Seeking a challenging assignment in an organization that provides me ample opportunity to explore and excel while carving out the niche for personal, professional as well as organizational goals
Overview
18
18
years of professional experience
2010
2010
years of post-secondary education
Work History
Survey Supervision
LARSEN & TOUBRO
04.2023 - Current
Company Overview: Working on the Mumbai Ahmedabad High Speed Rail (Bullet Train) project
Working as Erection head Survey i.e.: - Erecting Segments (Gluing, Stressing and final Span lowering on bearing) at site
Survey Traversing at Deck top for preparing Hand over of Deck Furnishing work to Ircon Rail track team
Casting of segments at casting yard
Survey Work of Cast in situ Pier head segments, Align PHS Segment on Bearing
Survey Work of Narmada River 1.2km 60meter Span.as well as temporary bridge
Take care of Launching Girder Deflection Time to time from 0 segments Load to all segments Load
Working at Deck furnishing such as Noise barrier, Cable duct, adjusting concrete at Deck top
Construction of Depot merger line & Ramps from main Alignment
Execute Center Line & Level of Foundation Pile, Pile cap, Pier, Pier cap, Pedestal, Stopper
Co-ordinate fixing of piles, pile cap & piers, pier cap in land from soffit to superstructure intertidal zone and in marine location demarcation with reference to GAD of Layout Plan
Carried out survey work of Portal Beam, Pier head, Integral Pier head segment cast in situ at site with respect to approved control points
Fixing Alignment of precast Segment Shuttering with help of Geometric Control Software called Geo con
By short line method in Casting yard
Span Erection at segments in dry match, after gluing and after final stressing stage with respect to approved design drawings
Working on the Mumbai Ahmedabad High Speed Rail (Bullet Train) project
Senior Surveyor
AECOM Asia Company Ltd.
04.2018 - 04.2023
Company Overview: Working on the Mumbai Trans Harbour Link project
Working in an MTHL project for the Sr
Surveyor of execution and project coordination
Resource monitoring of 2.5km Temporary Bridge parallel to the Alignment of MTHL
Execute Center Line & Level of Foundation
Pile jacket set up for marine Piling work
Survey Work of RCD (Reverse Circulation Drilling) mobilization
Checking of Typical cross section, Cross Section, Plan & Profile
Co-ordinate fixing of piles, pile cap & piers, pier cap in land from soffit to superstructure intertidal zone and in marine location demarcation with reference to GAD of Layout Plan
Carried out survey work of Portal Beam, Pier head, Integral Pierhead segment cast in situ at site with respect to approved control points
Fixing Alignment of precast Segment Shuttering with help of Geometric Control Software called Geo con
By short line method in Casting yard
Span Erection at segments in dry match, after gluing and after final stressing stage with respect to approved design drawings
Carried out first time use in India's OSD (orthotropic steel Deck) span for MTHL.(Longest Span 181 m.)
Crash Barrier Set up with Approved GAD
Working on the Mumbai Trans Harbour Link project
Survey Engineer
BALAJI RAILROAD SYSTEMS PVT LTD.
02.2017 - 04.2018
Company Overview: Working on the EDFCC IL Pkg 302 project
Working in a DFCC project for the Survey Engineer of execution and project coordination
Frequent monitoring of activities in line with the Primavera Schedule
Checking cross section, all layers Levels & alignment from submitted design drawing by contractor
Working in a Dedicated Freight Corridor project for the Survey Engineer and inspection of the works carried out by Tata Projects Ltd
Checking Toe Line & Level of earth work, subgrade, Blanket, Ballast, sleepers and track for different layers
Inspection of the Survey & Formation work at site
Checking Line and Level for Sleeper Laying
Checking Track Layout and Alignment with design & drawing
Working on the EDFCC IL Pkg 302 project
Senior Surveyor-Projects (Execution)
SPML INFRA LTD.
05.2016 - 02.2017
Company Overview: Working on Infrastructure Works for Vikram Udyog Puri project
Working in an Urban Infra project for the Survey works, Drawing & Designing Checking and queries
Checking of Typical cross section, Cross Section, Plan & Profile
Checking & Minor Correction in drawing with Auto CAD and Auto Plotter
Prepare Level Sheet with camber details for Embankment, Subgrade, GSB, WMM, DBM & BC
Coordinate setting out for the execution of structures like Box Culverts, Major & Minor Bridges, Administrative Buildings, Overhead Tanks etc
Bill & Quantity Checking of Contractor
Coordinating with a team of engineers for all construction activities at site
Boundary wall design in AutoCAD software & complete the execution work of boundary wall at site
Entry Gate demarcation
Layout work carried out of structure like: WTP, STP, Fire station, Admin Building from beginning to end of work
Working on Infrastructure Works for Vikram Udyog Puri project
Assistant Manager Civil
MANGLAM BUILD- DEVELOPERS LTD.
05.2013 - 05.2016
Company Overview: Involved in the construction and development of various township projects
Develop Township Infrastructure of Major projects of Mangalam Group
Possession of Land take care of land measurement with Govt
Patwari and previous landlord
Solved the issue time to time of local peoples
Construction of Main Gate, Villas, Bungalows, Towers, Club House, Farm House, Swimming Pool, Water tank, water treatment plant, sewerage treatment Plant etc
At JAIPUR Projects such as: MANGLAM GRAND CITY, MAPPLEWOOD, PARK VIEW, MANGLAM AANGAN & AANGAN EXTENSION
Construction of Roads, Dividers, Electrical poles and erection of Date palm, bottle palm and other essential trees
Construction Water tanks, Development of Parks in Townships
Construction of Duplex Villas and other high rise buildings
Included aspects of carpentry, demolition, fencing, masonry, waterproofing, drywall, flooring
Loaded, unloaded and identified building materials, machinery, and tools, and distributed them to the appropriate locations, according to project plans and specifications
Cleaned and prepared construction sites to eliminate possible hazards
Grew business on word of mouth and referrals by exceeding expectations
Assisted in the remodelling and building of homes, received and inspected materials
Maintained cleanliness of job site, worked with several contractors and ensured their assigned task was finished
Worked with clients to ensure quality and project was progressing accurately and to their specifications
Involved in the construction and development of various township projects
Sr Surveyor-Projects (Execution)
PRATIBHA IND. LTD.
01.2011 - 03.2013
Company Overview: Involved in the Jaipur Metro Rail Project
Establishing the Main control points to cover all structures of projects
Layout of Anchor bolts, ETU & OCC building, Stabling Shed, Interior Cleaning Structure, All utilities Crossing, Signal and telecom Cable, Track Alignment, boundary wall with Respect to Main control Pillars from Approved Drawing of DMRC
Demarcation of rounded Auditorium from Ground level to 3rd floor
Co-ordinates Demarcation in Jaipur Metro Rail Project of Depot, Ramp, Mansarover Station to Vivek Vihar with help of Auto CAD Software
All Work in Auto CAD and excel relating to Survey
Calculating Quantities for Subcontractors
Superimpose the Design drawing from approved DMRC drawings in AutoCAD Software
Preparing L section cross section with help of Auto plotter Software
Droughting design with Client of Boundary wall structure in AutoCAD
Superimpose the Drawing in AutoCAD of Ramp Area which is connected to depot from mansarover station to vivek vihar
Fixing Alignment of precast Segment By short line method in casting Yard
Involved in the Jaipur Metro Rail Project
Surveyor-Projects (Supervision)
STUP INDIA LTD.
05.2010 - 01.2011
Company Overview: Involved in the Four Lanning of Jaipur Tonk Deoli Section of NH-12 project
Layout Planning of VUP, Minor Bridge & Major Bridge
Carried out all survey works of Toe line and levels from OGL to All Layers such as C&G, Embankment, GSB, Sub grade, DBM BC as per approved Drawings
Resource Inspection monitoring works
Fixing of Bearing (POT/Elastomeric) with Total Station by Reference Layout Plan
Catch up and recovery planning as per requirement
Coordinating a team of engineers for the execution of structures like Box Culverts, Major & Minor Bridges etc
Coordinating with a team of engineers for all construction activities at site
Planning of daily construction activities ensuring progress according to time schedule
Checking & Correction of BBS
Location fixing of piles & piers Demarcation with reference of GAD of Layout Plan
Resolving any discrepancies arising in execution of structures & Highway by discussing the matter with the clients and satisfying them with proper explanations
Setting out of horizontal curves as per designs
Fixing of closed Traverse along the Highways with respect to the GPS Stations
Fixing of permanent and temporary Benchmarks
Fixing of Alignment and taking cross-Sections for getting original level's Collecting Survey data from existing Cross Drainage Structure
Fixing Alignment & Internal points for new Structures
Taking Joint measurements with representatives
Supervision of earth work, GSB, WMM & DBM, BC as per relevant specification of MORTH
Involved in the Four Lanning of Jaipur Tonk Deoli Section of NH-12 project
Surveyor
S P SINGLA CONSTRUCTION PVT. LTD.
07.2007 - 06.2008
Company Overview: Involved in various projects including the Airport Authority of India Amritsar
Worked as a Surveyor at site
Primarily executed Pile Foundations in offshore as mentioned above
Executed Cast in situ Piles of 1200 mm diameter and up to 15 meters length
Also executed Steel Piles which were raked (1:5) with Jack up Barge and Delma Hammer
Location Marking of Piles at Site by Total Station
Layout Plan Demark at Site
OGL Stretch Making for Checking & Subgrade Stretch Making with Camber & Gradient for Runway
GSB Stretch Making with Center Line, Camber & Gradient- and Jointly Checking with Client
Preparing DLC with proper processing for Jointly Checking with Client
Carry out survey and investigation of projects/schemes as per directions of the superior officers
Center Line, Level Marking, Maintained Camber & Gradient for PQC
Marking & Level of Pile, Pile Cap, Pier, Pier Cap, Pedestal Casting with Reference of Layout & Level and POT Bearing Fixing with under tolerance limit in (+.001, -.001mm)
Involved in various projects including the Airport Authority of India Amritsar
Education
DIPLOMA IN CIVIL ENGINEERING -
AIIMT Delhi
Diploma - Civil Surveying
Board of technical education jodhpur
Jodhpur, Rajasthan
Intermediate - undefined
Central Board of Secondary Education
Ajmer, Rajasthan
Matriculation - undefined
Central Board of Secondary Education
Ajmer, Rajasthan
Skills
Execution of Structure Erection
Extra-Curricular Activities
Playing National two times in Cricket and playing National one time in KHO-KHO in Kendriya Vidyalaya school Having C certificate of NCC during Diploma in Civil Surveying (Board of Technical Education Jodhpur, Rajasthan), 2008
Assistant General Manager – International Marketing & Business Development at Larsen & ToubroAssistant General Manager – International Marketing & Business Development at Larsen & Toubro