Offering strong background in engineering with focus on problem-solving and team collaboration. Knowledgeable about project management, technical analysis, and innovative thinking. Ready to use and develop leadership, communication, and analytical skills in Management role.
Execution of OHE Foundation Activity Works. • Finished Placing of Mast Erection. • Grouting Activities. • Assembly TTC and Boom Erection. • Drop Arm Erection, Bracket Erection, Bracket Adjustments, Isolator Erection. • Stringing of Centenary & Contact Conductor. • Transfer of OHE • Isolator Erection • PTFE erection • Super mast Erection and Stringing of Feeder Conductor. • Anti-Creep wire Erection, Counter Weight, and ATD Checking. • SED (Structure Erection Drawing) with Tower Wagon activities. • Erection, testing and commissioning of 10KV,25KV AT’S • Plan and Supervised Over Head Equipment Erection. • As an engineer to Speed up and control the Working from Supervisor of Foundation and OHE Activities. • Railway Co-ordination and • Execute with Safety Precaution during the main line Blocks.
Execution of OHE Foundation Activity Works. • Finished Placing of Mast Erection. • Grouting Activities. • Assembly TTC and Boom Erection. • Drop Arm Erection, Bracket Erection, Bracket Adjustments, Isolator Erection. • Stringing of Centenary & Contact Conductor. • Transfer of OHE • Isolator Erection • PTFE erection • Super mast Erection and Stringing of Feeder Conductor. • Anti-Creep wire Erection, Counter Weight, and ATD Checking. • SED (Structure Erection Drawing) with Tower Wagon activities. • Erection, testing and commissioning of 10KV,25KV AT’S • Plan and Supervised Over Head Equipment Erection. • As an engineer to Speed up and control the Working from Supervisor of Foundation and OHE Activities. • Railway Co-ordination and • Execute with Safety Precaution during the main line Blocks.
SP & SSP marking and survey • Execution of PSI Foundation Activity Works. • Finished Placing of Mast Erection. Name of the work: New SSP/SPs along with modification at existing SSP/SPs in view of Proposed 3rd line between RGPM to WL Client: Railway Construction(SCR) • Grouting ActivitiesSuper mast Erection and Stringing of Conductor. Feeder • Stringing of X-feeder and jumpering. • Cable laying & termination of Transformer bays • Structural Assembly • CT,PT and LA’s Testing and Erection. • CB,BM and AT’s Testing and Erection • Fencing fabrication and Erection • Bonding and Earthing • Buried rail Erection • Single and double pole Isolator Erection
Foot survey for pegging plans preparation (taking CESS levels, implantations &Permanent • Execution of OHE Foundation Activity Works. • Preparation of daily, weekly and monthly progress reports
1,Advance Diploma in Computer Application &Multilingual DTP
2,Railway Locomotive Air Breaking System
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience. I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.
Date:
Place: