Summary
Overview
Work History
Education
Skills
Timeline
Generic

SERKAN ONDER

GEOLOGİCAL ENGINEER
İSTANBUL

Summary

In my 1 6 years of experience in various major complex and large scale construction projects including tunnelling, bridges and highways; I have developed and acquired necessary skills and knowledge in managing, planning and executing the required task in hand. Some of the highlights in my career includes excavation for multiple tunnelling projects in Turkey, Algeria and India; spanning a total tunnel length of 25 km. In addition to this, tunnel fortifications, insulation, final concrete lining, and more than 20 portal excavation, shaft excavations throughout my career. I have worked in all excavation classes and applied almost all tunnel fortification classes. I am looking for an opportunity to utilize my skills as a Geological Engineer to contribute to the growth of the organization.

Overview

17
17
years of professional experience

Work History

TECHNİCAL COUNSULTANT / NATM EXPERT

NAVAYUGA ENGINEERING COMPANY
08.2021 - Current

Construction of Tunnels, Bridges, Yard and Formation Works From

Chainage 33+097 to 47+360 (14.263 km) Under Pakage-3 in Connection

With New BG Line Between Rishikesh and Karnprayag (125 km) in State of Uttarakhand, india. (The tunnel T5 length under my responsibility is 9700 m. two tubes total length of excavation is more than 20000 m. including cross passages.)

EARTHWORKS CHIEF

POLAT YOL YAPI SAN.TIC.A.Ş.
11.2019 - 06.2021

I worked at Polatyol Construction Company in Kuwait for government road project (RA243). My aim was to gain new experiences in earthworks, highway roads and infrastructure projects. I have done large scale excavation, filling works, super-structure for bridge intersection construction and management planning.

Tunnels Chief

ATACAN AKSOY İNŞAAT
12.2017 - 10.2019

Project: Silifke / Mut / Ermenek Highway Tunnels Total 8000 m. double tube 5 sections tunnel. (I finished total length of 6000 m in my term.)

NATM CONSTRUCTION MANAGER

ALSiM - ALARKO HOLDiNG/ MGH GROUP
01.2016 - 11.2017

Mahmutbey - Mecidiyekoy metro project, which has a length of 24.5 kilometers and consists of 19 stations and the distance between the start and end stops will be covered in 26 minutes. I worked as a Besiktas station construction chief. I did 35 m. deep shaft excavation and curvet/slopes stair tunnel excavation around 1500 m. in sand strata, near by the Marmara Sea at under the sea level.

TUNNELS CHİEF

OZGUN CONSTRUCTION COMPANY
01.2012 - 03.2016

Ozgun Construction is a leading company ofKRK Holding, operates in fields of tunnelling, transportation, infrastructure, superstructure, mining, and energy. Soner Temel Engineering (STM) is among the leading Tunnelling and Infrastructure contractors in Turkey.

Responsibilities: Worked at Marmaray Project (Istanbul) as a Tunnel Engineer and Geotechnical Engineer. Marmaray Project is one of the most important project of the world due to connect Asia and Europe from below the sea. This experience let me learn how to deal with water in my tunnel excavations. Towards end of the project, I moved to Algeria with the same company for the below projects.

- Tiziouzu Oued Aissi Fast Train Project (1701 m.) — NATM Tunnel Engineer

- Bejai La Gorge RN43 Highway Tunnel (3 tunnels - 880 m. / 635 m. 268 m.) — NATM Tunnel Chief

TUNNEL ENGINEER

AS-YOL CONSTRUCTION COMPANY
07.2008 - 01.2012

Responsibilities: Worked as a site - NATM tunnel engineer, following up all tunnel excavation, fortification and insulation. I generated database and prepared design accordingly. While working in this project, I have gained geotechnical experience; coordinating subsurface geotechnical site investigations including geological mapping, test pits, borehole logging, soil and rock sampling, geophysics, and laboratory testing. Projects:

Salmankas Tunnel is a road tunnel project in north-eastern Turkey. It was built to bypass the Salmankas Pass Tunnel lenght 4000m. (Altitude 8000 ft), which is on the ancient Silk Road.

Education

Bachelor of Science - Geological Engineering

AKSARAY UNIVERSITY FACULTY OF ENGINEERING
TURKEY
04.2001 -

Skills

    -Earthworks

    -NATM Tunnel engineering

    *Highway tunnels (13000 m)

    *Subway tunnels (2000 m)

    *High speed rail line tunnel(10700m )

Timeline

TECHNİCAL COUNSULTANT / NATM EXPERT

NAVAYUGA ENGINEERING COMPANY
08.2021 - Current

EARTHWORKS CHIEF

POLAT YOL YAPI SAN.TIC.A.Ş.
11.2019 - 06.2021

Tunnels Chief

ATACAN AKSOY İNŞAAT
12.2017 - 10.2019

NATM CONSTRUCTION MANAGER

ALSiM - ALARKO HOLDiNG/ MGH GROUP
01.2016 - 11.2017

TUNNELS CHİEF

OZGUN CONSTRUCTION COMPANY
01.2012 - 03.2016

TUNNEL ENGINEER

AS-YOL CONSTRUCTION COMPANY
07.2008 - 01.2012

Bachelor of Science - Geological Engineering

AKSARAY UNIVERSITY FACULTY OF ENGINEERING
04.2001 -
SERKAN ONDERGEOLOGİCAL ENGINEER