Summary
Overview
Work History
Education
Skills
Important Projects Handled
Personal Information
Roles And Responsibilities
Disclaimer
Timeline
Generic
KUNDURU SATISH KUMAR

KUNDURU SATISH KUMAR

Electro Mechanical - Techno commercial Coordinator
Hyderabad,MH

Summary

To obtain a challenging position in Mechanical Engineering with an organization of repute, that will provide an opportunity to utilize my knowledge of Designing , EMI Coordination & BID management continuing my professional and personal growth where my positive attitude, integrity and strong desire to succeed will contribute the company’s success.

18+ years of experience in Pre & Post Engineering for various engineering EPC projects estimation, post-engineering and EMI coordination. Technical Comparison for Mechanical equipment's for Pumping Stations, Water & Waste water management systems.

Proactive manager with demonstrated leadership abilities, strategic planning expertise and problem-solving acumen. Assists senior managers with accomplishing demanding targets by encouraging staff and coordinating resources. Methodical and well-organized in optimizing coverage to meet operational demands.

Overview

18
18
years of professional experience
3
3
Languages

Work History

Assistant Manager

GVPR Engineers Ltd
07.2021 - Current
  • Electro Mechanical Coordination with project Team & End Client
  • Techno -commercial coordination with SCM & Management
  • Improved Client satisfaction by addressing and resolving complaints promptly.
  • Developed strong working relationships with staff, fostering a positive work environment.
  • Promoted teamwork within the workplace by encouraging collaboration among staff members on various project tasks.
  • Team Lead role in the EMI Team
  • IMPORTANT PROJECTS HANDLED IN GVPR:
  • Jhilo 69 MLD drinking water project, Uttar Pradesh 14 Nos Pumping Stations (Total No of Pumps sets 68)
  • Sala 53 MLD drinking water project, Uttar Pradesh 13 Nos Pumping Stations (Total No of Pumps sets 59)
  • Parwan major multi-purpose lift irrigation project 132750 Ha CCA. 61 Nos Pumping Stations (Total No of Pumps sets 217)
  • Jalore drinking water project, Rajasthan 16 Nos Pumping Stations (Total No of Pumps sets 60)
  • Bhim-Bhilwara drinking water projects, Rajasthan 20 Nos Pumping Stations (Total No of Pumps sets 89).
  • Pipalkhunt LIS- WRD - Intake - IPS - 7 Diggies(Total No of Pumps sets 29)
  • Kaliteer LIS - WRD - Intake - IPS - (Total No of Pumps sets 15)
  • Waghur LIS - MJP - Intake - IPS (Total No of Pumps sets 11)

Associate Manager - Designs

M/s Megha Engineering & infrastructures ltd
01.2021 - 04.2021

Asst Manager - Tenders

M/s GVPR ENGINEERS Limited
02.2019 - 12.2020
  • Preliminary & detail engineering of unit sizing, equipment, piping and appurtenances
  • Review the technical Doc as per the tender Specification
  • Preparing the Power Calculations & Drive List
  • Site Visiting
  • Technical & Commercial Discussion with Management
  • Preparing the Post-bid Queries
  • Attending the Post-bid meeting with client
  • Price bid preparation of EMI scope as per the Clients Price Schedule
  • Submitting the technical documents in due Date
  • Coordinating with Tender & Procurement department
  • Lead role in the EMI Team
  • IMPORTANT PROJECTS HANDLED IN GVPR:
  • Augmentation to Nhavasheva Water Supply Scheme, Stage – III, Tal – Panvel, Raigard Dist
  • Maharashtra Jeevan Pradhikaran
  • Malad Influent Pumping Station, Mumbai Sewage Disposal Project Stage II - Priority Works
  • Municipal Corporation of Greater Mumbai
  • Execution of Rural piped Water supply projects to Nayagarh, Part of Nuagaon, Khandapada and Bhapur blocks in the District of NAYAGARH
  • RWSS ODISHA
  • Udugani-Talagunda-Hosuru Hobli of Shikaripura Taluk in Shivamogga district by lifting water from Tungabhadra River near Puradakeri village including Operation and Maintenance for a period of 5 years
  • Karnataka Neeravari Nigam Limited
  • Tank Filling in Pavagada taluka Upper Bhadra lift irrigation Project – Chitradurga, Karnataka
  • Vishweswraya Jal Nigam Ltd

Senior Engineer - Mechanical

M/s IVRCL Limited
03.2007 - 02.2019
  • Company Overview: ISO/IMS Certified Company
  • Preliminary & detail engineering of unit sizing, equipment, piping and appurtenances
  • Review the technical Doc as per the tender Specification
  • Preparing the Power Calculations & Drive List
  • Site Visiting
  • Technical & Commercial Discussion with Management
  • Preparing the Post-bid Queries
  • Attending the Post-bid meeting with client
  • Price bid preparation of EMI scope as per the Clients Price Schedule
  • Submitting the technical documents in due Date
  • Coordinating with Tender & Procurement department
  • Lead role in the EMI Team
  • ISO/IMS Certified Company
  • IMPORTANT PROJECTS HANDLED IN IVRCL:
  • Remodelling of Water Supply Distribution system and allied works in Bannur Town under UIDSSMT - (Package No
  • WU-BANNUR-I)
  • Comprehensive Operation & Maintenance of C.W.S.S.Stage IV Phase I Pumping Stations at T.K.HALLI, HAROHALLI & TATAGUNI, INCLUDING 220 / 66 / 6.6kV, Substations At HAROHALLI and TATAGUNI for 7 Years
  • NTPC, Pre-Treatment Plant Package for Muzaffarpur Thermal Power Project, Bihar
  • This project deals with design of Water Pre-Treatment System, Chlorination System, Liquid Effluent Treatment System, and PT Plant Clarifier Sludge System
  • Govt of Tamilnadu, Hogenakkal Water Supply & Fluorosis Mitigation Project Package 2, This project deals with the Treated Water Trunks mains from Master Balancing reservoir to Uthangarai, Branch pipe lines, Union Reservoirs, Panchayat Reservoirs, Over Head Tanks, Chlorination Stations, Boosting Pumping Stations
  • ONGC, Dahej Petro Chemical Complex, Gujarat
  • Infrastructure development package
  • Govt of Karnataka, Karnataka Urban Water Supply & Drainage Board, (KUWSD), 25.25 MLD Water Treatments Plant at Almatti
  • This project deals with Water Treatment Plant
  • UP JAL Nigam, Ganga Pollution Control Unit Allahabad, This project deals with the 6 Sewage Pumping Stations & 1 Proposed STP at different places like Allahpur, Alopibagh, Morigate, Daraganj, Mumfordganj and Rajapur, Proposed STP at Rajapur

Education

Bachelor of Technology - Mechanical Engineering

VNRVJIET
Hyderabad
04.2001 -

Skills

  • Auto CAD

  • Primavera

  • MS OFFICE

Team building

Project management abilities

Time management

Important Projects Handled

Augmentation to Nhavasheva Water Supply Scheme, Stage – III, Tal – Panvel, Raigard Dist. Maharashtra Jeevan Pradhikaran., Malad Influent Pumping Station, Mumbai Sewage Disposal Project Stage II - Priority Works. Municipal Corporation of Greater Mumbai., Execution of Rural piped Water supply projects to Nayagarh, Part of Nuagaon, Khandapada and Bhapur blocks in the District of NAYAGARH. RWSS ODISHA., Udugani-Talagunda-Hosuru Hobli of Shikaripura Taluk in Shivamogga district by lifting water from Tungabhadra River near Puradakeri village including Operation and Maintenance for a period of 5 years. Karnataka Neeravari Nigam Limited., Tank Filling in Pavagada taluka Upper Bhadra lift irrigation Project – Chitradurga, Karnataka. Vishweswraya Jal Nigam Ltd., Remodelling of Water Supply Distribution system and allied works in Bannur Town under UIDSSMT - (Package No. WU-BANNUR-I), Comprehensive Operation & Maintenance of C.W.S.S.Stage IV Phase I Pumping Stations at T.K.HALLI, HAROHALLI & TATAGUNI, INCLUDING 220 / 66 / 6.6kV, Substations At HAROHALLI and TATAGUNI for 7 Years., NTPC, Pre-Treatment Plant Package for Muzaffarpur Thermal Power Project, Bihar. This project deals with design of Water Pre-Treatment System, Chlorination System, Liquid Effluent Treatment System, and PT Plant Clarifier Sludge System., Govt of Tamilnadu, Hogenakkal Water Supply & Fluorosis Mitigation Project Package 2, This project deals with the Treated Water Trunks mains from Master Balancing reservoir to Uthangarai, Branch pipe lines, Union Reservoirs, Panchayat Reservoirs, Over Head Tanks, Chlorination Stations, Boosting Pumping Stations., ONGC, Dahej Petro Chemical Complex, Gujarat. Infrastructure development package., Govt of Karnataka, Karnataka Urban Water Supply & Drainage Board, (KUWSD), 25.25 MLD Water Treatments Plant at Almatti. This project deals with Water Treatment Plant., UP JAL Nigam, Ganga Pollution Control Unit Allahabad, This project deals with the 6 Sewage Pumping Stations & 1 Proposed STP at different places like Allahpur, Alopibagh, Morigate, Daraganj, Mumfordganj and Rajapur, Proposed STP at Rajapur.

Personal Information

  • Date of Birth: 02/06/85
  • Gender: Male
  • Marital Status: Married

Roles And Responsibilities

  • Preliminary & detail engineering of unit sizing, equipment, piping and appurtenances.
  • Review the technical Doc as per the tender Specification.
  • Preparing the Power Calculations & Drive List.
  • Site Visiting.
  • Technical & Commercial Discussion with Management.
  • Preparing the Post-bid Queries.
  • Attending the Post-bid meeting with client.
  • Price bid preparation of EMI scope as per the Clients Price Schedule.
  • Submitting the technical documents in due Date.
  • Coordinating with Tender & Procurement department.
  • Lead role in the EMI Team

Disclaimer

I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars. I am Sincere, Hardworking and always eager to learn. I focus completely on duties and the Responsibilities assigned to me. I try to be perfect in every work. I do and satisfy the most micro details of the job. All the above given details are correct to the best of my knowledge.

Timeline

Assistant Manager

GVPR Engineers Ltd
07.2021 - Current

Associate Manager - Designs

M/s Megha Engineering & infrastructures ltd
01.2021 - 04.2021

Asst Manager - Tenders

M/s GVPR ENGINEERS Limited
02.2019 - 12.2020

Senior Engineer - Mechanical

M/s IVRCL Limited
03.2007 - 02.2019

Bachelor of Technology - Mechanical Engineering

VNRVJIET
04.2001 -
KUNDURU SATISH KUMARElectro Mechanical - Techno commercial Coordinator