (Simar Infrastructure Pvt. Ltd.), Boiler Annual Overhauling (Unit- 3)., Water wall panel replacement work and tube replacement work., Cyclone damage plate replacement work., Vertex replacement work., APH, FAN Overhauling work., Chute replacement work., Duct and damper repair work.
I, Sandeep Singh, hereby declare that the information contained herein is true and correct to the best of my knowledge and belief.