Summary
Overview
Work History
Education
Skills
Personal Information
Software
Timeline
Generic
SELVAKUMAR I

SELVAKUMAR I

Chengalpattu

Summary

Overall 13+ years of experience in leading Auto motive Industry. Handled more than 7 new model development projects Including major Auto OEM. Experience in good customer service orientation, Maturity of judgment under pressure, ability to diagnose Level of problem & develop appropriate solution. Good knowledge in Body construction and sheet metal welding process and welding inspection. Responsible for development and establishment of processes/equipment for new model launches in vehicle assembly shop which meeting Quality, cost& Delivery of project by performing digital studies & physical confirmation to ensure vehicle can be manufactured in mass production environment to meet Quality, workability, productivity &safety standards. Co-ordinate with CFT team [Quality, Maintenance, Manufacturing, Customer Support] and work towards continual improvement on quality and productivity. Analysis part variability with using part co-ordinate fixture (PCF & Aperture) measurement to improve quality level of products.

Overview

15
15
years of professional experience

Work History

Project Leed Sr Engineer

Thaisummit Auto Parts India Pvt Ltd
Chennai
2023.01 - Current

Project Feasibility study, BOM Preparation, New model schedule making, Drawing Feasibility study along with TSAI-CFT team, Process Setting Meeting, Production layout design preparation, Facility requirement (Robo/ Manual welding machine utilities), Gauge concept - Assy preparation, Gauge concept approval From Customer, Approved concept Share to suppliers, PPAP Document Prepare, IATF Internal Auditor (Certified)

Production Incharge -Rear Assembly

FORD INDIA Pvt Ltd.
Chennai
2018.08 - 2022.09
  • Process Allocation, Time & Motion Study, Lean manufacturing & Value stream Mapping
  • Designing Fixtures and Jigs for Error proofing
  • (To reduce Process man minutes, to improve Quality) Participated in Kaizen improvement activities to assure optimum productivity and costs
  • Suggests alternative designs, materials, or processes
  • Must be capable of resolving all problems while maintaining good rapport with customers and peers
  • Implementation of quality operating systems & quality review systems.

Project Leed Engineer

FORD INDIA Pvt Ltd.
Chennai
2016.03 - 2018.08
  • Benchmark study to improve design robustness of supplier parts Define & control CTQ, CTC parameters based on design review Vehicle level design study of parts @ early stage of design phase Fix tolerance & control factor thro’ reverse engineering process Failure mode analysis of BO parts through stack up study activity Create know-how stock for new members to learn and execute Validation of parts drawing for datum scheme & tolerance level Supplier gauge concept proposal, validation & approval of gauge Design quality requirement of parts for each phase wise of development process as per ANPQP & Engineering requirement Confirmation of parts quality at each stage of develop
  • Process

Production ASSOCIATE - LAUNCH

2012.12 - 2016.02
  • Study & confirm Part /Process assembly study from Conducting Joint Check for Each Milestone Study & Select suitable tools, jigs and Fixtures for Industrialization Phase Analyse Field related Concerns with take corrective action by problem solving Tools and protect end customer Experience in development of components in-line with the requirements of PPAP/ ANPQP & Engineering requirement Global BENCH MARKING for both Process & Products
  • Implement Product Engineering changes related to the BODYSHOP
  • Analyse Part variability with using Part Co-ordinate Fixture (PCF) Measurement to improve quality level of Body
  • Analyse Dimension level deviation with using CMM Measurement to improve quality level of body
  • Versatile in process PFMEA and CONTROL PLAN
  • Counter measure actions to fix the snags raised during pre-builds
  • Knowledge of AIM’S, Concern & Alert
  • Conducting Safety Risk Assessment for Design, Layouts and Process.

Production Associate - BODY Construction

2009.04 - 2012.11
  • Exposure in body engineering processes of UNDERBODY line
  • Expert with process flow station related to body shop and Assembly shop
  • Expert in sheet metal welding like Spot welding and MIG welding
  • Initiate and ensure release of Process sheet, Process flow diagram and QPS
  • Solving the Problem for line stoppage in Production Line
  • Innovate the new idea for Problem Solving & Mechanical Error Proofing
  • Achievement: Mechanical Error proof provided in base line to avoid two model Variant part mix up
  • Active participating in NWG to improve our quality and safety.

Education

Diploma in Mechanical engineering - undefined

MSPVL Polytechnic
Pavoorchatram, Tenkasi Dist.

HSE - undefined

PUNITHA ARULAPPAR Higher secondary school
Avudaiyanoor, Tenkasi (Dist.)

Skills

Knowledge in CATIA V5.

Personal Information

  • Passport Number: V4522669
  • Passport Expiry Date: 01/23/32
  • Date of Birth: 10/12/87
  • Gender: Male
  • Marital Status: Married

Software

CATIA V5 & NX cad

Timeline

Project Leed Sr Engineer

Thaisummit Auto Parts India Pvt Ltd
2023.01 - Current

Production Incharge -Rear Assembly

FORD INDIA Pvt Ltd.
2018.08 - 2022.09

Project Leed Engineer

FORD INDIA Pvt Ltd.
2016.03 - 2018.08

Production ASSOCIATE - LAUNCH

2012.12 - 2016.02

Production Associate - BODY Construction

2009.04 - 2012.11

Diploma in Mechanical engineering - undefined

MSPVL Polytechnic

HSE - undefined

PUNITHA ARULAPPAR Higher secondary school
SELVAKUMAR I