Working as Assistant Consultant in QA at TCS, Hyderabad with over 9+ Years experience of successful
in Manual Testing & Automation Testing and Mobile testing Android & IOS applications Overall 14+ years' experience. in IT industry. Recognized Consistently for performance excellence and contributions to success in Telecom (OSS/BSS),Utilities(GIS/OMS/CIS?MDMS?ADMS?DMS/Smart Grid),GIS(Gas/Telecom/Power) industries. Strengths in Agile scrum could compute and Well versed with all stages of SDLC & Digital technologies) and Software Testing Life Cycle (STLC). Experience in defining Testing Methodologies, Designing Test Scenarios in BDD and Test Cases preparations , Test execution Hands on as Team player with Strong focus on Manual , Functional Testing,Database Testing, API Testing, Database Migration on premise to Cloud other skills on Documentation, Communication, Process and constant improvements.
The scope is setting up Operational Data Store (ODS) in SQL server for ARCOS transactional data and creating the reports using Power BI
Responsibilities
FERC Order No. 2222 will help usher in the electric grid of the future and promote competition in electric markets by removing the barriers preventing distributed energy resources (DERs) from competing on a level playing field in the organized capacity, energy and ancillary services markets run by regional grid operators. With the FERC Order 2222 , all electrical distribution utilities need to allow them to participate wholesale market through aggregation.
Responsibilities:
National Grid is an energy company operating in the UK and US. NGRID-US is expanding its regional telecommunications network to connect network devices to their corresponding applications through a highly reliable, cost effective network. Remote monitoring and control of company gas and electric services are enabled by these telecommunications applications and network devices.
Responsibilities:
Achievements:
Open Reach WFM is the Web based application and Mobile based Android & IOS based application to field user to survey the daily job s and update the work summary and asset field survey
Responsibilities:
NetLink Trust is the foundation of Singapore’s Next Generation Nationwide Broadband Network (Next Gen NBN). It aforethought a single entity that brings together the core fiber infrastructure and resources such as the central offices, ducts and manhole network, as well as the capabilities of fiber network design, build and management.
The project scope includes:
1. Migrating the existing Physical Network Inventory from G-Tech to Smallworld 5.1
2. Migrating the existing Logical Network Inventory from Smallworld 4.3 to Smallworld 5.1
3. Integrating the GIS Solution (Smallworld 5.1) with other systems .i.e. G-Tech, SAP, ODO, etc.
Responsibilities:
Ergon Energy is a Queensland Government-owned corporation, which supplies electricity to around 700,000 customers across a Queensland through a distribution network regulated by the AER (Australian Energy Regulator). Ergon were looking to migrate from Smallworld CST (Core Spatial Technology) 3.3 to EO (Electric Office) 4.3.4.
Responsibilities:
PG&E is a leading energy services company with 20,000 employees serving about 5.1 million consumers worldwide. Pacific Gas & Electric Co, the San Francisco was looking to capture, integrate and conflate gas distribution, electric transmission and distribution, substation, features and land base features from different legacy data sources to ESRI GIS platform.
Responsibilities:
The scope of project is GIS - SAP Integration will support objects with Installation and Asset model. SDME which is built on EO 4.2 supports this model whereas SDMG which is built on Smallworld CST 4.3 need to be model to have Installation and Asset (Functional location and Equipment model in SAP). Data model changes required in both GIS Systems. This creates a big impact on GIS systems.
Responsibilities:
EON is considered to be one of the largest power and gas companies in the world. E.ON had implemented G/Technology-based G!NIUS GIS system of Intergraph for managing their network assets. EON had captured only part of their network information using this system and was looking to capture the major part of their electric network data. The software used was G/Technology .
Responsibilities:
Responsible for Test Case Design, Test Execution, Logging defects and Preparing test reports
Achievements: