Summary
Overview
Work History
Education
Skills
Personal Information
Certification
Timeline
Generic

Satish Kumar Singh

Lead Engineer
kharghar

Summary

Detail-oriented, organized and meticulous employee. Works at fast pace to meet tight deadlines. Enthusiastic team player ready to contribute to company success.

Overview

16
16
years of professional experience
10
10
Certifications

Work History

Senior Engineer

GALFAR Engineering & Contracting S.A.O.G
  • Responsible for the overall activities for the test package, cleaning, flushing, hydro testing, Dewatering, drying, and nitrogen purging of complete plants, various Pipelines & spools like (SS, CS, and GRE) also preparation/ mobilization of all necessary equipment/ material list and submission of a report under the method statement and arrange the work area and crews.

Project Lead Sup

Ener Mech Qatar L.L.C
07.2021
  • Coordinator – Pre-Commissioning of sub see 16” 10 km and 9 km, DP-4 To DT 2 and DP-3 To DP 2 overall activities for the test package, documentation till handing over to commissioning also preparation/ mobilization of all necessary equipment/ material list and submission of a report under the method statement and arrange the work area and crews accordingly and performing authority
  • Including Mane, materials, and logistic support.

Project Engineer

Supreme Offshore Construction & Technical Limited
10.2002
  • Dealing with pipeline project coming out spool fabrication, measurement, and explanation of drawing to supervisor & works erection, pigging cleaning, dewatering, drying hydrostatic testing and nitrogen purging of various gas, oil line at offshore and onshore which also includes site administration, project works organizing of manpower for a project, etc
  • Planning and distribution of work as per schedule for both onshore offshore project for ONGC project India.

Site Engineer

Ariadna-Ener Mech JV(Kazakhstan)
4 2024 - Current
  • Coordinator – lube oil flushing of 7 compressors, preparation/ mobilization of all necessary equipment/ material list and submission of a report under the method statement and arrange the work area and crews accordingly, including Mane, materials, and logistic supports

Site Engineer

Ener Mech K S A L.L.C
- 01.2022
  • Coordinator - lube oil flushing of 7 compressors, preparation/ mobilization of all necessary equipment/ material list and submission of the report under the method statement and arrange the work area and crews accordingly, including Mane, materials, and logistic supports

Project Lead Sup

Ener Mech Qatar L.L.C
- 11.2021
  • Coordinator – Pre-Commissioning of sub see 20” 9.6 km and 14” 9.5 km, Alpha to Fox platform overall activities for the test package, documentation till handing over to commissioning also preparation/ mobilization of all necessary equipment/ material list and submission of a report under the method statement and arrange the work area and crews accordingly and performing authority
  • Including Mane, materials, and logistic support.

Project Engineer PPU

Trans Asia Pipeline and Process Services Ltd
06.2018 - 08.2019
  • Responsible for Coordination of Nitrogen/Helium Leak Testing, overall activities for the test package, verifying all documentation till handed over to the commissioning Engineer also preparation/ mobilization of all necessary equipment/ material list, and submitting a report under the method statement.

Pneumatic Test Lead Sup

Baker Hughes & GE
10.2017 - 04.2018
  • Responsible for QC Coordination Pneumatic Testing, overall activities for the test package, verifying all documentation till handed over to the commissioning Engineer, preparation/ mobilization of all necessary equipment/ material list, and submission of a report under the method statement.

Engineer

Baker Hughes
09.2015 - 12.2015
  • Responsible for Coordination of Nitrogen/Helium Leak Testing, overall activities for the test package, verifying all documentation till handed over to the commissioning Engineer, preparation/ mobilization of all necessary equipment/ material list, and submission of the report under the method statement.

Project Engineer N2/Hel Leak Test

Ener Mech
03.2015 - 08.2015
  • Responsible for Nitrogen/Helium Leak Testing, overall activities for the test package, documentation till handing over to the commissioning Engineer also preparation/ mobilization of all necessary equipment/ material list and submission of a report under the method statement, and arranging the work area and crews accordingly.

Field Specialist

BAKER HUGHES (BJ)
05.2014 - 12.2014
  • Responsible for Hydro Test, Chemical Cleaning and Degreasing, N2/Helium Leak Testing documentation till handed over to the client also preparation/ mobilization of all necessary equipment/ material list and submission of a report under the method statement and arranging the work area and crews accordingly and performing authority.

LN2 BACK-UP Engineer Pre-commissioning

Ener Mech
08.2013 - 05.2014
  • Responsible for Nitrogen Pumping and, documentation till handing over to the client also preparation/ mobilization of all necessary equipment/ material list and submission of a report under the method statement and arranging the work area and crews accordingly, and performing authority.

QC Coordinator N2/Hell Leak Testing, Pre-commissioning & commissioning

Baker Hughes
05.2013 - 08.2013
  • Responsible for QC Coordinator Nitrogen/Helium Leak Testing, overall activities for the test package, documentation till handing over to commissioning also preparation/ mobilization of all necessary equipment/ material list and submission of a report under the method statement and arranging the work area and crews accordingly and performing authority.

Engineer N2/HE Leak Test & Pneumatic Testing Per Commissioning

Baker Hughes
06.2012 - 04.2013
  • Responsible for Nitrogen/Helium Leak Testing, overall activities for the test package, documentation till handing over to the commissioning Engineer also preparation/ mobilization of all necessary equipment/ material list and submission of the report under the method statement, and arranging the work area and crews accordingly.

Coordinator for Hydro Test & Pre Commissioning

Attila Dogan LLC
04.2011 - 06.2012
  • Responsible for as a QC Coordinator overall activity for the test package, cleaning, flushing, hydro testing, of off plot piping Dewatering, drying, and nitrogen purging of various Pipelines & spools like (SS, CS, and GRE) also preparation/ mobilization of all necessary equipment/ material list and submission of the report under the method statement and arrange the work area and crews accordingly.

SR. Hydro Test Engineer Pre-commissioning

GALFAR Engineering & Contracting S.A.O.G
10.2010 - 03.2011
  • Responsible for the overall activities for the test package, cleaning, flushing, hydro testing, Dewatering, drying, and nitrogen purging of various Pipelines & spools like (SS, CS, and GRE) also preparation/ mobilization of all necessary equipment/ material list and submission of the report under the method statement and arranging the work area and crews.

Hydro Test Engineer

GALFAR Engineering & Contracting S.A.O.G
- 09.2010
  • Responsible for the overall activities for the test package, cleaning, flushing, hydro testing, Dewatering, drying, and nitrogen purging of complete plants, various Pipelines & spools like (SS, CS, and GRE) also preparation/ mobilization of all necessary equipment/ material list and submission of the report under the method statement and arrange the work area and crews.

Hydro Test Engineer

GALFAR Engineering & Contracting S.A.O.G
- 09.2010
  • Responsible for the overall activities for the test package, cleaning, flushing, hydro testing, Dewatering, drying, and nitrogen purging of complete plants, various Pipelines & spools like (SS, CS, and GRE) also preparation/ mobilization of all necessary equipment/ material list and submission of the report under the method statement and arrange the work area and crews.

Hydro Test Engineer

GALFAR Engineering & Contracting S.A.O.G
11.2008 - 08.2010
  • Responsible for the overall activities for the test package, cleaning, flushing, hydro testing, Dewatering, drying, and nitrogen purging of complete plants, various Pipelines & spools like (SS, CS, and GRE) also preparation/ mobilization of all necessary equipment/ material list and submission of a report under the method statement and arrange the work area and crews.

Senior Supervisor

Pipeline Services LLC
- 10.2008
  • Pigging, Chemical cleaning, gauging, disinfection, intelligent pigging and leak test of various oil pipelines D-AFP-16-0: 0-AFP-24”-30 Km, Gas pipeline ccp3-U-8”-G 28km, CCP1-E-6-G 55km and water injection pipeline 20”dia
  • 15 km, 18” dia 27 km, 16” dia 11 km & 12” dia 30 km at Fateh and SWF field offshore facilities for Dubai Petroleum Co.

Chief Petty Officer (CPO)

Indian Navy
- 06.2002
  • Performing administrative works and Project works
  • Establish and maintain an effective working relationship with internal and external customers, co-workers, and peers and invest less manpower, tools, and tackles and gain more production and implement of work schedule for completing of the project in the stipulated time, etc.

Education

High School Diploma -

Board of High School & Intermediate Council
Patna, Bihar, India
04.2001 -

Graduation -

Indian Navy (CABS Mumbai) Advance Leadership
Coimbatore, Tamil Nadu, India
04.2001 -

Diploma - Industrial Management, Fire Fighting & First Aid

Safety Officer Course (Diploma in Industrial
04.2001 -

Skills

Quality Control

Personal Information

  • Passport Number: R 4800379
  • Passport Date Of Issue: 10/22/17
  • Passport Expiry Date: 10/21/27
  • Date of Birth: 06/12/70
  • Gender: Male
  • Nationality: Indian
  • Marital Status: Married

Certification

HSE training

Timeline

Project Lead Sup

Ener Mech Qatar L.L.C
07.2021

Project Engineer PPU

Trans Asia Pipeline and Process Services Ltd
06.2018 - 08.2019

Pneumatic Test Lead Sup

Baker Hughes & GE
10.2017 - 04.2018

Engineer

Baker Hughes
09.2015 - 12.2015

Project Engineer N2/Hel Leak Test

Ener Mech
03.2015 - 08.2015

Field Specialist

BAKER HUGHES (BJ)
05.2014 - 12.2014

LN2 BACK-UP Engineer Pre-commissioning

Ener Mech
08.2013 - 05.2014

QC Coordinator N2/Hell Leak Testing, Pre-commissioning & commissioning

Baker Hughes
05.2013 - 08.2013

Engineer N2/HE Leak Test & Pneumatic Testing Per Commissioning

Baker Hughes
06.2012 - 04.2013

Coordinator for Hydro Test & Pre Commissioning

Attila Dogan LLC
04.2011 - 06.2012

SR. Hydro Test Engineer Pre-commissioning

GALFAR Engineering & Contracting S.A.O.G
10.2010 - 03.2011

Hydro Test Engineer

GALFAR Engineering & Contracting S.A.O.G
11.2008 - 08.2010

Project Engineer

Supreme Offshore Construction & Technical Limited
10.2002

High School Diploma -

Board of High School & Intermediate Council
04.2001 -

Graduation -

Indian Navy (CABS Mumbai) Advance Leadership
04.2001 -

Diploma - Industrial Management, Fire Fighting & First Aid

Safety Officer Course (Diploma in Industrial
04.2001 -

Senior Engineer

GALFAR Engineering & Contracting S.A.O.G

Site Engineer

Ariadna-Ener Mech JV(Kazakhstan)
4 2024 - Current

Site Engineer

Ener Mech K S A L.L.C
- 01.2022

Project Lead Sup

Ener Mech Qatar L.L.C
- 11.2021

Hydro Test Engineer

GALFAR Engineering & Contracting S.A.O.G
- 09.2010

Hydro Test Engineer

GALFAR Engineering & Contracting S.A.O.G
- 09.2010

Senior Supervisor

Pipeline Services LLC
- 10.2008

Chief Petty Officer (CPO)

Indian Navy
- 06.2002
Satish Kumar SinghLead Engineer