Accomplished Highway Engineer with over nine years of extensive professional experience, spanning diverse roles including Technician, Designer, Modeler, and Engineer. Excelling in Geometric Design, 3D Modeling, CAD Drafting and Drawing Production across Highway, Railway, Site Development, and Metro Tunnel Projects from US, UK, ME, ANZ & Nordics Countries. Proficiency extends to industry-leading CAD software with expertise in MicroStation 2D and 3D. Renowned for problem-solving skills and automation through Script, Macro, and VBA, significantly improving modelling and drawing production outcomes and efficiency.

Recognized as a Bentley Accredited Professional and Trainer for MicroStation, Open Roads Designer, and Open Rail Designer, as well as an Autodesk Certified Civil 3D Professional, with a strong academic background featuring a Master’s Degree in Transportation Engineering. Registered as an Engineering Technician with the UK Engineering Council.

A quick learner with ability to navigate complex challenges with flexibility, adaptability, and agility with a strong emphasis on inclusion, collaboration, and coordination.

Overview

9
9
years of professional experience
8
8
Certifications

Work History

Senior Engineer - Highways

Jacobs Solutions India Pvt Ltd
04.2022 - Current

In my current role, I specialize in the geometric design, corridor modeling, and drawing production for highways, intersections, interchanges, and railroads. My responsibilities include vehicle tracking and swept path analysis, site grading, and plan layout preparation for land development projects such as parking lots, wastewater treatment plants, pumping stations, drainage networks, and utility modeling. I conduct earthwork analysis and quantity calculations while actively engaging in interdisciplinary collaboration and coordination. I review the work of engineers and technicians, provide training and mentorship to fresh graduates and postgraduates, and troubleshoot CAD tool issues. I also create custom MicroStation and Open Roads Designer workspaces and standards, including seed files, annotation styles, feature definitions, and templates. Additionally, I develop Civil 3D assemblies, templates, and styles, create workflows, scripts, and programs for efficiency, and prepare tutorials, best practices, lessons learned, and process guidance documents.

CAD Technician - Highways

WSP Consultants India Pvt Ltd
08.2017 - 03.2019

In my role, I was mainly responsible for 3D modeling of rock tunnels using MicroStation and Civil 3D software while other responsibilities included preparing highway plans, profiles, cross sections, and detail drawings. I conduct vehicle tracking and swept path analysis, perform quantity calculations, and ensure my work adheres to company standards through thorough self-checks. I also maintain comprehensive documentation for all models and drawings, engage in knowledge sharing, and prepare training materials to support team development.

Assistant Engineer - T & D

KEC International Ltd
08.2015 - 08.2017

In this role, I was responsible for preparing general arrangement (GA) drawings of transmission towers, as well as shop drawings and foundation layout drawings using AutoCAD and Microstation drafting software. My duties also include quantity calculation, preparing bills of materials, and coordinating various aspects of the project to ensure smooth execution and alignment with project goals. I was also involved in project cost estimation by extracting the material and fabrication cost of the transmission tower and substation structures and foundation from the 3D model.

Education

Post Graduate Diploma - Environmental Science

Indira Gandhi National Open University
Delhi, India
04.2001 -

Master of Technology - Transportation Engineering

Mangalayatan University
Aligarh, India
04.2001 -

Bachelor of Technology - Civil Engineering

Lingaya's Vidyapeeth
Faridabad, India
04.2001 -

Diploma - Railroad And Railway Transportation

Institute of Permanent Way Engineers
New Delhi, India
04.2001 -

High School Diploma - Civil Engineering

Pusa Institute of Technology
New Delhi, India
04.2001 -

Skills

    Highway Engineering

    Geometric Design

    3D Modeling

    Site Grading

    CAD Drafting

    Drawing Production

    CAD Management

    BIM ISO 19650

    Automation

    Training & Mentoring

    Problem Solving

    Collaboration & Coordination

Major Projects

Project Name: I-10 Kino Interchange Improvements (Design Build)

Location: Arizona, USA

Client: Arizona DOT

Project Overview: The Arizona Department of Transportation is making improvements to Interstate 10 in Tucson. The I-10: Kino to Country Club project was programmed into the 2024-2028 Five-Year Transportation Facilities Construction Program as a Design/Build in FY 25. The project is currently in the development stage. The project will include:
Widening I-10

  • Reconstructing a new traffic interchange at I-10 and Kino Parkway
  • Constructing a new traffic interchange at I-10 and Country Club Road
  • Removing the traffic interchange at Palo Verde Road and I-10

Duration: Jul 2023 – Present

Software Used: Open Roads Designer, ProjectWise Explorer

Association: Jacobs as Deputy Engineer

Role: Designer/Modeler

Responsibilities:

  • Designing Alignment and profile of Ramps
  • Fine tuning ramp connection with mainline
  • Creating Plan layout as per ADOT standards
  • Modeling ramp, driveways and side roads
  • Creating custom template as per project need
  • Creating Seed files, annotation styles for drawing production.
  • Improving efficiency by developing Workflows and Automation
  • Collaboration and Coordination


Project Name: Penn State Access (Design Build)

Location: Newyork, USA

Client: Metropolitan Transport Authority

Project Overview: Penn Station Access (PSA) is a public works project underway by the Metropolitan Transportation Authority in New York City. The goal of the project is to allow Metro-North Railroad commuter trains to access Penn Station on Manhattan's West Side, using existing trackage owned by Amtrak. Metro-North trains currently terminate exclusively at Grand Central in Midtown Manhattan.

The project is scheduled to complement Grand Central Madison, which opened as part of East Side Access in 2023, and will commence in two separate phases. The first phase, which is under construction, will add four new stations along the Hell Gate Line (part of the Northeast Corridor) in the Bronx and route some New Haven Line trains to Penn Station. The second phase, which is unfunded, would add two more stations along the Empire Connection/West Side Line on Manhattan's West Side; this would be served by the Hudson Line. 

Duration: Jun 2022 – Present

Software Used: Open Roads Designer, Open Rail Designer,ProjectWise Explorer, Bluebeam Revu

Association: Jacobs as Deputy Engineer

Role: Designer/Modeler

Responsibilities:

  • Designing Alignment and profile of Ramps
  • Fine tuning ramp connection with mainline
  • Creating Plan layout as per ADOT standards
  • Modeling ramp, driveways and side roads
  • Creating custom template as per project need
  • Creating Seed files, annotation styles for drawing production.
  • Improving efficiency by developing Workflows and Automation
  • Collaboration and Coordination


Project Name: Capital Line South Extension - Light Rail Transit (Pre-Bid)

Location: Ontario, Canada

Client: City of Edmonton

Project Overview: The Capital Line South Extension is a high-floor LRT system that helps serve communities in south and southwest Edmonton, two of the fastest growing areas in our city. The south extension will be completed in two phases. Phase 1 will extend the line from Century Park to just north of Ellerslie Road, and Phase 2 will extend from Ellerslie Road to Allard/Desrochers. Capital Line South Phase 1 (Century Park to just north of Ellerslie Road) is a 4.5 km long, high floor LRT and includes:

  • An underpass at 23 Avenue
  • Bridges crossing Blackmud Creek and Anthony Henday Drive
  • A new operations and maintenance facility south of Anthony Henday Drive
  • A neighbourhood LRT station at Twin Brooks (which will be smaller in size compared to a multi-modal transit station like Century Park)
  • A multi-modal LRT station connecting to the Heritage Valley Park & Ride just north of Ellerslie Road

Duration: Jul 2023 – Jan 2024

Software Used: Civil 3D, AutoCAD, Autodesk Construction Cloud, Bluebeam Revu

Association: Jacobs as Deputy Engineer

Role: Lead Modeler/Reviewer

Responsibilities:

  • Modification of Rail Alignment and Profile
  • Leading the modeling of 4.5 km long Light Rail Corridor and OMF Yard.
  • Delegating task to other team members and reviewing their work.
  • Giving Civil 3D training and mentoring
  • Coordinating with Drainage and Structure Discipline
  • Model revision to remove clashes
  • Analysis of earthwork and retaining wall requirement
  • Creating Custom subassembly as per project need.
  • Creating Custom Sheet Templates/Label Styles


Project Name: McCroskey Island WWTP

Location: Sevierville, USA  

Client: Somerville Water Department

Project Overview: The Project consists of construction of improvements to the McCroskey Island Wastewater Treatment Plant (WWTP) to replace aging equipment and to provide treatment flexibility. The Work includes, but is not limited to, replacing a grit classifier and grease auger at the Headworks, installing a new Vacuum Truck Dewatering Station, replacing two Circular Sludge Thickeners, and sludge pumps, installing new pumps, VFDs, and piping at the Davis Lane Pump Station, providing architectural and HVAC improvements to the existing Laboratory Building.

Duration: Jan 2022 – Jul 2022

Software Used: InRoads SS10, MicroStation, AutoCAD, Vehicle Tracking

Association: Jacobs as Senior Designer

Role: Modeler

Responsibilities: 

  • Site Layout Development
  • Site Grading for Wastewater Treatment Plant Expansion
  • Driveways and Access Road modelling.
  • Swept Path Analysis for Driveways and Access Roads
  • Earthwork analysis and Quantity Calculation
  • Drawing Production


Project Name: FUD WWTP Improvements

Location: Sevierville, USA

Client: First Utility District

Duration: Jan 2022 – Jul 2022

Software Used: InRoads SS10, MicroStation, AutoCAD, Vehicle Tracking

Association: Jacobs as Senior Designer

Role: Modeler

Responsibilities:

  • Site Layout Development
  • Site Grading for Wastewater Treatment Plant Expansion
  • Driveways and Access Road modelling.
  • Swept Path Analysis for Driveways and Access Roads
  • Earthwork analysis and Quantity Calculation
  • Drawing Production


Project Name: NICTD-West Lake Corridor (Design Build),

Location: Indiana, US

Client: The Northern Indiana Commuter Transportation District (NICTD)

Project Overview: The Northern Indiana Commuter Transportation District (NICTD) West Lake Corridor Project is a significant transit development aimed at expanding commuter rail service in the northwestern Indiana region. The project will extend the existing South Shore Line (SSL) from Hammond, Indiana, to Dyer, Indiana, improving connectivity between Chicago and the southern suburbs. The West Lake Corridor will extend approximately 8 miles south from the current South Shore Line near Hammond, connecting it to Munster and Dyer, Indiana. The project includes the construction of four new stations: Hammond Gateway, South Hammond, Munster Ridge Road, and Munster/Dyer Main Street

Duration: Jan 2021 – Feb 2022

Software Used: InRoads SS10, MicroStation, ProjectWise Explorer, Bluebeam Revu

Association: Jacobs as Senior Designer

Role: Lead CAD (Track)

Responsibilities:

  • Preparing Plan, Profile & Cross Section Drawing
  • Preparing Construction Phasing Plan
  • Preparing Signage Plan
  • Developing Typical Sections
  • Developing Standard Detail Drawing


Project Name: US 270 Widening Project (PS&E)

Location: Dewey County, Oklahoma, USA

Client: Oklahoma DOT

Project Overview: The US-270 Widening Project in Oklahoma is a significant infrastructure improvement initiative aimed at enhancing safety and traffic flow in the region. The project primarily involves widening US-270 from a two-lane to a four-lane highway, which is crucial for supporting increased traffic volumes and improving connectivity. The corridor was split into several construction projects. 

  • The first project begins north of the town of Seiling at the US-270/US-183 junction and proceeds southerly approximately 3.5 miles through the town of Seiling. This was a turn key project to widen US-270 from 2 lanes to 4 lanes with several constraints and challenges in Seiling. The bridge over Seiling Creek was widened symmetrically to accommodate 4 lanes of traffic.
  • The second project was an additional 1.5 miles of 4 lane undivided construction to the south of Seiling. This project also included a symmetric widening of the bridge over Cheyenne Creek.
  • The last 4 miles consisted of a 4 lane divided facility with improvements to the existing lanes to accomplish needed safety improvements.

Duration: May 2020 – Jun 2022

Software Used: InRoads SS2, MicroStation, ProjectWise Explorer, Bluebeam Revu

Association: Jacobs as Senior Designer

Role: Designer/Modeler

Responsibilities:

  • Alignment and profile design of Proposed widening lanes
  • Alignment and profile redesign for side roads at mainline connections
  • Profile curve correction for existing lanes
  • Modeling milling/overlay and widening for existing lanes
  • Modeling median and full depth construction for new lanes
  • Creating custom templates per project need.
  • Developing Plan, Profile and Cross Section drawings
  • Developing Construction Phasing Plans
  • Developing Erosion Control Plans
  • Developing Signing & Striping Details Plans
  • Earthwork Estimation (Phase Wise)
  • Generating Earthwork, Overlay and Milling Report
  • Developing Mass Haul Diagram


Project Name: US 259 Road Rehabilitation & Reconstruction (PS&E)

Location: McCurtain County, Oklahoma, USA

Client: Oklahoma DOT

Project Overview: The U.S. Highway 259 rehabilitation project in McCurtain County, Oklahoma, near the Texas state line, is part of a significant infrastructure improvement effort by the Oklahoma Department of Transportation (ODOT). The project is designed to enhance safety and traffic flow on this crucial stretch of road.
The project involves widening the existing roadway to include paved shoulders, improving curves that currently do not meet design criteria, and enhancing sight distance at county road intersections. The construction will be phased to maintain traffic flow in both directions during the work. The project covers two main segments:

  • The first segment begins approximately two miles north of the Texas state line and extends six miles northward.
  • The second segment starts about eight miles north of the state line and extends another seven miles north.

Duration: May 2020 – Mar 2022

Software Used: InRoads SS2, MicroStation, ProjectWise Explorer, Bluebeam Revu

Association: Jacobs as Senior Designer

Role: Designer/Modeler

Responsibilities:

  • Profile curve correction for existing lanes
  • Modeling milling/overlay and widening for existing lanes
  • Creating custom templates per project need.
  • Developing Plan, Profile and Cross Section drawings
  • Developing Construction Phasing Plans
  • Developing Erosion Control Plans
  • Developing Signing & Striping Details Plans
  • Earthwork Estimation (Phase Wise)
  • Generating Earthwork, Overlay and Milling Report
  • Developing Mass Haul Diagram


Project Name: I 16@I 95 Interchange Improvement (Design Build)

Location: Georgia, USA

Client: Georgia Department of Transportation

Project Overview: The I16@I95 Improvement Projects are a series of transportation infrastructure projects focused on the interchange of Interstate 16 (I-16) and Interstate 95 (I-95) in the Savannah, Georgia area. The goal of these projects is to enhance the safety, capacity, and operational efficiency of this critical interchange, which is a significant transportation hub in the southeastern United States. The project include: 

  • Replace the existing loop ramps on the west side of the interchange with flyover ramps
  • Add collector-distributor (CD) lanes on I-95 northbound to help eliminate weaving to and from I-16
  • Widen I-16 from four lanes to six lanes in each direction
  • Add lighting at the I-16/I-95 interchange
  • Install Intelligent Transportation System (ITS) technology to link to Georgia NaviGAtor
  • Build a two-lane emergency-use ramp across the median between I-95 and Dean Forest Road to aide hurricane evacuations

Duration: Apr 2019 – Jan 2022

Software Used: Open Roads Designer, Geopak, MicroStation, ProjectWise Explorer

Association: Jacobs as Designer

Role:  Technician/Designer

Responsibilities:

  • Preparing Right of Way Plans
  • Preparing Utilities Plans
  • Preparing Construction Phasing Plans
  • Preparing Signing and Striping Plans
  • Noise Wall Modelling
  • Generating ROW Reports
  • Creating MicroStation Pen Table, and Print Set
  • Improving Drawing Production Workflow by Creating MicroStation Scripts


Project Name: I 75/US 301 Interchange Improvement (Pre-Bid)

Location: Florida, USA

Client: Florida DOT

Project Overview: This Design Build project encompasses widening over 4.3 miles along I-75 from 6 to 8 lanes, providing auxiliary lanes and inside full depth shoulders between SR 64 and US 301 and converting the existing I-75 interchange at US 301 from a Partial Clover Leaf to an “Enhanced (Tight) Diamond” consistent with the approved Interchange Access Request and PD&E. The project includes 

  • Reconstructing all ramps and building 2 new parallel bridges over the Manatee River for the new NB I-75 exit ramp and new SB entrance ramp. These new ramp bridges are to include full-width stub-outs to accommodate 3 general-use lanes of the future ultimate I-75 10-lane section.
  • Reconstructing US 301 and and widening from east of 51st Avenue to west of 60th Avenue in order to provide 3 EB travel lanes and 4 WB travel lanes, turn lanes to all new access ramps and side streets, as well as, sidewalks on both sides of the roadway.

Duration: Mar 2020 – Jul 2020

Software Used: Geopak, MicroStation, ProjectWise Explorer

Association: Jacobs as Designer

Role:  Designer

Responsibilities:

  • Profile Design for DDI Ramps
  • Developing Plan Layouts as per FDOT
  • Preparing Plan and Profile Drawings
  • Preparing Construction Phasing Plans
  • Preparing Signing and Striping Plans
  • Preparing Intersection Detail Drawings


Project Name: Cotton Belt Regional Rail - Silver Line (Design Build)
Location: Dallas, Texas, USA  
Client: Dallas Area Rapid Transit (DART)
Project Overview: Cotton Belt Regional Rail Corridor, renamed the Silver Line in June 2019, is an under-construction 26-mile hybrid commuter rail corridor of the Dallas Area Rapid Transit (DART) system. The corridor extends between Dallas/Fort Worth (DFW) International Airport to Shiloh Road Station in Plano, traversing seven cities and three counties. Jacobs serves as the principal design consultant for this design-build project and provides design and oversight services for track alignments, bridges, pedestrian trails, drainage, retaining walls, stations and signalling.
Duration: Apr 2019 – Jan 2022
Software Used: MicroStation, Open Roads Designer, ProjectWise Explorer
Association: Jacobs as Designer
Role:  Designer/Technician
Responsibilities: 

  • Communication Duct Modeling and Plan Preparation
  • Preparation of Drainage Plan, Profile and Section Drawing
  • Preparation of Drainage Detail Drawing
  • Preparation of Drainage Standard Drawing
  • Preparation of Parking lot Site Plan and Grading Plans
  • Creating Custom Open Roads Annotation Styles
  • Creating MicroStation Script to enhance Drawing Production workflow


Project Name: Stockholm Metro TUB A (Detail Design)

Location: Stockholm, Sweden

Client: Trafikverket

Project Overview: Stockholm's new metro project is a significant expansion of the city's existing metro (tunnelbana) system, aimed at improving public transportation capacity, connectivity, and accessibility in the growing Swedish capital. This project, managed by the Stockholm County Council (SLL), represents one of the largest infrastructure investments in Sweden in recent decades. The project include:

Extension of Blue Line from Akalla to Barkarby. Two new stations: Barkarbystaden and Barkarby. A new platform for the Blue Line will also be built under the existing Gullmarsplan station.

Extension of Green Line from Odenplan to Arenastaden include three new stations Arenastaden, Hagalund and Hagastaden.

Expansion of the depot in Högdalen to service, clean and repair more trains from both the Green Line and the Blue Line.

Construction of a new line line between Fridhemsplan and Älvsjö with six stations.

Duration: Dec 2017 – Mar 2019

Software Used: MicroStation, Civil 3D, Navisworks

Association: WSP as Technician

Role: Technician/BIM Modeler

Responsibilities:

  • 3D Modelling of three Station Tunnels (Arenastaden, Hagalund and Hagastaden)
  • 3D Modeling of Depot Tunnel (Högdalen)
  • Preparing Various Engineering models for analysis
  • Quantity Calculation and Drawing Production


Accomplishments

2024 - Received Impact Award for Improving Workflow and Efficiency on I-10 Kino Design Build Project by Lead Office.


2023 - Received Global Beyond Excellence Team Award at Jacobs for Everyday Automation.


2023 - Received Impact Award at Jacobs for Exceeding Client Expectation.


2022 - Received Team Award at Jacobs for completing the McCroskey Island WWTP Project before time.


2021 - Received TAP Award at Jacobs for Technical Delivery Excellence.


2018 - Received SPOT award at WSP India for Excellent Work on Stockholm Metro Tunnel Project.

Affiliations

EngTech MICE - Institution of Civil Engineer, UK

MIRC - Indian Road Congress, India

Software

MicroStation

AutoCAD

Open Roads Designer

Open Rail Designer

Civil 3D

InRoads

Geopak

MX Road

ProjectWise Explorer

ProjectWise Web

Autodesk Construction Cloud

Certification

Bentley Accredited ProjectWise Fundamentals Administrator

Timeline

Bentley Accredited ProjectWise Fundamentals Administrator

07-2024

Bentley Accredited Developer: iTwin Platform - Associate

09-2022

Bentley Qualified Trainer -Open Rail Designer

08-2022

Senior Engineer - Highways

Jacobs Solutions India Pvt Ltd
04.2022 - Current

Bentley Qualified Trainer - MicroStation

03-2022

Bentley Qualified Trainer - OpenRoads Designer

03-2022

Autodesk Certified Professional in Civil 3D for Infrastructure Design

10-2021

Bentley Accredited MicroStation Professional

05-2021

Bentley Accredited Road Designer - Open Roads Designer

05-2021

CAD Technician - Highways

WSP Consultants India Pvt Ltd
08.2017 - 03.2019

Assistant Engineer - T & D

KEC International Ltd
08.2015 - 08.2017

Post Graduate Diploma - Environmental Science

Indira Gandhi National Open University
04.2001 -

Master of Technology - Transportation Engineering

Mangalayatan University
04.2001 -

Bachelor of Technology - Civil Engineering

Lingaya's Vidyapeeth
04.2001 -

Diploma - Railroad And Railway Transportation

Institute of Permanent Way Engineers
04.2001 -

High School Diploma - Civil Engineering

Pusa Institute of Technology
04.2001 -