Overview
Work History
Skills
Timeline
Santhosh  James

Santhosh James

Plumber, Electrician and Painter
Chennai,TN

Overview

22
22
years of professional experience
3
3
Languages

Work History

Electrician, Plumber and Painter

Freelancing
04.2007 - Current
  • Upheld company reputation for excellence through diligent adherence to established quality standards throughout each painting project.
  • Improved team productivity by providing guidance, training, and support to junior painters as needed.
  • Expertly executed surface preparation tasks such as sanding, scraping, and priming before applying paint for long-lasting results.
  • Performed minor repair tasks like patching holes or sanding rough areas before painting to ensure a smooth and even final result.
  • Skillfully operated power tools such as pressure washers or spray guns for efficient exterior painting projects.
  • Enhanced client satisfaction with meticulous attention to detail and consistent color matching.
  • Delivered visually appealing results by expertly applying various types of paint finishes, including matte, satin, gloss, and semi-gloss coatings.
  • Maintained clean job sites by promptly disposing of debris, unused materials, and cleaning tools after each task''s completion.
  • Prevented delays in project timelines by addressing unforeseen challenges proactively and implementing effective solutions promptly.
  • Reduced paint waste by accurately calculating required materials and utilizing effective painting techniques.
  • Removed fixtures such as pictures, doorknobs, lamps, and electric switch covers prior to painting.
  • Used brushes, spray guns and paint rollers to paint surfaces.
  • Monitored and adjusted painting techniques for optimal results.
  • Applied primers or sealers to prepare new surfaces such as bare wood or metal, for finish coats.
  • Used sandpaper, scrapers, grinders, and steel wool to smooth surfaces.
  • Operated power sprayers and hand tools to prepare and paint large areas.
  • Painted indoor areas such as hallways, bathrooms, and lobbies.
  • Protected surfaces from damage and spills by using drop cloths prior to and during painting.
  • Prepared surfaces and surrounding areas for painting using sandpaper, tape, and other materials.
  • Applied putty, wood filler, spackling, and caulks to prep uneven surfaces and fill in holes.
  • Painted surfaces using brushes, spray guns, and paint rollers.
  • Prepared trim, walls and ceilings for painting by cleaning, smoothing, and priming.
  • Repaired wall holes and scrapes.
  • Climbed scaffolding, staging, ladders, and planks to reach work area surfaces and observed safety protocols to prevent falls.
  • Upgraded outdated plumbing systems to modern standards enhancing functionality while increasing property value for clients.
  • Performed regular maintenance on plumbing systems to prevent costly future repairs for customers.
  • Reduced water waste for clients by installing eco-friendly fixtures and appliances.
  • Resolved emergency plumbing situations quickly and efficiently to minimize property damage for customers.
  • Repaired plumbing systems, components, and equipment.
  • Selected type and size of piping required for each project.
  • Operated drill motors, grinders, chop saws, hack saws, and burning torches to perform tasks.

Electrical Technician

Rozario ( Sound & Electricals )
04.2002 - 04.2007
  • Supported the design process by providing technical expertise on electrical systems requirements, layout, and component selection.
  • Reduced downtime by troubleshooting and repairing faulty electrical components promptly.
  • Assisted in new equipment installations, guaranteeing proper setup and optimal performance.
  • Managed multiple projects simultaneously while maintaining high levels of quality control throughout each project''s lifecycle.
  • Coordinated closely with vendors to procure high-quality materials while meeting budget constraints.
  • Safeguarded personnel and equipment by adhering to strict safety protocols during all tasks.
  • Maintained detailed records of all repairs, maintenance tasks, and inventory for accurate tracking purposes.
  • Installed electrical conduit and wiring for power, controls, and lighting.
  • Disconnected and removed motors and pumps.
  • Installed electrical wiring through conduits and holes in both flooring and walls.
  • Tested wiring and other system parts for electrical flow and function.
  • Performed preventive maintenance tasks to verify proper working condition of electrical panels and conduits.
  • Estimated numerical length of runs during new service installations.
  • Replaced faulty wiring, switches and circuit breakers to reduce fire risks, boost service capacity and increase versatility.

Skills

Electrical Repairs

Timeline

Electrician, Plumber and Painter - Freelancing
04.2007 - Current
Electrical Technician - Rozario ( Sound & Electricals )
04.2002 - 04.2007
Santhosh JamesPlumber, Electrician and Painter