Seasoned Civil Engineering and Infrastructure Delivery Leader with 25+ years of experience managing and supervising complex, large-scale public infrastructure projects across Qatar, Oman, and India. Specialized in resident engineering, construction supervision, and contract administration for roads and highways, major interchanges, bridges, tunnels, airports, and integrated utility networks. Proven expertise delivering high-value government and master-planned developments involving multi-package and multi-interface programs. Extensive experience with advanced construction methods including micro-tunneling, deep shaft construction, MSE wall systems, steel arch structures, cable-stayed and suspension bridges, and large-span reinforced concrete structures. Strong background in airport airside infrastructure including runways, taxiways, aprons, airfield ground lighting, drainage, earthworks, and utilities in compliance with international aviation standards. Recognized for leading multidisciplinary teams, coordinating with clients, authorities, consultants, and contractors, and enforcing contractual, quality, safety, and regulatory compliance in live operational environments.
Key Projects: LUSAIL Development Primary Infrastructure Construction & Transfer Packages | Client: Qatari DIAR (LUSAIL Real Estate Development Company) | Aggregate Projects Value: QAR 8.0 billion, Project planning monitoring & progress based on prima vera (P6)
• Acted as Resident Engineer for multiple primary infrastructure construction packages within LUSAIL City, exercising site authority and contract administration responsibilities across a multi packages CP3A2 CP3A3 CP7A-1C CP7C-1B CP4B & CP01 C1, C2, C3
• CP3A2 Oversaw construction of major bridge infrastructure under including five reinforced concrete bridges within QETAIFAN Islands and two steel suspension bridges linking the mainland to the islands, with suspension bridge pylons reaching 41 m in height and deck spans of 204 m and 186 m, alongside concrete bridge spans ranging from 119 m to 218 m, ensuring compliance with design intent, sequencing, and marine interface requirements. Project cost (QAR 2 billion) duration 30 months
• CP3A3 Supervised delivery of iconic pedestrian bridge works comprising two dual pylon cable stayed bridges with 60 m pylon to pylon spans, incorporating approach water features, pumping rooms, foul sewer and potable water services at kiosks, and fully controllable architectural lighting systems integrated with public realm works. Project cost (QAR 0.8 billion) duration 18 months
• CP7A-1C roadway and structure works including major roads, WADI Bridge, LRT Bridge, retaining and quay walls, and associated wet and dry utilities, coordinating bridge illumination systems, road safety installations, Project cost (QAR 0.9 billion) duration 21 months Project planning and monitoring the progress based on prima vera (P6)
• CP7C-1B commercial boulevard developments and multi-level underground car parks spanning basement levels 2 to 5, ensuring structural coordination, traffic integration, and utility servicing were executed in line with approved designs. Project cost (QAR 1.5 billion, duration 24 months)
• CP4B Multi zone infrastructure Project covering Junctions 12 13 and 14, Marina Interchange works, Marina Underpass, 420 m multi-lane Marina Bridge, 184 m steel Marina Arch, Southern Interchange flyover, cut and cover tunnels, underpasses, ramps, and approximately 1 km of MSE walls, together with integrated district cooling gas storm water TSE and electrical networks across Zones 1 to 4, Deep Storm Water (Micro-Tunneling Works): work with a approx. Total tunnel length of 4695m of that 2400mm dia. is 2488m and 3000mm dia. is 2206m, total Shafts 15nos. Plus one temporary shaft for connection to pumping station Project cost (QAR 1.6 billion , duration 30 months)
• CP01 C1 C2 and C3 involving road works and associated services across three distinct areas within LUSAIL City, supervising staged execution of approximately 1.6 km of roads in C1, 450 m in C2, and 550 m in C3, together with design and construction of four 11 kV substations to support permanent utility commissioning. Project cost (QAR 0.4 billion, duration 15 months)
large-scale residential water infrastructure systems, overseeing piping networks, pumping stations, storage tanks, plumbing, and fire protection systems to ensure technical compliance, reliability, and on-time delivery
Resident Engineering & Client Representation
Infrastructure & Mega Project Delivery
Roads, Highways & Interchanges
Bridges (RC, Steel, Cable-Stayed, Suspension)
Tunnels & Micro-Tunneling Works
Storm Water & Drainage Systems
Airport & Airside Infrastructure
Contract Administration (FIDIC)
Utility & Interface Integration Management
Design Review & Technical Assurance
QA/QC, HSE & Regulatory Compliance
Construction Execution Strategy
Change & Variation Management
Performance Monitoring & Reporting
Transport & Airport Infrastructure Leadership
Contractor Performance Management