Summary
Overview
Work History
Education
Skills
Certification
Declaration
Timeline
Generic
SARIFUL ISLAM SHAIKH

SARIFUL ISLAM SHAIKH

SR. SURVEY ENGINEER
Burdwan

Summary

Senior Survey Engineer seeking roles in Project Site Management, AutoCAD, Total station, Management Surveying, Client Relationship, site Coordination

SENIOR SURVEY ENGINEER A) Organize survey team and re-establish reference points B) Verify Control Points and Setting Out C) Set-out measurement control system D) Project Reports, daily Dairies and Manuals E) Revise plans, documents, specifications, and issue instructions F) All type of survey work related Road/Highway , Railway, and Major Bridge projects. 1) Plan & profile design as per site condition 2) Road/Metro/Railway Alignment design as per site condition 3) Auto cad drawings 4) Contour drawings 5) survey report checking surveying data quality 6) Calculation of coordinate and bearing, staff reading, check drawings. 7) Proper layout and topography as per given coordinate 8) Maintain approved drawings & records. Layout marking as par given coordinates & site condition. Maintaining complete records of levels at site. Topographical surveying by tachometric process 9) Proper layout checking as per approved drawings.

Overview

2
2
Certifications
15
15
years of professional experience

Work History

METRO PROJECT

AFCONS INFRASTRUCTURE LIMITED
05.2023 - Current

Additional Scope: Construction of loops and ramps for road flyover at Central Silk Board Junction with an approximate length of 2.84 km.

· Establishment and maintenance of survey control points using GPS, Total Station and Digital Level.

· Survey and alignment works for viaduct, stations, loops and ramps.

· As-built survey, pier and deck slab monitoring.

· Coordination with client, design and construction teams.

· Preparation of survey reports and AutoCAD drawings.

  • Self-motivated, with a strong sense of personal responsibility.
  • Worked effectively in fast-paced environments.
  • Skilled at working independently and collaboratively in a team environment.
  • Proven ability to learn quickly and adapt to new situations.

RAIL PROJECT

APURVAKRITI INFRASTRUCTURE PVT LTD
10.2021 - Current
  • All survey work related roadbed and Rail track , layout of culvert, minor and major foundation and super structure , OGL Recording and level checking of subgrade , blanket material , blast and rail top.
  • Close Traverse of all controlpoints and elevated metro by GPS and Total Station for Co-Ordinate and digital Level for elevation.
  • PQC centerline markings
  • Auto cad drawings
  • To handle total station
  • Stake out
  • Auto cad drawings / survey report
  • Proper B.m carry by auto level.
  • Calculation of coordinate and bearing, staff reading, check drawings.
  • Proper layout and topography as per given coordinate
  • Maintain approved drawings & records. Layout marking as par given coordinate & site condition. Maintaining complete records of levels at site.
  • Topographical surveying by tachometric process
  • Proper layout checking as per approved drawings.
  • Client: ADANI
  • Project: Railway Track, Bulk Silo, Ware House, Retaining wall, & Laying, R.C.C. Road.Earth work in excavation / forming Embankment , GSB- WMM/BDM/BITUMINOUS WORKS , CEMENT CONCRETE WORK (PQC)

METRO PROJECT

SIMPLEX INFRASTRUCTURE
01.2019 - 10.2021
  • Close Traverse of all control points of and elevated metro by GPS and Total Station for Co-Ordinate and digital Level for elevation.
  • Responsible for Segment alignment and match cast segment for SPAN and EJ segment.
  • 750 m Precast yard for Gantry Crain track alignment of 5nos BAY of Casting Mould Segment.
  • Responsible for Shot Line and Long line Mould, Survey towers, Gantry shatter alignment, foundation of gantry column bolt etc. work.
  • Also responsible for arranging the data import and export for survey work and Segment by MC3D Software for every Sand alone and Match Cast segment.
  • Communication with design section and section In-charge for next planning and its implementation as per schedule instructed by junior surveyors
  • Client: RVNL
  • Project: METRO PROJECT

ROAD PROJECT

GANNON DUNKERLEY & CO.,LTD
09.2015 - 01.2019
  • IN-CHARGE WITH THE USE AND RECORDING OF THE MAJOR SURVEY INSTRUMENT UTILIZED IN THE FIELD.
  • ORGANIZING AND MAINTAINING FIELD SURVEYOR TEAMS
  • PROVIDING DATA FOR MONTHLY PROGRESS REPORTS IN CONNECTION WITH CONTRACTORS CLAIM FOR PAYMENT.
  • ESTABLISHMENT OF HORIZONTAL AND VERTICAL CONTROL POINTS FOR FIXED REFERENCE USING GPS OR SOKKIA CX10 TOTAL STATION.
  • TOPOGRAPHICAL SURVEYING BY TACHOMETRIC PROCESS
  • PLAN & PROFILE DESIGN AS PER SITE CONDITION.
  • ROAD ALIGNMENT DESIGN AS PER SITE CONDITION
  • CONTOUR DRAWINGS
  • LAYOUT AND TOPOGRAPHY AS PER GIVEN COORDINATE
  • PROFILE AND CROSS SECTIONING OF AREAS COVERED BY SITE CONSTRUCTION AREA TO DETERMINEPORTION TO BE CUT OR FILL FOR PREPARATION OF MONTHLY PROGRESS ACCOMPLISHMENT FORMONTHLY PROGRESS BILLING.
  • LAY-OUT AND SETTING OUT OF VERTICAL AND HORIZONTAL ALIGNMENT OF CONCRETE BRIDGE.
  • PLOTTING OF DATA USING AUTOCAD 2D,AUTOCAD 3D, E SURVEY SOFTWARE
  • ESTABLISHMENT OF HORIZONTAL AND VERTICAL CONTROL POINTS FOR FIXED REFERENCE USING TOTALSTATION AND AUTOMATIC LEVEL.
  • SETTING OUT REQUIRED VERTICAL ELEVATION FOR ALL ARCHITECTURAL FINISHING.
  • CHECKING THE CROSS SECTION FOR AS BUILT DRAWING
  • PERFORM VERIFICATION SURVEY.
  • Client: MPRDC
  • Project: Rehabilitation and up gradation from existing Km22/8 Km to 89/6 of NH-12A Barela- Mandla) in the State of Madhya Pradesh on EPC Mode.

ROAD PROJECT

J.KUMAR INFRAPROJECT LIMITED
03.2013 - 09.2015
  • Bridge points stake out
  • Road centerline markings
  • Auto cad drawings
  • To handle total station ( pentax r422n )
  • Stake out
  • Pilening points
  • Footing & column points
  • All building & tank stake out
  • Auto cad drawings / survey report Proper b.m carry by auto level.
  • Proper b.m error calculation & adjustment.
  • Calculation of coordinate and bearing, staff reading, check drawings.
  • Proper layout and topography as per given coordinate Maintain approved drawings & records.
  • Layout marking as par given coordinate & site condition.
  • Proper layout checking as per approved drawings.
  • T.s surveying by all usual method at plane & hill area.
  • Proper layout and topography as per given coordinate
  • Client: PWD
  • Project: Sion Panvel express way Pqc road Ch. (126+350 to 140+630) an Bridge project 6 lane sanpada flyovers of 660m (130+570 to131+230

ROAD PROJECT

IVRCL LIMITED
08.2011 - 03.2013
  • Making of road centerline (total station)
  • Fixing the t.b.m. and correction
  • Making of different layers of earthworks like- cutting & grading, embankment , Makings medians, side shoulder, side drains, median drains etc.
  • Emb layer, s/g layer, gsb layer
  • Laying of wmm , dbm , bc
  • Rfi
  • Construction of culverts
  • Find the quantity earthwork
  • Fixing the t.b.m. and correction
  • All type of road work like
  • To handle total station (sokkia 330/) instrument.
  • To handle total station (laika tc 402) instrument
  • Client: PWD
  • Project: Design, enginering, finance, construction, operation and Maintenance chandrapur maharashtra from km 81 msh 7 in The state of maharashtraunder nhdp phase-iii a on build, operate and transfer 4 lane road projec (bot) basis.

Education

Diploma - Survey

West Ben Survey Institute
West Bengal
01.2011

10+2 - undefined

Intermediate Council West Bengal
01.2006

10th - undefined

West Bengal School Examination Board Burdwan
01.2004

Skills

Land Surveyor

AutoCAD

Senior Survey Engineer

Theodolite

Total station

Site Management

Grading

Certification

MS OFFICE

Declaration

I hereby declare that all the information mentioned in this resume are true, complete and correct to the best of my knowledge and belief and i bear the responsibility for the correctness of the above-mentioned particulars.

Timeline

METRO PROJECT

AFCONS INFRASTRUCTURE LIMITED
05.2023 - Current

RAIL PROJECT

APURVAKRITI INFRASTRUCTURE PVT LTD
10.2021 - Current

METRO PROJECT

SIMPLEX INFRASTRUCTURE
01.2019 - 10.2021

ROAD PROJECT

GANNON DUNKERLEY & CO.,LTD
09.2015 - 01.2019

ROAD PROJECT

J.KUMAR INFRAPROJECT LIMITED
03.2013 - 09.2015

ROAD PROJECT

IVRCL LIMITED
08.2011 - 03.2013

10th - undefined

West Bengal School Examination Board Burdwan

10+2 - undefined

Intermediate Council West Bengal

Diploma - Survey

West Ben Survey Institute
SARIFUL ISLAM SHAIKHSR. SURVEY ENGINEER