Work History
Sr. Manager
M/s CDS INFRA PROJECTS. Ltd
06.2019 - Current
Eight Lane Expressway Starting At Ch.
47+000 Near Khanpur Ghati and Ends at Haryana-Rajasthan Border (Km 47+000 To Km 78+800) Section of Delhi – Vadodara Green Field Alignment (NH148N) total 32 k.m.
Cost of projects is 780 cr.
New alignment with construction of new bridge, retaining wall, LVUP etc.
Sr. Manager
M/s CDS INFRA PROJECTS PVT. Ltd
03.2017 - 06.2019
Four laning Balance Work for Bhopal – Biaora Section of NH-12 from Mubarakpur to Biaora from Km 324.000 to Km 423.400 (Package-II) in the State of MP on EPC Mode.
Cost of projects is 511 cr.
Strengthening and widening of exiting two lane with construction of new bridge, retaining wall, VUP etc.
Sr. Manager mechanical
M/s Centrodorstroy (India) Pvt. Ltd
08.2015 - 03.2017
Construction of 4 lane zirakpur- patiala NH – 64 Road project total 22 k.m.
Cost of projects is 309 cr.
Strengthening and widening of exiting two lane with construction of new bridge, retaining wall, ROB etc.
M/s Centrodorstroy (India) Pvt. Ltd
09.2011 - 07.2015
Designation: - Manager mechanical.
Construction of 2/4 Kanpur- kabrai NH – 86 Road project total 59.8 k.m.
Cost of projects is 149.8 cr.
Strengthening and widening of exiting two lane with construction of new bridge, retaining wall, ROB etc.
M/s Centrodorstroy (India) Pvt.
Ltd.
(jan’11 to aug’11)
Designation: - Manager mechanical.
Construction of 2/4 lane sohana-ballabhgarh-pali-bhakari road project & gurgaon-faridabad-crusher zone-mcf road project total Length 66.6 1k.m.
Cost of projects is 238.1 cr.
(Client – Reliance infra ltd.).
Asst. Manager
M/s Centrodorstroy (India) Pvt. Ltd
04.2009 - 12.2010
State highway in Haryana hodal-nuh- Pataudi - patauda road project KM 0.00 TO 96.8 km.
Cost of projects is 239.8 cr.
Funded by HSRDC., (Aug-07 to april-09)
State highway Punjab, firozpur to zira & Zira to Dharamkot.
Total 59.16 KM cost of projects is 150 cr.
Funded by World Bank.
Sr. Engineer
M/s D.S.CONSTRUCTION LTD
08.2006 - 07.2007
One of the most prominent projects planned on private sector participation on BOT basis, the 27.7 kms Delhi-Gurgaon Expressway is a 6 to 8-lane expressway built on NH-8.
Serving as a lifeline for commuters between Delhi and Gurgaon, and to the domestic and international airports, it is one of the busiest corridors in the country and provides access to over 1 million commuters every day.
The 32-lane toll plaza at KM 24 is the largest toll plaza in Asia and the second largest in the world.
It is Indias first state-of-the-art urban expressway comparable to any global expressway project in terms of tolling technology, construction quality, commuter safety and convenience.
The unique lighting system used on the expressway is the first of its kind in India.
Sr. engineer
M/s Mukand ltd
07.2001 - 10.2006
Third National Highway Project NH2 Package 3c.
K.m 245 to k.m.
317 (Total 72 km) Varanasi, U.P project cost is 300 crore rupees, World Bank funded project four laning.
Strengthening and widening of exiting two lanes with construction of new bridge, retaining wall and service road also.
DESIGNATION : - Mechanical Engineer.
Responsibilities and Achievements.
To maintain continuously records of equipment productivity, operating cost, maintenance cost, spares availability and inventory level, breakdown hours, etc.
Erection and commissioning of 125 TPH GSB crusher plant.
Supplied by Laxmi Engineering Works New Delhi.
Installing & commissioning of D.G.
7.5 K.V.A to 500 K.V.A.
Attend mechanical fault.
Installing & commissioning of new equipment i.e.
Tandem roller, soil compactor, paver, excavator, transit mixer, Backhoe loader, wheal loader, compressor, boiler PTR etc.