Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic
SARATHKUMAR K

SARATHKUMAR K

Thrissur

Summary

Highly productive and efficient engineer with expertise in project management, problem-solving, troubleshooting, control wiring, power equipments and technical writing. Exceptional communication and teamwork skills contribute to successful project outcomes and foster collaborative work environments.

Overview

11
11
years of professional experience

Work History

Assistant Engineer

Kerala State Electricity Board
Thrissur
07.2024 - Current
  • Operation and maintenance such as Power Transformer,CT,PT,CB,LA,VCB,ODCB,Protection Relays,33 KV and 11KV buses,LT panel, HT panels etc.
  • Reviewed drawings and designs for compliance with applicable codes and regulations.
  • Evaluated existing systems for potential improvements or upgrades.
  • Developed test plans and conducted tests to ensure product reliability and safety standards are met.
  • Performed administrative and office duties by handling phone and email correspondence, ordering materials and bookkeeping.
  • Daily Power Equipments ( Power transformers,CT,PT,CB etc.monitoring and safety aspects check
  • Operation and maintenance of substation
  • Performed testing to determine functionality or optimization
  • Completed regulatory documents concerning safety issues.

Assistant Manager (Electrical)

Arya Vaidyasala Kottakkal
Kottakkal
07.2022 - 12.2023
  • Coordinate maintenance and project activities at factory and hospital facilities.
  • Oversee procurement and inventory of electrical supplies, ensuring organized storage for smooth project execution
  • Coordinate and facilitate the procurement of machinery by providing assistance throughout the purchasing process, ensuring alignment with technical requirements and quality standards
  • Analysed and successfully implemented an Energy Monitoring and Management system, enabling real-time tracking of energy consumption and contributing to sustainable and cost-effective energy practices within the organisation
  • Experience in such as Transformer, CT, PT, CB, HT/LT Electrical panel design, cable design, Cable Laying, VFD, PLC, Boiler, Furnace, Conveyors, Heat Pump, Hydraulic press, Generator, Load Management, Load Arrangement and sharing, appropriate electrical motor selection and replacement for the equipment's
  • MEP design and Inspection in new projects
  • Electrical Troubleshooting experience in 5 Ton boiler (Thermax, Forbes) and 8 Ton boiler (IAEC)

Assistant Engineer (Electrical)

Kerala State Electricity Board
Kerala
01.2018 - 01.2022
  • Operation and maintenance of HT/EHT Equipment's
  • Responsible for safety equipment's and awareness
  • Maintenance planning/Execution of HT/EHT network
  • Improvement projects for reliability enhancement
  • Ensuring/conducting safety Audits

Inspection Officer

Lazza Ice creams
Ernakulam
01.2017 - 01.2018
  • Inspect and test the machinery installed at the factory, then submit a report to the maintenance engineer
  • Perform routine inspections on (Electrical, Mechanical, and Refrigeration) machineries
  • Provide a detailed analysis report of each factory machinery and workers' activity
  • Monitor the operation of machineries to ensure their optimal functioning and health
  • Completed a 6-month training program as a mechanic in a plant

Assistant Engineer/ Sub Engineer

Kerala State Electricity Board
Kerala
01.2014 - 01.2017
  • Operation and maintenance of HT/EHT Equipment's
  • Responsible for safety equipment's and awareness
  • Maintenance planning/Execution of HT/EHT network
  • Improvement projects for reliability enhancement
  • Ensuring/conducting safety Audits

Contractor and Supervisor

K&T Constructions (Own Business)
Kerala
01.2014 - 01.2017
  • Erection of EHT Control and Relay panels, HT/LT Indoor and outdoor panels, Battery Charger, LT Distribution Panel etc
  • Laying of power cables (XLPE) and control cables
  • Erection of EHT equipments
  • Execution of control and protection of HT/LT feeders and power transformers including SF6 circuit breakers, Vacuum circuit breakers, current transformers, potential transformers, RTCC, isolators etc
  • Managing and supervising the mechanical and civil works too
  • Preparing, Schedule and Laying of control cables and HT/LT power cables
  • Preparing and schedule Interlock wiring through SCADA
  • CAD Drawing for Cable Laying
  • LV/HV circuit breaker Troubleshooting

Education

PG DIPLOMA - EMBEDDED SYSTEM

KELTRON
Trivandrum
01.2014

BACHELOR OF ENGINEERING - ELECTRICAL AND ELECTRONICS ENGINEERING

SALEEM
Salem, India
01.2013

Skills

  • Energy Management
  • Power Equipments Troubleshooting
  • Control Wiring
  • Total Quality Management
  • Stress analysis
  • Workforce Planning
  • 5S Implementation
  • AutoCAD proficiency
  • Innovation and Creativity
  • Safety Regulations
  • Materials Selection
  • Cost Estimation
  • Engineering principles
  • Mechanical Systems
  • Construction management
  • MS Project

Languages

English
Advanced
C1
Hindi
Intermediate
B1

Timeline

Assistant Engineer

Kerala State Electricity Board
07.2024 - Current

Assistant Manager (Electrical)

Arya Vaidyasala Kottakkal
07.2022 - 12.2023

Assistant Engineer (Electrical)

Kerala State Electricity Board
01.2018 - 01.2022

Inspection Officer

Lazza Ice creams
01.2017 - 01.2018

Assistant Engineer/ Sub Engineer

Kerala State Electricity Board
01.2014 - 01.2017

Contractor and Supervisor

K&T Constructions (Own Business)
01.2014 - 01.2017

PG DIPLOMA - EMBEDDED SYSTEM

KELTRON

BACHELOR OF ENGINEERING - ELECTRICAL AND ELECTRONICS ENGINEERING

SALEEM
SARATHKUMAR K