Sr. Manager

M/s CDS INFRA PROJECTS. Ltd
06.2019 - Current
  • Eight Lane Expressway Starting At Ch.
  • 47+000 Near Khanpur Ghati and Ends at Haryana-Rajasthan Border (Km 47+000 To Km 78+800) Section of Delhi – Vadodara Green Field Alignment (NH148N) total 32 k.m.
  • Cost of projects is 780 cr.
  • New alignment with construction of new bridge, retaining wall, LVUP etc.

Sr. Manager

M/s CDS INFRA PROJECTS PVT. Ltd
03.2017 - 06.2019
  • Four laning Balance Work for Bhopal – Biaora Section of NH-12 from Mubarakpur to Biaora from Km 324.000 to Km 423.400 (Package-II) in the State of MP on EPC Mode.
  • Cost of projects is 511 cr.
  • Strengthening and widening of exiting two lane with construction of new bridge, retaining wall, VUP etc.

Sr. Manager mechanical

M/s Centrodorstroy (India) Pvt. Ltd
08.2015 - 03.2017
  • Construction of 4 lane zirakpur- patiala NH – 64 Road project total 22 k.m.
  • Cost of projects is 309 cr.
  • Strengthening and widening of exiting two lane with construction of new bridge, retaining wall, ROB etc.

M/s Centrodorstroy (India) Pvt. Ltd
09.2011 - 07.2015
  • Designation: - Manager mechanical.
  • Construction of 2/4 Kanpur- kabrai NH – 86 Road project total 59.8 k.m.
  • Cost of projects is 149.8 cr.
  • Strengthening and widening of exiting two lane with construction of new bridge, retaining wall, ROB etc.
  • M/s Centrodorstroy (India) Pvt.
  • Ltd.
  • (jan’11 to aug’11) Designation: - Manager mechanical.
  • Construction of 2/4 lane sohana-ballabhgarh-pali-bhakari road project & gurgaon-faridabad-crusher zone-mcf road project total Length 66.6 1k.m.
  • Cost of projects is 238.1 cr.
  • (Client – Reliance infra ltd.).

Asst. Manager

M/s Centrodorstroy (India) Pvt. Ltd
04.2009 - 12.2010
  • State highway in Haryana hodal-nuh- Pataudi - patauda road project KM 0.00 TO 96.8 km.
  • Cost of projects is 239.8 cr.
  • Funded by HSRDC., (Aug-07 to april-09) State highway Punjab, firozpur to zira & Zira to Dharamkot.
  • Total 59.16 KM cost of projects is 150 cr.
  • Funded by World Bank.

Sr. Engineer

M/s D.S.CONSTRUCTION LTD
08.2006 - 07.2007
  • One of the most prominent projects planned on private sector participation on BOT basis, the 27.7 kms Delhi-Gurgaon Expressway is a 6 to 8-lane expressway built on NH-8.
  • Serving as a lifeline for commuters between Delhi and Gurgaon, and to the domestic and international airports, it is one of the busiest corridors in the country and provides access to over 1 million commuters every day.
  • The 32-lane toll plaza at KM 24 is the largest toll plaza in Asia and the second largest in the world.
  • It is Indias first state-of-the-art urban expressway comparable to any global expressway project in terms of tolling technology, construction quality, commuter safety and convenience.
  • The unique lighting system used on the expressway is the first of its kind in India.

Sr. engineer

M/s Mukand ltd
07.2001 - 10.2006
  • Third National Highway Project NH2 Package 3c.
  • K.m 245 to k.m.
  • 317 (Total 72 km) Varanasi, U.P project cost is 300 crore rupees, World Bank funded project four laning.
  • Strengthening and widening of exiting two lanes with construction of new bridge, retaining wall and service road also.
  • DESIGNATION : - Mechanical Engineer.
  • Responsibilities and Achievements.
  • To maintain continuously records of equipment productivity, operating cost, maintenance cost, spares availability and inventory level, breakdown hours, etc.
  • Erection and commissioning of 125 TPH GSB crusher plant.
  • Supplied by Laxmi Engineering Works New Delhi.
  • Installing & commissioning of D.G.
  • 7.5 K.V.A to 500 K.V.A.
  • Attend mechanical fault.
  • Installing & commissioning of new equipment i.e.
  • Tandem roller, soil compactor, paver, excavator, transit mixer, Backhoe loader, wheal loader, compressor, boiler PTR etc.
  • W.
  • Preventive & breakdown, predictive maintenance of wheal loader, grader, excavator,Dg set, concrete pump, pavers, Backhoe loader , Tipper.
  • Soil compactor.
  • Tandom roller, PTR, Tower light, air compressor,boom pleasure etc.
  • W.
  • Erection, commissioning & maintenance of 30 m3 ot 240 m³ batching plant (make DMI,Schwing stetter,maxocreate, etc).
  • Maintenance & supervising of hot mix plant capacity 120 TPH to 320 TPH (make DMI,Apollo,lintec ,Huatong,Marini etc ).
  • Maintenance & supervising of 3 x 60,000 Liter water, chilling plant, Supplied by Frick India Ltd, Delhi.
  • Maintenance & supervising of SP 94 concrete paver supplied by writgen group, Germany.

Education

Metric -

M.P. Board of education

Intermediate - undefined

M.P. board of education

Diploma - Mechanical Engineering

technical board of Karnataka

Skills

Sr Manager Mechanical

undefined

Accomplishments

  • I, undersigned certified that to the best of my knowledge and belief, these date correctly describe by my qualification and experience.
  • Date:-Place :-Zirakpur – Patiala Road Project.(Punjab) (Shah M.
  • Ansari) 2 Curriculum vitae Marketing Executive 4.

Timeline

Sr. Manager

M/s CDS INFRA PROJECTS. Ltd
06.2019 - Current

Sr. Manager

M/s CDS INFRA PROJECTS PVT. Ltd
03.2017 - 06.2019

Sr. Manager mechanical

M/s Centrodorstroy (India) Pvt. Ltd
08.2015 - 03.2017

M/s Centrodorstroy (India) Pvt. Ltd
09.2011 - 07.2015

Asst. Manager

M/s Centrodorstroy (India) Pvt. Ltd
04.2009 - 12.2010

Sr. Engineer

M/s D.S.CONSTRUCTION LTD
08.2006 - 07.2007

Sr. engineer

M/s Mukand ltd
07.2001 - 10.2006

Metric -

M.P. Board of education

Intermediate - undefined

M.P. board of education

Diploma - Mechanical Engineering

technical board of Karnataka
Shah Md ansari.