Summary
Overview
Work History
Education
Skills
Technical References
Languages
Personal Information
Timeline
Generic

SHA SAGIR MOHAMED

Bangalore

Summary

  • Elite Hospitality Construction Specialist with 20+ years delivering five-star hotel projects (Hilton, Marriott) and landmark structures across India and the Middle East
  • Proven high-rise expert with specialized knowledge in luxury hotel construction, including post-tensioned slabs, MEP coordination, and premium finishes
  • Hands-on project leader who has: Managed twin 35-floor hotel towers (Jabal Omar Hilton/Marriott) Executed 4 basement levels + 22 typical floors with precision Coordinated architectural finishes for 5-star standards
  • Quality execution specialist with expertise in: Hospitality-grade construction (marble, joinery, acoustic treatments) Fast-track methodologies achieving 96-hour floor cycles Luxury MEP integration for guest room comfort systems
  • Multilingual project conductor (English C2, Hindi/Urdu C1, Arabic A1) bridging international brands (Marriott/Hilton) with local execution teams

Overview

18
18
years of professional experience

Work History

Construction Consultant

Self-Employed Construction Consultant
Mysore & Bangalore
02.2020 - Current

Project Scope:
Self-managed execution of multiple residential buildings (G+3) in Bangalore and Mysore, overseeing end-to-end project delivery including planning, budgeting, design coordination, execution, and client interaction.

Key Responsibilities:

  • Independently planned, managed, and executed multiple G+3 residential building projects from foundation to handover.
  • Prepared structural layout, coordinated architectural designs, and ensured alignment with local building codes and bye-laws.
  • Handled quantity estimation, BOQ preparation, material procurement, and vendor negotiations for all civil and finishing works.
  • Supervised and directed site activities including RCC work, masonry, plastering, waterproofing, and interior finishing.
  • Managed and coordinated subcontractors, skilled labor, and site teams to ensure on-time and cost-effective project execution.
  • Liaised with clients, architects, and municipal authorities for approvals, inspections, and documentation.
  • Ensured quality control and safety compliance throughout the construction phases by implementing standard practices.
  • Prepared and monitored project schedules, cost reports, and cash flow projections.

Key Achievements:

  • Successfully completed [insert number] G+3 residential buildings, maintaining high quality standards and client satisfaction.
  • Reduced overall construction cost by effective material planning and contractor management without compromising on quality.
  • Built a trusted client base and received repeat contracts based on performance and timely delivery.

Project Civil Engineer

Beaver Gulf Contracting LLC
Deira Waterfront Development
02.2019 - 01.2020

Project: Deira Waterfront Development – Mixed-Use Urban Development
Client: Investment Corporation of Dubai (ICD)
Master Developer: ITHRA Dubai
Architectural Consultant: DAR
Project Manager: Turner International Middle East

Project Overview:
A landmark urban revitalization project in the heart of Deira, Dubai, encompassing high-rise residential and commercial buildings, podiums, retail spaces, and waterfront infrastructure, aimed at transforming the area into a world-class destination.

Key Responsibilities:

  • Supervised day-to-day site activities for structural and architectural works including foundations, columns, slabs, blockwork, and finishing stages.
  • Coordinated with consultants (DAR) and project managers (Turner) for approvals, RFIs, and resolving technical discrepancies.
  • Ensured execution of works as per IFC drawings, specifications, method statements, and Dubai Municipality (DM) regulations.
  • Managed subcontractors and site workforce, monitored productivity, and maintained quality and safety compliance.
  • Assisted in planning and scheduling activities with the site planning team, ensuring milestones were met within deadlines.
  • Verified and monitored material quantities, ensured timely availability on site, and reduced wastage through efficient planning.
  • Participated in inspections and ensured proper documentation (IRs, MIRs, NCRs) in line with QA/QC protocols.
  • Coordinated MEP and civil interfaces during critical construction phases like podium slabs, shaft works, and core wall zones.

Key Achievements:

  • Delivered structural works for [Zone 5 and 6] within the planned schedule and with minimal rework.
  • Improved coordination between MEP and civil teams by proactively identifying clash points and resolving them at the planning stage.
  • Achieved site progress targets in a high-pressure, fast-track environment overseen by international project management standards.

Project Civil Engineer

Nesma & Partners
King Abdullah Children's Hospital
07.2014 - 11.2018

Project: King Abdullah Specialized Children Hospital
Client: Saudi Arabian National Guard Health Affairs
Consultant: M/s Dar Al Hadassah
Location: King Abdullah Medical City, Jeddah

Project Overview:
A state-of-the-art pediatric hospital within King Abdullah Medical City, focused on delivering specialized healthcare services with advanced medical infrastructure, built to international healthcare standards.

Key Responsibilities:

  • Supervised structural and architectural works across designated zones, ensuring compliance with project specifications and timelines.
  • Interpreted IFC drawings, and coordinated with consultants to resolve technical discrepancies or RFIs.
  • Managed subcontractor activities and daily work allocation, ensuring that safety and quality standards were met on site.
  • Conducted inspections in collaboration with QA/QC teams to ensure adherence to international healthcare facility standards.
  • Maintained project documentation, including method statements, inspection requests (IRs), and material submittals.
  • Liaised with MEP teams and consultants for interface coordination to avoid service clashes, and ensure smooth progress.

Civil Site Engineer

Nesma & Partners
Jabal Omar Hilton / Marriott Towers
02.2011 - 06.2014

Project: Jabal Omar Hilton/Marriott Towers – High-Rise Hotel and Commercial Complex
Location: Makkah, Kingdom of Saudi Arabia

Project Overview:
A landmark multi-tower development consisting of high-rise luxury hotels (Hilton & Marriott), retail spaces, and podium structures, designed to serve Hajj and Umrah pilgrims with world-class facilities.

Key Responsibilities:

  • Executed civil and structural works including raft foundations, columns, slabs, shear walls, and core wall construction for high-rise towers.
  • Supervised daily site activities, coordinated with subcontractors and labor teams to ensure compliance with approved drawings, specifications, and safety standards.
  • Reviewed shop drawings and IFC documents; raised RFIs and worked with the design and consultant teams to resolve site-related discrepancies.
  • Conducted quality checks on concrete works, rebar placement, formwork, and finishing activities in accordance with project specifications and international standards.
  • Managed concrete pouring activities, coordinated with batching plants, and ensured proper curing and strength testing procedures were followed.
  • Prepared daily progress reports, monitored manpower and materials usage, and ensured smooth execution to meet project timelines.
  • Liaised with MEP and façade teams for interface coordination in congested zones of tower and podium construction.

Key Achievements:

  • Successfully delivered structural works in [specify tower/block/podium/zone] ahead of schedule with zero major NCRs (Non-Conformance Reports).
  • Improved site productivity by optimizing work sequencing and minimizing rework through proactive coordination.
  • Contributed to safe execution in a high-risk, high-density construction zone adjacent to the Holy Mosque area.

Project Engineer

MS Prestige Estates Private Limited
Bangalore
12.2006 - 12.2010

Prestige Group – Notting Hill Project, Kalena Agrahara

Project Description:
A premium residential development by Prestige Group, located in Kalena Agrahara, Bangalore, consisting of 4.7 acres, 5 residential towers, and a blend of modern amenities.

Key Responsibilities:

  • Managed G+14 floors (5 towers)
  • Supervised and coordinated day-to-day on-site construction activities to ensure timely and quality execution of structural and finishing works.
  • Reviewed and interpreted structural and architectural drawings, ensuring compliance with design specifications and standards.
  • Managed and monitored subcontractors, labor deployment, material deliveries, and machinery utilization on-site.
  • Collaborated with architects, consultants, and project managers to resolve technical issues and ensure project alignment.
  • Maintained quality control by conducting regular inspections, and ensuring adherence to safety protocols and IS codes.

Education

Diploma - Civil Engineering

CPC Govt Polytechnic
Mysore
01.2003

Skills

  • High-rise RCC (IS 456:2000, ACI 318-19)
  • Post-tensioned slabs (PTI standards)
  • Composite steel-concrete structures (AISC 360)
  • Aluminum formwork systems
  • Jet grouting and diaphragm walls (D-Wall)
  • AutoCAD Civil 3D 2024
  • MS Project

Technical References

  • IS 456:2000 (Indian Concrete Code)
  • BS 8110 (British Structural Standards)
  • UAE Fire & Life Safety Code (2018 Edition)

Languages

English
First Language
Hindi
Proficient (C2)
C2
Urdu
Proficient (C2)
C2
Arabic
Beginner (A1)
A1

Personal Information

  • Passport Number: Indian Passport:S2413357
  • Date of Birth: 06/07/1977

Timeline

Construction Consultant

Self-Employed Construction Consultant
02.2020 - Current

Project Civil Engineer

Beaver Gulf Contracting LLC
02.2019 - 01.2020

Project Civil Engineer

Nesma & Partners
07.2014 - 11.2018

Civil Site Engineer

Nesma & Partners
02.2011 - 06.2014

Project Engineer

MS Prestige Estates Private Limited
12.2006 - 12.2010

Diploma - Civil Engineering

CPC Govt Polytechnic
SHA SAGIR MOHAMED