SATYAJIT MOHANTY

SATYAJIT MOHANTY

JAJPUR

Summary

Results-driven professional specializing in technical supervision and quality assurance for mechanical projects. Strong interpersonal skills facilitate collaboration among diverse teams, ensuring successful project execution. Proven track record in managing complex mechanical operations with a focus on meticulous planning and proactive problem-solving. Expertise in equipment installation and commissioning, ensuring compliance with project specifications and safety protocols while enhancing project integrity and client satisfaction.

Overview

16
16
years of professional experience

Work History

Sr. Mechanical Engineer

Tata consulting engineers
12.2024 - Current

Project: Manufacturing facility of SLMG Beverages at Buxar Bihar.

Client: SLMG Beverages Pvt Ltd

Project: 1264 Cr

  • Monitoring Mechanical Activities: Oversee all mechanical operations, ensuring they meet project requirements, safety standards, and quality benchmarks.
  • PEB Structure Fabrication & Erection: Supervise and verify the fabrication and installation of Pre-Engineered Buildings (PEB) structures, ensuring compliance with design specifications and safety norms.
  • Fire Fighting Systems: Monitor the installation and functionality of firefighting systems, including pipelines, tanks, and related equipment, ensuring their readiness for emergency situations.
  • Chiller Plant project: Oversee the installation, commissioning, and maintenance of chiller plants, ensuring efficient operation and adherence to safety standards.
  • Water Tank Management: Ensure proper installation, testing, and maintenance of raw water tanks, effluent treatment plants (ETP), water treatment plants (WTP), and sewage treatment plants (STP).
  • Involve Boiler, Chimney, Conveyer, Back filter, Cyclone, Ash silo All Erection & commissioning activities.
  • Equipment Erection and Alignment Checking: Supervise the erection and alignment of major equipment, including boilers, ensuring they are correctly installed and fully functional.

Project Engineer

Tata Steel Ltd.
Noamundi
08.2023 - 11.2024

Project: 6MTPA IOPP Project

Client: Tata Steel

Project Cost: 3300 Cr

  • In Depth Knowledge of Conveyor Line Project Work.
  • Attending weekly meetings with the client and ensuring all the planned quality activities are being implemented.
  • Knowledge of reading drawing (P&ID, PFD, VENDOR drawing).
  • Notify the non-conformance identified during site inspection and recommended corrective -measures to Site In charge & HOD.
  • To ensure customer complaints related to quality are investigated and necessary corrective and -preventive actions are implemented.
  • Providing Technical Clarifications & Attending the project reviews as per agreed plan and schedule.
  • Day to day work planning and work distribution. Preparation of daily reports and documents.
  • Checking monthly bill of all contractors, Raised NCR OR PENALTY note to contractor.
  • Sending mail & letter to higher authorities or client.AS per client & senior officer required prepare all work-related documents.

Sr. engineer piping project

SEPCO-III
GODDA, JHARKHAND
01.2021 - 07.2023

Project: Adani Super Thermal Power Plant Jharkhand Godda

Client: Adani Power Ltd

Project Cost: 24000 Cr

  • Attending weekly meetings with the client and ensuring all the planned quality activities are being implemented.
  • In depth knowledge of Turbine piping (IBR PIPING&NON-IBR PIPING) like HP&LP heater associate line, De super heater associate piping, Deaerator associate piping, turbine related drain line, INSULATION Turbine equipment &piping, erection & alignment of turbine &condenser, Chemical cleaning turbine piping system.
  • Carrying out the fabrication, erection & commissioning of OCCW piping, CCWW piping, Lube oil piping, Condensate storage tank piping, Gland steam system piping, DM water piping, Deaerator drain & vent piping, LP heater drain &vent piping, HP heater drain &vent piping, Compressor air piping, Raw water piping, Nitrogen air piping, fair fighting piping system, service water piping etc.
  • Carrying out the Erection of OCCW pumps, CCCW pumps, Make up pumps, Main oil tank (MOT), Jack oil pump, Turbine lube oil pumps, Turbine Driven Boiler Feed Water Pump (TDBFP), TDBFP Oil tanks, Motor Driven Boiler Feed Water Pump (MDBFP), MDBFP Booster pumps, Vacuum Pumps, Seal oil system, Condensate extraction Pumps, Generator stator cooler system, Generator hydrogen cooler etc.
  • Fabrication & Erection of CST (Condensate storage tank) and conduct Sand blasting and vacuum test for further approval.
  • Co-ordination and supervising in Erection of Hangers & Supports for all LP&HP Piping.
  • Knowledge of reading drawing (P&ID, PFD, VENDOR Drawing).
  • Notify the non-conformance identified during site inspection and recommended corrective -measures to Site In charge & HOD.
  • To ensure customer complaints related to quality are investigated and necessary corrective and -preventive actions are implemented.
  • Providing Technical Clarifications & Attending the project reviews as per agreed plan and schedule.
  • Day to day work planning and work distribution. Preparation of daily reports and documents.
  • Checking monthly bill of all contractors, Raised NCR OR PENALTY note to contractor.
  • Sending mail & letter to higher authorities or client.AS per client & senior officer required prepare all work-related document.

Sr. engineer piping project

TPSC (TOSIBA POWER SERVICE CORPORETION)
JHARSHUGUDA
02.2018 - 01.2021

Project: NTPC Darlipali Super Thermal Power Plant Jharsuguda

Client: NTPC / TJPS

Project Cost: 1800 Cr.

  • Attending weekly meetings with the client and ensuring all the planned quality activities are being implemented.
  • In depth knowledge of Turbine piping (IBR PIPING&NON-IBR PIPING) like HP&LP heater associate line, De super heater associate piping, Deaerator associate piping, turbine related drain line, INSULATION Turbine equipment &piping, erection & alignment of turbine &condenser, Chemical cleaning turbine piping system.
  • Carrying out the fabrication, erection & commissioning of OCCW piping, CCCW piping, Lube oil piping, Condensate storage tank piping, Gland steam system piping, DM water piping, Deaerator drain & vent piping, LP heater drain &vent piping, HP heater drain &vent piping, Compressor air piping, Raw water piping, Nitrogen air piping, fair fighting piping system, service water piping etc.
  • Carrying out the Erection of OCCW pumps, CCCW pumps, Make up pumps, Main oil tank (MOT), Jack oil pump, Turbine lube oil pumps, Turbine Driven Boiler Feed Water Pump (TDBFP), TDBFP Oil tanks, Motor Driven Boiler Feed Water Pump (MDBFP), MDBFP Booster pumps, Vacuum Pumps, Seal oil system, Condensate extraction Pumps, Generator stator cooler system, Generator hydrogen cooler etc.
  • Fabrication & Erection of CST (Condensate storage tank) and conduct Sand blasting and vacuum test for further approval.
  • Co-ordination and supervising in Erection of Hangers & Supports for all LP&HP Piping.
  • Knowledge of reading drawing (P&ID, PFD, VENDOR Drawing).
  • Notify the non-conformance identified during site inspection and recommended corrective -measures to Site In charge & HOD.
  • To ensure customer complaints related to quality are investigated and necessary corrective and -preventive actions are implemented.
  • Providing Technical Clarifications & Attending the project reviews as per agreed plan and schedule.
  • Day to day work planning and work distribution. Preparation of daily reports and documents.

Mechanical engineer project

Heurtey Petrochem India Pvt. Ltd
04.2017 - 02.2018

Project: Pour Vodadra Workshop

Client: Heurtey Petro Chem Pvt Ltd

Project Cost: 100 Cr

  • Attending weekly meetings with the client and ensuring all the planned quality activities are being implemented.
  • In depth knowledge of heater fabrication &piping (convection heater& radiant heater) like convection module, stack, round heater, piping, radiant module, ETS etc.
  • Preparation of pressure test packages system wise and coordination for pressure test, reinstatement, and proper follow up until mechanical clearance of the system.
  • Checking welding, visual &fitting activities.
  • Checking fabrication drawing.
  • Generating the requests and witnessing UT, RT, MPT and PT

Mechanical engineer project(Boiler erection & maintenance)

SEPCO-1 INDIA
08.2016 - 04.2017

Project: KSK Thermal Power Plant

Client: KSK Mahanadi Power Ventures Ltd

Project Cost: 18000 Cr

  • Coordination with project planning team for adequate material and effective manpower mobilization &resources for site start-up & supervision on installation & erection activities.
  • Knowledge of reading drawing (P&ID, PFD, VENDOR Drawing) & involve in erection of Boiler Drum, Header, super heater tube, re heater tube, Water wall Panel, roof tube, Back pass, Economizer etc.
  • Erection of LP & HP Lines from boiler to Turbine and successfully completed the all-respective hydro tests.
  • Successfully execute the hydro test boilers #3 (Generating Capacity 600MW)
  • Working in Boiler commissioning activities like the chemical cleaning and commence the light up process with CLIENT TEAM.
  • Monitoring & Control of sub-Contractor Manpower for smooth, safe, reliable & economic working environment.
  • Motivating the team for Smart performance by effective counseling / guidance.
  • Cross functional knowledge development in analyzing site Safety condition and aware the team members accordingly.
  • Maintaining healthy inter-departmental relations for smooth & safe operation & maintenance of Plant & Equipment.
  • Carry out the maintenance of Furnace Wall blower, long retractable soot blower and Motorized Operated valves, Motorized Control Damper etc.
  • Working As site Execution Engineer (Pressure Parts)
  • Erection of Boiler Pressure parts (Boiler Drum, Water walls, Risers, Down comers, Super heater coils & headers, RH coils & headers, Economizer coils & headers including their connecting pipes)
  • Erection of fuel burning system like Burners, oil guns and terminate the respective fuel oil piping station across the burner.
  • Alignment of Burners & Furnace diagonal and involved in the commissioning of the fuel burning mechanism.
  • Compete in the erection of long retractable soot blower, wall blower across the furnace and terminate the relevant piping with successful Hydro test.
  • Erect and commissioned the reserve boiler mountings the safety valve respective to Boiler drum, Main steam, CRH, HRH lines.
  • Executed the safety valve discharge piping.
  • Successfully execute the hydro test of two consecutive boilers (Capacity of 600MW each unit) &another boiler is processing.

Mechanical engineer (PIPING)

EASTEND TECHNOLOGIES PRIVATE LIMITED
11.2015 - 08.2016

Project: JSPL Angul

Client: JSPL

Project Cost: 50 Cr

  • Develop, implement, communicate, and maintain a quality plan to bring the Companies Quality Systems and Policies into compliance with quality system requirements.
  • To create, update and maintain the project specific EXECUTION reports.
  • Erection AG piping &UG piping.
  • Checking welding, visual& fit up of piping.

Mechanical engineer project

BENGAL TOOLS LTD
01.2014 - 07.2015

Project: IOCL Paradip

Client: IOCL

Project Cost: 700 Cr

  • Bengal Tools Ltd is a material handling project division, having an 800 TPH coke handling system project in Paradip, Indian Oil Corporation Ltd (OIL & GAS PLANT).
  • Bengal Tools ltd is a Material Handling project Division having 800TPH Coke handling System Project in Paradip Indian oil corporation ltd (OIL &GAS PLANT).
  • Looking after the Erection & alignment activity of all structural &non-Structural part.
  • Checking all pipe welding, DP test & IBR related job as well as other area.
  • Erection, alignment, testing of all motor, feeder breaker .ID fan, Rotary airlock valve Rotary feeder, pipe conveyer, DE System, Beg filter, Belt conveyer line, stacker etc.
  • I was involved in CHS commissioning activity, trail round commissioning & load commissioning (PG test).

Asst. QC Engineer /Execution engineer project

MANPREET ENGINEERING &CONST.CO
06.2010 - 01.2014

Project: FACOR Power Ltd

Client: Thaison Group India Industries Ltd

Project Cost: 1200 Cr

  • Facor power Ltd is a 2 x 50mw power plant situated in Bhadrak, Odisha, India Having 3x155 TPH boiler and 2x50mw Turbine-generator set. ThyssenKrupp India Ltd (TKII) was Awarded for Turnkey Project for boiler (Supply, Erection & Commissioning).
  • Looking after erection activities of all Boiler Pressure Parts and non-pressure parts.
  • Checking the quality of all IBR related jobs as well as in other areas.
  • Erection, alignment, Testing of all boiler PA, SA, ID fans.
  • Erection and alignment of Feeders, cyclone & Bed ash Cooler in boiler.
  • I was involved in boiler commissioning activities, Boiler Hydro test, Refractory dry out, Steam blowing etc.

Education

MBA - Project Management

Sikkim Skill University
Sikkim
01.2025

B. TECH - Mechanical Engineering

VIT, Balesore
Balesore
01.2014

DIPLOMA - MECHANICAL ENGINEERING

IGIT Sarang
Talechar
01.2010

NDT LEVEL-II - UT, RT, MPT & PT ASNT

ITIA Institute of Technology
Baidyabati,Hooghly

AUTOCAD (2D) - Design and Drawing

C.T.T.C (BHUBANESWAR)
Bhubaneswar, ODISHA

M S Project - Excel, Word & Power point

Nice Computer Academy
Bhadrakh, OR

Skills

  • Mechanical operations
  • Quality assurance
  • Equipment commissioning
  • Team collaboration
  • Technical supervision
  • Resource allocation

Languages

English
Proficient
C2
Hindi
Proficient
C2
Oriya
Proficient
C2

Hobbies and Interests

  • Travelling
  • Spending time in workshops
  • Photography

Personal Information

  • Passport Number: N1547888

Disclaimer

I consider myself with mechanical engineering aspects. I am also confident of my ability to work in a team. I hereby declare that the information furnished above is true to the best of my knowledge & belief.

Timeline

Sr. Mechanical Engineer

Tata consulting engineers
12.2024 - Current

Project Engineer

Tata Steel Ltd.
08.2023 - 11.2024

Sr. engineer piping project

SEPCO-III
01.2021 - 07.2023

Sr. engineer piping project

TPSC (TOSIBA POWER SERVICE CORPORETION)
02.2018 - 01.2021

Mechanical engineer project

Heurtey Petrochem India Pvt. Ltd
04.2017 - 02.2018

Mechanical engineer project(Boiler erection & maintenance)

SEPCO-1 INDIA
08.2016 - 04.2017

Mechanical engineer (PIPING)

EASTEND TECHNOLOGIES PRIVATE LIMITED
11.2015 - 08.2016

Mechanical engineer project

BENGAL TOOLS LTD
01.2014 - 07.2015

Asst. QC Engineer /Execution engineer project

MANPREET ENGINEERING &CONST.CO
06.2010 - 01.2014

MBA - Project Management

Sikkim Skill University

B. TECH - Mechanical Engineering

VIT, Balesore

DIPLOMA - MECHANICAL ENGINEERING

IGIT Sarang

NDT LEVEL-II - UT, RT, MPT & PT ASNT

ITIA Institute of Technology

AUTOCAD (2D) - Design and Drawing

C.T.T.C (BHUBANESWAR)

M S Project - Excel, Word & Power point

Nice Computer Academy