Summary
Overview
Work History
Education
Skills
Certification
Previous Experience
Training
Personal Information
Timeline
Generic
Neelesh Pathak

Neelesh Pathak

DGM C&I Thermal Power Project
Jharsuguda

Summary

A result-oriented professional with over 17 plus years of experience in large size coal power plants O&M, Erection and Commissioning. Presently associated with Steag Energy Services as DGM (C&I maintenance) at Vedanta Jharsuguda.

Pursuing full-time role that presents professional challenges and leverages interpersonal skills, effective time management, and problem-solving expertise.

Overview

17
17
years of professional experience
1
1
Certification
2
2
Languages

Work History

DGM C&I

Steag Energy Services
10.2017 - Current
  • Company Overview: Project under Steag TSPL Mansa Punjab 3X660MW Vedanta Aluminum Ltd
  • IPP/CPP 4X600MW
  • O&M of 3X660MW(TSPL) & 4X600 MW(VAL)
  • Lead the R&M, COH & AOH for TSPL and Jharsuguda from C&I dept
  • Handled critical module of VSAP (Vedanta Sustainable Framework)
  • Active Participation in Development and Implementation for SOP/SMP, Isolation/LOTO, PTW, HIRADEC, Work at Height, Confined Space, Lifting Tools, MOC etc
  • Asset Optimization audit and compliance as module honor of SPM (Spare Part Management) and Digitalization Module
  • RCA and Implementation of Tripping Recommendation for enhancing reliability
  • Spares inventory Management, Development of Indigenous spares
  • Budget preparation, Manpower management, Subcontractor and AMC as required
  • Annual overhaul planning & execution
  • Knowledge and Trouble Shooting of DCS system of FOXBORO (I/A series 8.3), Invensys, Different PLC UPS system, ETS, TSI, HP&LP Bypass System etc
  • Working Knowledge of DCS, BENTLEY NEVADA, SHINKAWA VIBRATION ANALYSIS system
  • On hand experience of Main turbine and TDBFP TSI instrument installation
  • Maintenance and Servicing of Critical Hydraulic Units like HP-LP Bypass Block, Turbine and TDBFP Trip Block, Auto Tension Device of Bottom Scrapper Chain Conveyor etc
  • Review of newer technologies and its adoption
  • Safety meetings and seminars for departmental staff to ensure, establish and maintain safety to achieve target of zero accident
  • Monitor contractors and direct them to perform timely completion of work with quality
  • Interface with other departments for better PLF, heat rate, SOC, SCC, APC and other important goals
  • Evaluate & categories critical and insurance spares
  • Project under Steag TSPL Mansa Punjab 3X660MW Vedanta Aluminum Ltd
  • IPP/CPP 4X600MW

Manager (Control & Instrumentation)

Reliance Power Ltd
09.2014 - 10.2017
  • Company Overview: 6X660 MW, UMPP, SASAN, SINGRAULI, MP
  • Commissioning and O&M
  • O&M of running Units of Island -II i.e
  • Unit 4,5 and 6 which includes Manpower Management
  • Day to day maintenance activity, Spare Management, Tripping Analysis and Modification, Logic Review to enhance plant availability, Vendor Development to meet out emergency needs, AMC Management, SOP and SMP Preparation and implementation, long term Maintenance Strategy to optimize maintenance cost, reduce inventory cost and at the same time increase plant availability, Internal Training and development of team members to meet out emergency and day to day problems
  • RCA and Implementation of Tripping Recommendation for enhancing reliability
  • Spares inventory Management, Development of Indigenous spares
  • Budget preparation, Manpower management, Subcontractor and AMC as required
  • Annual overhaul planning & execution
  • 6X660 MW, UMPP, SASAN, SINGRAULI, MP

Sr. Executive, (Control & Instrumentation)

L&T–MHI Power Boilers Private Limited
12.2012 - 09.2014
  • Company Overview: A 51:49 Joint Venture between Larsen & Toubro Limited (L&T), India and Mitsubishi Power, Ltd., Japan (MPW)
  • Erection planning / supervision and commissioning of super critical boiler of Jaypee Nigiri (2X660)
  • On-site vendor coordination & modification in system as per site requirement
  • Member of project progress review team for smooth & speedy completion of project
  • Material & manpower management for uninterrupted progress
  • Coordination & involvement in basic engineering review of P&ID, IO Allocation, Logics, and Instrument installation drawings
  • Responsible for satisfactory erection and commissioning of plant I&C systems in Boiler and auxiliaries
  • Testing, commissioning & charging of UPS & Battery Chargers
  • Fully responsible for commissioning of BMS/BPS
  • Monitoring & execution of Project activities to complete within schedule time
  • Optimization of control system for all the units
  • A 51:49 Joint Venture between Larsen & Toubro Limited (L&T), India and Mitsubishi Power, Ltd., Japan (MPW)

Sr. Executive, Project & O&M (Control & Instrumentation)

Lanco Anpara Power Limited
09.2008 - 12.2012
  • Company Overview: Sonebhadra
  • Worked in the 2X600 MW Green field Thermal Power Plant Project and O&M
  • Mainly involved in the Erection and Commissioning of both Units
  • Responsible for basic, detailed engineering, FAT, Erecting and Commissioning of DCS (FOXBORO) for Station DDCMIS
  • Responsible for Burner Management System
  • Responsible for TSI (Bentley Nevada)
  • Responsible for calibration, erection & commissioning of various field instruments at Boiler and Turbine
  • Responsible for developing Cable Schedules, FCT, Job Schedule, Project Schedule, Job Planning, Coordination with Vendors, cabling of above DCS, BOP PLC and other field panels etc
  • Responsible for analysis and review, comments preparation of documents like P & IDs, Logics related to BTG Packages
  • Responsible for preparing various draft specifications of different packages including Station DDCMIS
  • Analysis and Review of P & ID’s and document submitted by supplier, DEC for the BTG package
  • Sonebhadra

Education

BE - Electronics & Communication

Technocrats institute of technology

Diploma - Electronics & Communication

Jabalpur

Higher Secondary - undefined

MP Higher Secondary Education

10th - undefined

MP Higher Secondary Education

Skills

    Team-oriented collaboration

    Effective decision-making

    Friendly, positive attitude

    Team management

    Time management

    Flexible and adaptable

    Microsoft office

    Problem-solving

Certification

Power Plant Familiarization, National Power Training Institute (NPTI), Neyveli, Tamil Nadu, 2008

Previous Experience

  • Reliance Power Ltd, Manager (Control & Instrumentation), 09/01/14, 10/01/17, Commissioning and O&M of running Units of Island -II i.e. unit 4,5 and 6 which includes Manpower Management., Day to day maintenance activity, Spare Management, Tripping Analysis and Modification, Logic Review to enhance plant availability., Vendor Development to meet out emergency needs, AMC Management, SOP and SMP Preparation and implementation., Long term Maintenance Strategy to optimize maintenance cost, reduce inventory cost and at the same time increase plant availability., Internal Training and development of team members to meet out emergency and day to day problems., RCA and Implementation of Tripping Recommendation for enhancing reliability., Spares inventory Management, Development of Indigenous spares., Budget preparation, Manpower management, Subcontractor and AMC as required., Annual overhaul planning & execution.
  • L&T–MHI Power Boilers Private Limited, Sr. Executive, (Control & Instrumentation), 12/01/12, 09/01/14, Erection planning / supervision and commissioning of super critical boiler of Jaypee Nigiri (2X660)., On-site vendor coordination & modification in system as per site requirement., Member of project progress review team for smooth & speedy completion of project., Material & manpower management for uninterrupted progress., Coordination & involvement in basic engineering review of P&ID, IO Allocation, Logics, and Instrument installation drawings., Responsible for satisfactory erection and commissioning of plant I&C systems in Boiler and auxiliaries., Testing, commissioning & charging of UPS & Battery Chargers., Fully responsible for commissioning of BMS/BPS., Monitoring & execution of Project activities to complete within schedule time., Optimization of control system for all the units.
  • Lanco Anpara Power Limited, Sr. Executive, Project & O&M (Control & Instrumentation), 09/01/08, 12/01/12, Worked in the 2X600 MW Green field Thermal Power Plant Project and O&M., Responsible for basic, detailed engineering, FAT, Erecting and Commissioning of DCS (FOXBORO) for Station DDCMIS., Responsible for Burner Management System., Responsible for TSI (Bentley Nevada)., Responsible for calibration, erection & commissioning of various field instruments at Boiler and Turbine., Responsible for developing Cable Schedules, FCT, Job Schedule, Project Schedule, Job Planning, Coordination with Vendors, cabling of above DCS, BOP PLC and other field panels etc., Responsible for analysis and review, comments preparation of documents like P & IDs, Logics related to BTG Packages., Responsible for preparing various draft specifications of different packages including Station DDCMIS., Analysis and Review of P & ID’s and document submitted by supplier, DEC for the BTG package.

Training

  • NPTI Nayeli, Power plant familiarization, 14 weeks
  • Schneider Electric, Invensys, India (Chennai), I/A System (ICC, IACC, Archestra, Wonderware Historian, Trident etc.), 2 weeks

Personal Information

  • Total Experience: 17 Years
  • Date of Birth: 06/02/84
  • Marital Status: Married

Timeline

DGM C&I

Steag Energy Services
10.2017 - Current

Manager (Control & Instrumentation)

Reliance Power Ltd
09.2014 - 10.2017

Sr. Executive, (Control & Instrumentation)

L&T–MHI Power Boilers Private Limited
12.2012 - 09.2014

Sr. Executive, Project & O&M (Control & Instrumentation)

Lanco Anpara Power Limited
09.2008 - 12.2012

Diploma - Electronics & Communication

Jabalpur

Higher Secondary - undefined

MP Higher Secondary Education

10th - undefined

MP Higher Secondary Education

BE - Electronics & Communication

Technocrats institute of technology
Neelesh PathakDGM C&I Thermal Power Project