Accomplished civil engineering leader with a distinguished career at H. P. State Electricity Board Ltd., adept in project planning and process development. Spearheaded high-stakes projects, including the Smart City initiative, showcasing exceptional technical reporting and strategic execution skills. Recognized for enhancing system design and product development, with a notable achievement as “MAN OF YEAR (Engineering)”.

Overview

27
27
years of professional experience

Work History

Superintending Engineer (Civil)

Beas Valley Power Corporation Ltd.
Jogindernagar
04.2022 - Current
  • Head of Construction Circle Uhl Stage III, comprising of 4 nos
  • Of Divisions having 4 nos
  • Addl SEs & Sr XENs
  • Mainly Associated with execution works as Engineer in charge of following packages
  • Dismantling of existing Surface Penstock fabricated from SAILMA 550 HI Steel Complete Detailed Design & Fabrication Drawings for its replacement Supply of steel plates, Storage, Fabrication, Testing, Painting, Transportation to project site, Erection and Commissioning of Surface, steel In-liners Cladding work of Penstock and its specials, complete in all respect including execution of allied civil works (Designs/ construction Drawings) for Uhl-Stage-III (100MW) HEP
  • Joginder Nagar, Distt
  • Mandi, Himachal Pradesh
  • Package cost :- 104 Cr (Approx.) Execution works in progress and about 945 m (2300MT) of penstock fabricated & erected of SAILMA now replaced with ASTM 517 class 1 wok is completed
  • Water filling in progress
  • Associated with Estimation tendering execution of PPV for UHL HEP stage III
  • Package cost:- 7 Cr work completed
  • Associated with estimation tendering execution of restoration works of HRT 3.4 m dia & 8.5 m long comprising of dismantling of damaged concrete portion at 11 locations and replacement of adit plug by cutting with diamond wire saw cutter, core cutting machine and fabrication, erection of adit pug gate 2.5x2.5 m clear size
  • Package cost:- 1.9 Cr, work completed, Water filling completed
  • Associated with Arbitration Case pertaining to UHL Stage III about 14 Nos
  • (Cost 250 Cr) Approx
  • And M/s PES Engineers Ltd
  • 1000 Cr
  • Arbitration case initial Stage claiming all losses and damages to BVPCL
  • Associated with pending cases of Final Billing and Extension & Deviation of already completed works of main packages

Addl. Superintending Engineer (Civil)

H. P. State Electricity Board Ltd.
03.2021 - 03.2022
  • Worked in Raison Construction Division HPSEBL Mandi
  • Associated with Estimation, planning and execution work of c/o Electrical System Complex building at Mattansidh Hamirpur (Board's new building stand completed) and Cafeteria building at Larji (Distt
  • Kullu) under the GoHP scheme 'Nai Raahein Nai Manzillein'
  • Major repair of Field hostel at Anu (Hamirpur) and Rest House at Tarna (Mandi)

General Manager

H. P. State Electricity Board Ltd.
05.2020 - 03.2021
  • Worked in Smart City Ltd
  • Deputed as Technical Head and overall in charge in DSCL
  • Assigned with the Planning, Estimation Procurement of tenders, Contract & Execution for various works under Smart City Project like Implementation of E- NagarPalika online system, Smart Class Rooms, Roof Top Solar Power Plants 452 KWP, Smart Bus Shelters, Improvement of Walkways & Stairs, Parking Near Lord Dalia Lama Temple, Up gradation of Mountaineering Institute, Smart Road from Education Board to Bus Stand, Preparation of DPS & Tendering stage, LED - Based Smart Street Lighting in PAN-City, Parks & Play Fields In Boy School, Roof Top Solar Power Plants 110 KWP Phase II, Line Departments
  • DPR Approved JSV:-Augmentation of Sewerage System at Gamru, Fecal Sludge & Septage Mgt
  • System, Root Zone based STP for at Dharmshala 4 locations, Root Zone based STP for Naddi, Forest :-Nature Park under Eco Tourism, HPSEBL:-Smart Metering, Under Ground Cabling & Utility Shifting, Relocation of Bare Conductor with AB Cable, PWD :- Inclusive streets, HRTC:- E-Buses and infrastructure Development
  • Overall participation in planning/ tendering/ execution of the Smart City Project schemes amounting to Rs
  • 200 Cr
  • (Approx) which were undertaken During my tenure in DSCL

Asst. General Manager

H. P. State Electricity Board Ltd.
09.2018 - 05.2020
  • Worked in Smart City Ltd
  • Assigned with the Planning, Estimation Tendering & Execution for various works under Smart City Project

Sr. Executive Engineer (Civil)

H. P. State Electricity Board Ltd.
03.2018 - 04.2018

Sr. Executive Engineer (Civil)

H. P. State Electricity Board Ltd.
Nagrota Bagwan
02.2016 - 03.2018
  • Worked in Civil Cell North Wing HPBSMDA Nagrota Bagwan
  • New office created by Authority and Assigned with the Planning, Estimation Tendering & Execution for c/o New Bus stands, R/M of Existing Bus Stands, HRTC workshops, Deposit works and Monitoring of Bus Stand on PPP modes in 7 Distt of HP i.e
  • Chamba, Kangra, Una, Bilaspur, Hamirpur Nalagrah, Baddi in distt Solan and Joginder Nagar In Distt Mandi
  • Constructed New Bus Stand at Chamba, Nurpur, Baroh, Swarghat (In Progress) and New HRTC Workshops at Una and Nagrota Bagwan
  • Repatriated Back to HPSEBL after a period of 2 year and 1 Month

Sr. Executive Engineer (Civil)

H. P. State Electricity Board Ltd.
Shimla
08.2015 - 02.2016
  • Worked in Maintenance Division HPSEBL Head Office Shimla
  • Procurement & Maintenance of Vehicles & electronic equipment of HO
  • R/M Of Rest House Shimla & Delhi
  • R/M Of HPSEBL Colony and Head Office Buildings & New Civil works under the Jurisdiction of Division

Sr. Executive Engineer (Civil)

Punnasangchhu Hydro Electric Project
Bhutan
11.2013 - 08.2015
  • Posted in Power house circle, assigned with the construction works of Headrace Tunnel (from Surge Shaft), Surge Shaft, Butterfly Valve Chamber, Pressure Shaft, Power House and Tailrace Tunnel including Hydro Mechanical Works & Billing of Main Package in Bhutan
  • In addition to above assigned with the construction of one no
  • Prestress Concrete Cantilever Bridge +174 m span & Steel bailley Bridge +42m span on Punnasangchhu River
  • C/o NH diversion Road 600m long
  • Also assigned with the additional Charge of PHPA-2 for planning & execution of Power House & infra works in initial stage for a period of one year in 2014-15
  • Awarded as “MAN OF YEAR (Engineering)” in 2015 and appreciation letter for rendering outstanding Services after completion of tenure
  • Opted for Repatriation Back to HPSEBL after 5 years deputation period in Bhutan

Assistant Executive Engineer (Civil)

Punnasangchhu Hydro Electric Project
Bhutan
08.2010 - 11.2013
  • Posted in Power house circle, Punnasangchhu Hydro Electric Project (1200 MW) which was under construction & assigned with the construction works of Headrace Tunnel (from Surge Shaft), Surge Shaft, Butterfly Valve Chamber, Pressure Shaft, Power House and Tailrace Tunnel including Hydro Mechanical Works at Rurichu

Assistant Executive Engineer (Civil)

Beas Valley Power Corporation Ltd.
Jogindernagar
06.2009 - 07.2010
  • Construction works of Trench Weir 25 m long comprising Of Shingle flushing Channel 300 m long & feeder Channel 150m long from regulating structure, Desilting Tank of 2 Chambers 48m long & branch channels i/c silt flushing arrangements total 150 m long & Power Channel RCC Box type, cut & cover 2.0 KM Long along with road & protection works for a discharge of 17.87 Cumecs at Rana site in vill Bharolu J/Nagar
  • Foreign Deputation in PHPA Bhutan Joint Venture of Govt
  • Of India And Royal Govt
  • Of Bhutan (5 Years)

Assistant Engineer (Civil)

H. P. State Electricity Board Ltd.
Shahpur
07.2005 - 06.2008
  • C/o open surface Power house building, switch yard, Tail race & other allied works, c/o Darini to Power House Road, c/o Residential, Non-Residential buildings in HPSEB Colony, its protection works, R/M of water supply scheme, HPSEB Rest house etc
  • Construction of RCC T- Beam Bridge of 15 m span
  • The project successfully commissioned and generating electricity
  • Prepared the revised Detailed Project Report & completion report based on the actual expenditure involved for the construction of Project

Assistant Engineer (Civil)

H. P. State Electricity Board Ltd.
Sundernagar
06.2005 - 07.2005
  • Study of Hydro-mechanical components of Khauli, H.E.P

Junior Engineer (Civil)

H. P. State Electricity Board Ltd.
Shahpur
10.2001 - 06.2005
  • C/o Darini to Power House site road
  • Excavation & concreting of a Tail race intermediate stretch as per drawings

Junior Engineer (Civil)

H. P. State Electricity Board Ltd.
Bharmour
10.1997 - 09.2001
  • Involved in construction of project components Setling Basin, Trench weir, Approach Channel, Forebay etc, & repair maintenance of residential, Non residential buildings, rest shed, vehicles, allied works, watch & ward of Explosive Magazines, preparation of Daily, weekly, Monthly Progress reports
  • Construction work of head race tunnel 325 m long on labour rate basis
  • The project successfully commissioned and generating electricity

Education

Diploma - Civil Engg.

Himachal Pradesh Takniki Shiksha Board
Himachal Pradesh

A.M.I.E. - Civil Engg.

The Institution of Engineers (India)
Kolkata

10th -

HP Board of School Education
Dharamshala, H.P.

12th -

HP Board of School Education
Dharamshala, HP

Skills

  • Project Planning
  • Process Development
  • System Design
  • Product Development
  • Project Estimation
  • Technical reporting

Currentemployer

H. P. State Electricity Board Ltd., Uhl Stage III Construction Circle, Joginder Nagar, Himachal Pradesh, 176120

Personal Information

  • Passport Number: F 8765332
  • Father's Name: Late Sh. Thakur Dass
  • Date of Birth: 06/26/75
  • Nationality: Indian
  • Marital Status: Married

Timeline

Superintending Engineer (Civil)

Beas Valley Power Corporation Ltd.
04.2022 - Current

Addl. Superintending Engineer (Civil)

H. P. State Electricity Board Ltd.
03.2021 - 03.2022

General Manager

H. P. State Electricity Board Ltd.
05.2020 - 03.2021

Asst. General Manager

H. P. State Electricity Board Ltd.
09.2018 - 05.2020

Sr. Executive Engineer (Civil)

H. P. State Electricity Board Ltd.
03.2018 - 04.2018

Sr. Executive Engineer (Civil)

H. P. State Electricity Board Ltd.
02.2016 - 03.2018

Sr. Executive Engineer (Civil)

H. P. State Electricity Board Ltd.
08.2015 - 02.2016

Sr. Executive Engineer (Civil)

Punnasangchhu Hydro Electric Project
11.2013 - 08.2015

Assistant Executive Engineer (Civil)

Punnasangchhu Hydro Electric Project
08.2010 - 11.2013

Assistant Executive Engineer (Civil)

Beas Valley Power Corporation Ltd.
06.2009 - 07.2010

Assistant Engineer (Civil)

H. P. State Electricity Board Ltd.
07.2005 - 06.2008

Assistant Engineer (Civil)

H. P. State Electricity Board Ltd.
06.2005 - 07.2005

Junior Engineer (Civil)

H. P. State Electricity Board Ltd.
10.2001 - 06.2005

Junior Engineer (Civil)

H. P. State Electricity Board Ltd.
10.1997 - 09.2001

Diploma - Civil Engg.

Himachal Pradesh Takniki Shiksha Board

A.M.I.E. - Civil Engg.

The Institution of Engineers (India)

10th -

HP Board of School Education

12th -

HP Board of School Education
Sanjeevan Dhiman