Safety-focused occupational health professional with 20 years of experience. Qualified TRANSITIONAL SAFETY PRACTITIONER with solid background in designing and implementing procedures to minimize and mitigate worker risk. Investigative and analytical carrying out inspections with superb attention to detail. NEBOSH trained.
Scope of Work: Residue Fluid Catalytic Cracking (RFCC)
ADNOC - TAR VILLAGE
Scope Of Work : ADNOC Waste Heat Recovery Project - Project No : 6143
Engineering,Procurement,Construction,Commissioning & Stat-up (EPC) Works.
Scope Of Work : (KUWAIT MINISTRY OF HEALTH)
State of the art multi-disciplined hospital, which is part of Kuwait’s major upgrade of the public health care system. It is located on a site area of around 88,000 m² and has an overall built up area of about SIZE OF PROJECT: 265,000 m².
Scope Of Work : 20 Km - 6 Inch diameter Pipe lines connected from 25 wellheads and 16 Inch diameter pipeline 20 km connected with live Pipe Lines
Scope Of Work: Entire Operation and Maintenance Works
Scope of Work : 200MW - 132 Wind Turbines had erected at AANIKADAVU Site, TN,India.
Scope Of Work : New Factory Construction Projects Site 1,2&3
Scope Of work : The 185 MW Natural Gas base power plant project is located at Ramanathapuram, Tamil Nadu, in southern India .