Summary
Overview
Work History
Education
Skills
Interests
DECLARATION
Timeline
Generic
Satyajit Dey

Satyajit Dey

Belghoria

Summary

Looking to contribute to organizations that provide challenging environments to apply skills effectively. Recognized for a fast-paced work ethic and strong problem-solving abilities. Proficient in cultivating collaborative relationships and maintaining diplomatic interactions. Dedicated to ongoing learning and adapting to evolving challenges.

Overview

18
18
years of professional experience
1
1
Language

Work History

PROJECT INCHARGE(CIVIL)

Air Water India Pvt. Ltd.
01.2024 - Current
  • L-1250 TPD,BOO OXYGEN PLANT, SAIL DSP SITE
  • ARCHITECTS: PAN GAULF TECHNOLOGY
  • CLIENT: SAIL, DSP.

PROJECT INCHARGE

Inox Air Products Pvt. Ltd.
11.2021 - 12.2023
  • L-200 TPD,PROPOSED PLANT FOR INOX AIR PRODUCTS PVT LTD,RAEBARELI SITE
  • ARCHITECTS: PRASHANT DESHMUKH & ASSOCIATES
  • CLIENT: Inox Air Products Pvt. Ltd.

SENIOR ENGINEER

Creative Projects and Contracts Pvt. Ltd.
03.2021 - 10.2021
  • SATTVA ENDEVOUR, ELECTRONIC CITY, PHASE-II
  • ARCHITECTS: MORPHOGENESIS
  • CLIENT: SATTVA

SENIOR ENGINEER GRADE-II ( CONSTRUCTION)

Simplex Infrastructures Ltd.
07.2018 - 02.2021
  • APTIDCO HOUSING PROJECT , TIRUPATHI(C-3267) (July 2018-May 2019) , ZUARI GARDEN CITY, MYSORE (C-2957) (June 2019 to till now)
  • DEVELOPER: SIMPLEX INFRASTRUCTURES LTD, VAIKUNTH,2ND FLOOR,82-83
  • ARCHITECTS: THOMAS ASSOCIATS (For C-2957)
  • CLIENT: APTIDCO (For C-3267), ZUARI (For C-2957)

SENIOR ENGINEER

BGR Energy Systems Ltd.
02.2018 - 06.2018
  • 3X660 MW Ghatampur Thermal Power Project
  • Prepare vendor’s bill & client bill ,Quantity estimation, material reconciliation ,& SECTION INCHARGE of Coal Handling Plant( CHP )
  • CONSULTANT: DESIGN PRIVATE LTD.
  • CLIENT: NEYVELI UTTAR PRADESH POWER LTD(NUPPL).

Project Incharge

Tsewang Galtsen ( Contractor Firm)
08.2014 - 01.2018
  • IndustrialBuilding, Heba Pharmaceutica, Sikkim, Classical Paradise Hotel & Resort Ltd.(Ambuja Neotia) Pangthang
  • Prepare vendor’s bill & client bill ,Quantity estimation, material reconciliation , Rate analysis, DPR maintain, Project monitoring, paid vs claim report making
  • CONSULTANT: SHAH & SHAH ( Heba Pharmaceutica), MICD Associates (Classical Paradise Hotel & Resort Ltd.(Ambuja Neotia))
  • CLIENT: Heba Pharmaceutica LLP, Ambuja Neotia.

ASST. ENGINEER

Mcnally Bharat Enineering co.Limited – Infrastructure&construction Division.
07.2012 - 06.2014
  • TATA POWER PLANT(2012-2014), 3x63.5MW Combined Power Plant
  • In-charge of Boilar1,2,3 & Guard Pond, Workshop Building, Compressor House, Light Dense Oil storage tank and Pump house, Pipe rack, FD & ID Fan Foundation, Dyke wall, Station Building, Gass INSULATION Sub station,and Miscelenious job& Finishing work
  • CONSULTANT: TCE
  • CLIENT: TATA PROJECT LTD
  • DESIGN CONSULTANT: TATA POWER LTD

Junior Engineer

Larsen & Toubro Limited – ECC Division
07.2008 - 06.2012
  • Mejia Thermal Power Plant(2008-2010), Vemagiri Power Genaration Limited(2011), Talwandy Sabo Power Limited(2011-2012)
  • In-charge of DM Plant(For MTPS), In-charge of Reinforcement Yard& Cement mortar lining for inside of pipeline(2300mm dia&1.2km)(For VPGL), Site In-charge for NDCT(Natural draft cooling tower)&service water basin area
  • CONSULTANT: Larsen & Toubro Limited-E&C Division-Group II (For MTPS & VPGL), TCE(For TSPL)
  • CLIENT: DVC(For MTPS) & GMR(For VPGL), SEPCO 1(For TSPL)
  • DESIGN CONSULTANT: L&T (S&L), SEPCO 1(For TSPL)
  • SCOPE OF WORK: Water Package System(For MTPS), 2X384 MW CCPP(For VPGL)

Education

AMIE - Civil Engineering

Technical Studies - Civil Engineering

Ramakrishna Mission Shilpapitha
01.2008

Technical Studies - Civil Engineering

Ramakrishna Mission Shilpapitha
01.2008

Technical Studies - Civil Engineering

Ramakrishna Mission Shilpapitha
01.2007

Technical Studies - Civil Engineering

Ramakrishna Mission Shilpapitha
01.2007

Technical Studies - Civil Engineering

Ramakrishna Mission Shilpapitha
01.2006

Technical Studies - Civil Engineering

Ramakrishna Mission Shilpapitha
01.2006

Higher Secondary Examination - undefined

Udaypur Haradayal Nag Adarsha Vidyalaya
01.2005

Secondary Education - undefined

Nimta High School
01.2003

Skills

Operating system: Windows 10

Packages: MS Office, MS Excel, MS Word, AUTO CAD, Power Point

Theoretical and practical knowledge about Auto Level (SOKKIA AC3 10) and Total Station (SET1 130R)

Interests

Reading story book & write diary Listening music Watching movie Playing Guitar (learner)

DECLARATION

I hereby declare that all information and facts given above are true to the best of my knowledge and belief. Date: 2025-10-22 Place: Durgapur, WB

Timeline

PROJECT INCHARGE(CIVIL)

Air Water India Pvt. Ltd.
01.2024 - Current

PROJECT INCHARGE

Inox Air Products Pvt. Ltd.
11.2021 - 12.2023

SENIOR ENGINEER

Creative Projects and Contracts Pvt. Ltd.
03.2021 - 10.2021

SENIOR ENGINEER GRADE-II ( CONSTRUCTION)

Simplex Infrastructures Ltd.
07.2018 - 02.2021

SENIOR ENGINEER

BGR Energy Systems Ltd.
02.2018 - 06.2018

Project Incharge

Tsewang Galtsen ( Contractor Firm)
08.2014 - 01.2018

ASST. ENGINEER

Mcnally Bharat Enineering co.Limited – Infrastructure&construction Division.
07.2012 - 06.2014

Junior Engineer

Larsen & Toubro Limited – ECC Division
07.2008 - 06.2012

AMIE - Civil Engineering

Technical Studies - Civil Engineering

Ramakrishna Mission Shilpapitha

Technical Studies - Civil Engineering

Ramakrishna Mission Shilpapitha

Technical Studies - Civil Engineering

Ramakrishna Mission Shilpapitha

Technical Studies - Civil Engineering

Ramakrishna Mission Shilpapitha

Technical Studies - Civil Engineering

Ramakrishna Mission Shilpapitha

Technical Studies - Civil Engineering

Ramakrishna Mission Shilpapitha

Higher Secondary Examination - undefined

Udaypur Haradayal Nag Adarsha Vidyalaya

Secondary Education - undefined

Nimta High School
Satyajit Dey