SARAN SASIDHARAN NAIR

SARAN SASIDHARAN NAIR

Electrical Engineer
Trivandrum

Summary

  • 7 years of diversified experience in electrical engineering field with sufficient experience of plant shutdown, Project Management with Engineering implementation, Electrical Design, Electrical Load Estimation, Equipment sizing and Specification, Engineering Layout preparation, Material Procurement, Electrical Commissioning works & final handover.
  • Responsibilities include Managing, planning, engineering, preparation of project construction / commissioning activities & field execution.
  • Initiate and finalize material procurement deliverables, Commissioning deliverables based on project requirements.
  • Active Role in supporting commissioning team to define System boundaries/limits & assigning of task sheets commissioning dossiers.
  • Excellent communication, people management, analytical and interpersonal skills.
  • Problem-solving and Evaluation skills.
  • Planning, Coordination, Engineering, Quality control, Documentation, Contracts & Budgeting of projects.
  • A highly organized individual with 7 Years' Experience in Projects, Testing & Commissioning hands-on experience in providing technical expertise in the successful delivery of On-Shore brownfield/greenfield EPC Projects Oil and Gas Industry that reflects my experience, skills and personal attributes including dedication, meeting goals and ability to follow through on business commitments and growth of my career.
  • Electrical Engineer familiar with all major engineering standards associated with control gear components and electrical power stations. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy.

Overview

10
10
years of professional experience
7
7
years of post-secondary education

Work History

Electrical Engineer

Blackcat WLL
10.2022 - Current

• Preparation & mobilization of resources as per client.

• Mobilizing team for site visits to finalize scope of work in reference to our contractual scope.

  • Finalization of Tools, Equipment’s & Resources required for job execution.
  • Preparation of single line diagram for mechanical teams for site activities.
  • Preparation of Job Hazard Analysis, Permits for work and reviewing the permits.
  • Conducted Site Surveys and inspections to assess existing electrical systems and identified some modifications in the cable routing.
  • Preparation of Timesheets & relevant final completion certificates required for invoicing & final close out.
  • Ensuring the ordered material is as per QSGTL specifications.
  • Coordination with client for drawing approvals.
  • Procurement of project bulk material in accordance with the project specifications.
  • Developed and maintained a comprehensive cable management database to streamline project tracking and updates.
  • Analyze and prepare execution plan in accordance with the overall project execution schedule.
  • Conducted site inspections to verify proper cable routing and installation and to verify compliance with cable routing designs, promptly addressing issues to maintain project timelines.
  • Managed Coordination between electrical, mechanical, and civil teams to integrate cable systems seamlessly into the overall design.
  • Implement quality control measures to ensure the integrity and functionality of cable installations.
  • Oversee field installation of cable routing systems, ensuring adherence to design specifications.
  • Developed routing practices that enhanced safety standards, leading to zero incidents during a project phase.
  • Reviewed and updated electrical drawings and specifications to align with project requirements and industry standards.
  • Supported field Installation Teams by providing technical guidance and resolving on-site issues related to cable routing.
  • Analyzing & implementation of electrical design solutions followed by Preparation of project-related documentation - BOQ, Material Submittal, Method statements, Testing & Commissioning, and Operation & Maintenance procedures, and Project Handovers.
  • Responsible for a wide variety of electrical design evaluation, installation, commissioning, and coordination with the site execution teams for the day-to-day planning of site activities as well as for resolution of issues at site.
  • Coordination with all stakeholders (Execution team, Sub-contractors & Clients)
  • Training and guiding Site supervisor/Foreman / Technician and ensuring skill development by making them understand the overview of the workflow through practical exposure.
  • Analysis and preparation of documents for Procurement.
  • Provided on-site engineering and technical services during installation and fielding processes
  • Successfully managed multiple projects simultaneously by setting clear goals, prioritizing tasks, and monitoring progress
  • Developed comprehensive documentation for designs, including schematics, calculations, specifications, and reports for review by clients or regulatory agencies
  • Coordinated with vendors to identify and procure appropriate equipment necessary for project completion

Electrical Engineer

Qatar Energy(Qcon WLL)
11.2020 - 10.2022
  • Scheduling and coordinating work to deadlines.
  • Ensuring that equipment’s works to its specification.
  • Creating and carrying out test procedures.
  • Supported Field Teams during installation and commissioning, providing technical guidance and troubleshooting assistance of LV Switch board, Transfomer, AC UPS ,Battery Banks, Distribution Boards.
  • Monitored the Cable glanding, Cable tray installation ,Inspection and Testing of power and control cables for the Switch Gears, AC UPS, Distribution Boards.
  • Monitored the Earthing of LER , Process Area Earthing and Earth Grid connection and Testing of Earth pits and Inspection carried out.
  • Co-ordination with electrical testing for carrying out pre-commissioning activities.
  • Co-ordination with Electrical Testing team for carrying out Electrical functional tests for various equipment’s ( Transformers, LV switch boards, , LV Motors, AC/DC UPS & Lighting Distribution system).
  • Preparation & approval of essential project execution documents.
  • Involving in Technical Discussions to ensure proper flow of project execution plan.
  • Co-ordination with Execution team, QP Project team & Equipment vendor (ABB,SNEIDER ELECTRIC) for installation & commissioning
  • Maintained effective working relationship with contractors, client, vendor’s, and colleagues.
  • Responsible for the design of Electrical DB for temporary electrical equipment’s used for construction jobs
  • Provided technical support to colleagues on complex issues, assisting them in finding efficient solutions to problems.
  • Supervised construction and pre-commissioning of electrical rooms and substations.
  • Inspected completed installations to observe operations and verify conformance to design and equipment specifications.
  • Provided on-site engineering and technical services during installation and fielding processes.
  • Successfully managed multiple projects simultaneously by setting clear goals, prioritizing tasks, and monitoring progress.
  • Reduced electrical construction hazards with upgraded safety policies and stringent enforcement.
  • Established positive relationships with key stakeholders, including clients, contractors, and regulatory agencies, to facilitate project success.
  • Evaluated power needs for various systems.
  • Coordinated with contractors during construction phases to ensure proper execution of designs according to established specifications and plans.
  • Read and analyzed blueprints and project documentation to develop workflows and strategy.
  • Used established formulae to calculate current loads and short circuit currents.
  • Collaborated with multidisciplinary teams to develop innovative solutions for complex engineering challenges.
  • Inspected and performed validation testing for designed systems and third-party installations.
  • Consistently met project deadlines by efficiently managing time and resources, ensuring timely completion of tasks.
  • Ensured compliance with industry regulations, codes, and standards throughout all stages of product development.
  • Established and maintained effective communication with clients and contractors.
  • Analyzed and documented test results to comply with industry standards.
  • Coordinated with vendors to identify and procure appropriate equipment necessary for project completion.

Electrical Supervisor

QPH(Worley Parson)
8 2018 - 7 2020
  • Preparation of the electrical single line diagram, schematics and detailed drawing as required.
  • Supported field Teams duringby providing technical guidance and resolving on-site issues related to Project construction activities.
  • Supported field Teams during Installation, Testing and commissioning of Cables, Lighting fixtures ,MOV Lighting poles .
  • Supervise and preparation of documents for Testing procedure.
  • Reviewed and updated electrical drawings and specifications to align with project requirements and industry standards.
  • Supported field Teams during by providing technical guidance and resolving on-site issues related to Project construction activities.
  • Oversee field installation of cable routing systems, ensuring adherence to design specifications.
  • Preparation of Load list of the tools which are going to be used by Mechanical team to finalize the Load requirements.
  • Generation of SLD and co-ordination with QSGTL for approval.
  • Ensuring the ordered material is as per QSGTL specifications
  • Site surveys and Participated on Mechanical completion walk downs and Chazid walk downs
  • Optimized material usage by estimating accurate quantities required for each task, reducing waste during construction processes
  • Conducted thorough site inspections to identify potential issues early in the process, allowing for timely corrective actions to be taken
  • Reduced downtime by regularly scheduling maintenance for tools and equipment used in electrical installations
  • Consistently met project deadlines through efficient resource management and proactive issue resolution
  • Boosted client satisfaction by maintaining open lines of communication for regular progress updates and addressing concerns promptly
  • Enhanced project efficiency by implementing electrical safety protocols and site management procedures
  • Facilitated successful completion of complex projects with interdisciplinary coordination among various teams involved in the construction process
  • Resolved conflicts among team members through open communication channels, promoting a harmonious working environment conducive to productivity
  • Continuously updated technical knowledge through professional development resources, ensuring the ability to implement cutting-edge solutions for clients
  • Delivered high-quality electrical installations by consistently adhering to best practices and industry standards throughout each project phase
  • Minimized project costs through careful budget planning, tracking expenses, and negotiating contracts with vendors
  • Provided on-site engineering and technical services during installation and fielding processes
  • Reduced electrical construction hazards with upgraded safety policies and stringent enforcement

Commissioning Supervisor

Emirates Technical Associates, ETA
06.2016 - 07.2018

• Safety compliance in accordance with OSHA.

• Construction of LER, Earthing and Earth Pits for the LER.

• Erection of LV BOARD, UPS SYSTEM , INDOOR AND OUTDOOR Lighting DB.

• Assist with the electrical construction and installation.

• Reporting on Electrical and Instrument related project activities to Construction Manager and the Client

• Testing of Transformer, operation, cable schedule verification and scheme check.

• Testing for CT, VT, Circuit Breaker, Busbar of 415V.

• Performed IR for CT, VT, Bus Bar.

• Calibration of Ammeters, Voltmeters, MW and MVAR meters by using Secondary injection CMC256 KIT.

• Testing and Commissioning of LVAC Switch gear , MCC Cubicle Type 0.48 V / 4000A(ABB).

• Supervised the Scheme check and the Function test .

• Testing of Auxiliary Transformer(1.6MVA) and Power Transformer(40/50MVA)

• IR , Winding Resistance, Turns Ratio, Vector Group, Magnetic balance test, Short circuit test, Tan Delta test of Power Transformer.

• HV test on power cables and Switch Gears.

• BDV test on transformer oil.

• CT Modification and Testing for IR, Winding Resistance , Knee point, Ratio Test.

• IPCS signal checking from the Switch gear panel.

• DC Scheme Checking and Bus wiring checks.

• Supervised AC UPS & Battery charger 230V /20kVA erection and installation jobs.

• CT ,VT ,Bus bar Contact Resistance Measurement and HV test for Busbar and Bus duct.

• Preparation for testing and inspection report

Assistant Engineer

Kerala State Electricity Board Ltd.
06.2015 - 05.2016
  • Testing of equipments like CT, PT and Circuit Breaker.
  • Involved in LT connection works and Trouble shooting and carrying out periodical inspection of Substation.
  • Monitoring of day-to-day Operational and Maintenance activity in site.
  • Analyze the issue, planning to schedule works according to Maintenance job
  • Preparing test report for all testing carried out in site.
  • Analyzing and rectifying faults in equipment, control and power circuit of the Substation.
  • Supported senior engineers with detailed design drawings, calculations, and analysis for various engineering projects
  • Assisted in the development of technical specifications for engineering projects, ensuring accuracy and adherence to established guidelines
  • Created detailed reports on engineering activities and findings
  • Documented and developed engineering procedures and processes

Electrical Sub Engineer

Kerala State Electricity Board Ltd.
07.2014 - 06.2015
  • Distribution Transformer, Power Transformer Testing.
  • Schematic Drawing checks of Transformer Marshaling Box, OLTC, DETC Panels.
  • Maintenance of Power transformer up to 16MVA.
  • Testing & Maintenance of 110kV/11kV,11kV/433V substations.
  • DC 110 UPS Maintenance activities .
  • Associated with trouble shooting, testing of CT ,VT ,Switch Gears.
  • Transformer Maintenance & Operations.
  • Continuity test and IR test for Control Cables and Power Cables
  • Managed subcontractor relationships, ensuring high-quality workmanship while adhering to established deadlines and budgets
  • Conducted thorough site assessments to identify potential issues and develop appropriate solutions before commencing work
  • Developed cost estimates and project specifications for proposals
  • Read and interpreted blueprints, technical drawings, schematics, and computer-generated reports
  • Developed work plans for various personnel roles based on strengths and talents
  • Performed preventative maintenance to keep tools and equipment functional
  • Reviewed technical drawings developed by CAD technicians and drafters
  • Reviewed existing electrical engineering criteria to identify necessary revisions, deletions or amendments to outdated material
  • Estimated numerical length of runs during new service installations
  • Improved safety standards by implementing updated protocols and conducting regular training sessions
  • Optimized resource allocation for various projects, ensuring timely completion within budget constraints
  • Troubleshot complex technical problems, applying innovative approaches to resolve issues quickly and effectively
  • Managed performance evaluation and scheduling of electrical team members
  • Supervised crew of electricians and maintained safe, efficient and structured work environment
  • Evaluated job scope and determined necessary supplies, timelines, and projected expenses
  • Developed training methods for new electricians to align with company policies
  • Completed quality assurance and compliance reviews for every job
  • Provided on-site supervision for all phases of electrical work, ensuring proper execution according to design specifications
  • Supervised and evaluated installation and repair of lights and power in buildings and facilities

Education

Bachelor of Technology - Electrical And Electronics Engineering

Amrita School of Engineering
Kollam
01.2010 - 08.2014

High School Diploma -

SNVHSS
VARKALA
05.2008 - 06.2010

Skills

    Electrical experience

    Power systems

    Electrical safety standards

    Team Leadership

    Electrical design

    Electrical Engineering Standards

    Wiring schematics

    Project Management

    Microsoft PowerPoint

    Schematics Interpretation

    Staff Management

    Technical Support

    System-level electrical design and integration

    Power Systems Analysis

    Electrical grounding inspection

    Problem-solving abilities

    Effective Communication

    Decision-Making

    Electrical System Design

    Installation Inspections

    AutoDesk AutoCAD Software

    Cable sizing Calculations

    Electrical Equipment Sizing Calculations

    Hazardous Area Classification

    Knowledge of relevant IEC standards

    Protection & metering schematics

    Electrical design basis

Professionaldetails

  • BTech in Electrical & Electronics Engineering, Amrita School of Engineering, 2014.
  • Government Higher Secondary school, 2010


QATAR SHELL GTL(11/2022 -  03/2024) QPH(WORLEY PARSON), REROUTING OF MOTOR POWER CONTROL CABLES-FGP -2


  • Preparation & mobilization of resources as per client.
  • Mobilizing team for site visits to finalize scope of work in reference to our contractual scope.
  • Finalization of Tools, Equipment's & Resources required for job execution.
  • Preparation of single line diagram for mechanical teams for site activities.
  • Preparation of Job Hazard Analysis, Permits for work and reviewing the permits.
  • Conducted site surveys and inspections to assess existing electrical systems and identified some modifications in the cable routing.
  • Preparation of Timesheets & relevant final completion certificates required for invoicing & final close out.
  • Ensuring the ordered material is as per QSGTL specifications.
  • Coordination with client for drawing approvals.
  • Procurement of project bulk material in accordance with the project specifications.
  • Developed and maintained a comprehensive cable management database to streamline project tracking and updates.
  • Analyze and prepare execution plan in accordance with the overall project execution schedule.
  • Conducted site inspections to verify proper cable routing and installation and to verify compliance with cable routing designs, promptly addressing issues to maintain project timelines.
  • Managed coordination between electrical, mechanical, and civil teams to integrate cable systems seamlessly into the overall design.
  • Implement quality control measures to ensure the integrity and functionality of cable installations.
  • Oversee field installation of cable routing systems, ensuring adherence to design specifications.
  • Developed routing practices that enhanced safety standards, leading to zero incidents during a project phase.
  • Reviewed and updated electrical drawings and specifications to align with project requirements and industry standards.
  • Supported field installation teams by providing technical guidance and resolving on-site issues related to cable routing.
  • Familiar with IEC, IEEE and other relevant standards for cable routing and installation.
  • Day-to-day reporting of progress to the planning department to have a clear status of the job progress.
  • Maintained effective working relationship with contractors, client, vendors, and colleagues


MESSAID (11/2020 - 10/2022) QATAR ENERGY, INTREGRATED GAS SUPPLY TO MESSAID CONSUMERS(IGSMC)

  • Scheduling and coordinating work to deadlines.
  • Ensuring that equipment's works to its specification.
  • Creating and carrying out test procedures.
  • Supported field teams during installation and commissioning, providing technical guidance and troubleshooting assistance of LV Switch board, Transformer, AC UPS, Battery Banks, Distribution Boards.
  • Monitored the Cable glanding, Cable tray installation, Inspection and Testing of power and control cables for the Switch Gears, AC UPS, Distribution Boards.
  • Monitored the Earthing of LER, Process Area Earthing and Earth Grid connection and Testing of Earth pits and Inspection carried out.
  • Co-ordination with electrical testing for carrying out pre-commissioning activities.
  • Co-ordination with Electrical Testing team for carrying out Electrical functional tests for various equipment's (Transformers, LV switch boards, LV Motors, AC/DC UPS & Lighting Distribution system).
  • Preparation & approval of essential project execution documents.
  • Involving in Technical Discussions to ensure proper flow of project execution plan.
  • Co-ordination with Execution team, QP Project team & Equipment vendor (ABB, SNEIDER ELECTRIC) for installation & commissioning
  • Maintained effective working relationship with contractors, client, vendors, and colleagues.
  • Responsible for the design of Electrical DB for temporary electrical equipment's used for construction jobs, QATAR SHELL GTL, 08/2018, 07/2020, QPH(WORLEY PARSON), NCC FILTRATION PROJECT, SPENT CAUSTIC IMPROVEMENT, SPENT CAUSTIC WINTERIZATION
  • Preparation of the electrical single line diagram, schematics and detailed drawing as required.
  • Preparation of PTW, JHA/JSA and Risk Assessment as per Safety Protocols.
  • Supported field teams during Installation, Testing and commissioning of Cables, Lighting fixtures, MOV, Lighting poles etc...
  • Supervise and preparation of documents for Testing procedure.
  • Supported field installation teams by providing technical guidance and resolving on-site issues related to Project construction activities.


GASCO-ASAB 0( 06/2016 -  07/2018) GASCO SITE, ASAB 0, 33KV/11KV/0.433KV SUBSTATION


  • Safety compliance in accordance with OSHA.
  • Construction of LER, Earthing and Earth Pits for the LER.
  • Erection of LV BOARD, UPS SYSTEM, INDOOR AND OUTDOOR Lighting DB.
  • Assist with the electrical construction and installation.
  • Reporting on Electrical and Instrument related project activities to Construction Manager and the Client
  • Testing of Transformer, operation, cable schedule verification and scheme check.
  • Testing for CT, VT, Circuit Breaker, Busbar of 415V.
  • Performed IR for CT, VT, Bus Bar.
  • Calibration of Ammeters, Voltmeters, MW and MVAR meters by using Secondary injection CMC256 KIT.
  • Testing and Commissioning of LVAC Switch gear, MCC Cubicle Type 0.48 V / 4000A(ABB).
  • Supervised the Scheme check and the Function test.
  • Testing of Auxiliary Transformer(1.6MVA) and Power Transformer(40/50MVA)
  • IR, Winding Resistance, Turns Ratio, Vector Group, Magnetic balance test, Short circuit test, Tan Delta test of Power Transformer.
  • HV test on power cables and Switch Gears.
  • BDV test on transformer oil.
  • CT Modification and Testing for IR, Winding Resistance, Knee point, Ratio Test.
  • IPCS signal checking from the Switch gear panel.
  • DC Scheme Checking and Bus wiring checks.
  • Supervised AC UPS & Battery charger 230V / 20kVA erection and installation jobs.
  • CT, VT, Bus bar Contact Resistance Measurement and HV test for Busbar and Bus duct.
  • Preparation for testing and inspection report, 110kV/11kV Substation, Kerala State Electricity Board, Kerala State Electricity Board Ltd., Assistant Engineer
  • Testing of equipments like CT, PT and Circuit Breaker.
  • Scheme checking and commissioning of LT and HT Panels.
  • Scheme checking and commissioning of Control and relay panels.
  • Functional and operational checks.
  • Monitoring of day-to-day Operational and Maintenance activity in site.
  • Preparing test report for all testing carried out in site.
  • Analyzing and rectifying faults in equipment, control and power circuit of the Substation., Kerala State Electricity Board Ltd., Electrical Sub Engineer
  • Distribution Transformer, Power Transformer Testing.
  • Schematic Drawing checks of Transformer Marshaling Box, OLTC, DETC Panels.
  • Maintenance of Power transformer up to 16MVA.
  • Testing & Maintenance of 110kV/11kV, 11kV/433V substations.
  • DC 110 UPS Maintenance activities.
  • Associated with trouble shooting, testing of CT, VT, Switch Gears.
  • Transformer Maintenance & Operations.
  • Continuity test and IR test for Control Cables and Power Cables.
  • Experienced user of Computer Operating system such as Windows XP/Vista/7/8.1
  • Can analyze electrical drawings with real-time machines to analyze the error and rectify
  • Ability to interact with all levels of people by effective communications.
  • Auto Cad, Naviswork, Matlab.

( 07/2014 - 06/2015) Electrical Sub Engineer, Kerala State Electricity Board Ltd.

(06/2015 - 05/2016) Assistant Engineer, Kerala State Electricity Board Ltd.

( 06/2016 -  07/2018) Commissioning Supervisor, AIES LLC.

(08/2018 - 08/2022) ELECTRICAL ENGINEER-JR, QCON WLL.

(10/2022 - 02/2024) ELECTRICAL ENGINEER, BLACKCAT WLL.

Disclaimer

I hereby declare that the above information's are true and correct in best of my knowledge.

Accomplishments

  • Mentored and directed team members on a large scale electrical installation project for a theater and performance facility.
  • Achieved project completion with accuracy and efficiency.
  • Permit Requester and Permit Holder authorization in QATAR SHELL GTL(QSGTL).
  • Permit to work authorization in QATAR ENERGY.(CPW&EPTW)

Software

AUTOCAD 2D

MSOFFICE SUIT

NAVISWORK

DIALUX EVO

EXCEL

MATHLAB

Languages

English
Bilingual or Proficient (C2)
Hindi
Intermediate (B1)
Tamil
Intermediate (B1)

Timeline

Electrical Engineer

Blackcat WLL
10.2022 - Current

Electrical Engineer

Qatar Energy(Qcon WLL)
11.2020 - 10.2022

Commissioning Supervisor

Emirates Technical Associates, ETA
06.2016 - 07.2018

Assistant Engineer

Kerala State Electricity Board Ltd.
06.2015 - 05.2016

Electrical Sub Engineer

Kerala State Electricity Board Ltd.
07.2014 - 06.2015

Bachelor of Technology - Electrical And Electronics Engineering

Amrita School of Engineering
01.2010 - 08.2014

High School Diploma -

SNVHSS
05.2008 - 06.2010

Electrical Supervisor

QPH(Worley Parson)
8 2018 - 7 2020
SARAN SASIDHARAN NAIRElectrical Engineer