Summary
Overview
Work History
Education
Skills
Certification
LANGUAGES
LINKS
Timeline
Generic
Shameer Ahamed Allabaksh

Shameer Ahamed Allabaksh

Senior Project Engineer
Kallakurichi

Summary

Dynamic and results-oriented Project Engineer with over 12 years of experience leading multifaceted engineering projects in diverse sectors including Oil and Gas, Petrochemical, and Waste Management. Proven expertise in package management, overseeing the entire project lifecycle from design and procurement to construction and commissioning. Consistently delivers projects on time and within budget. Strategic thinker with a talent for problem-solving and optimizing project performance across international locations.

Overview

14
14
years of professional experience
1
1
Certification

Work History

Project Engineer (Package Manager)

Tialoc Singapore Pvt. Ltd
03.2022 - Current

Project: ECO Carbon Soot Incineration Plant

Client: ECO Special Waste Management(Singapore)

Consultant: Ramboll (Singapore)

Project: Waste To Energy facility Project

Client: Mo-Bruk, Poland

Consultant: AB Industry / Q Energy, Poland

Project: Industrial Waste Treatment Facility Phase2

Client: Be’ah HWM, Oman

Consultant: Renardet- HERA JV, Oman

Responsibilities:

  • Spear headed package Management for Southeast Asia’s largest incinerator waste treatment project, boasting a daily processing capacity of480 tons of carbon soot from the oil and gas sector at ECO SWM Site, singapore
  • Design, Procurement, Construction and Commissioning of Key packages involved - Incineration system, Waste Feeding System, Flue Gas Treatment system, Reagent Dosing System, Liquid waste system and Utilities
  • Oversaw development of Project execution plan and Project Schedule for contractors to comply with timeline
  • Developed RFQs, detailed scope of work, and comprehensive project deliverables, ensuring alignment with technical and contractual standards
  • Evaluation of technical proposals, contractor selection, and negotiations for offers, variation orders, and payment claims
  • Improved project timelines by reducing approval cycles from10 days to5 days, leading to a30% faster execution phase
  • Improved project efficiency by optimizing resources, reducing downtime by30%, and achieving $300K in cost savings
  • Identified and resolved project issues in the commissioning of Waste To Energy facility Project at Mobruk site - Poland, minimizing their impact on progress aiding in successful completion of project
  • Facilitated Change Management plan for ECO Project resulting in the successful completion of the project even with many encountered risks and issues
  • Led a multidisciplinary team to resolve critical delays, saving $150K in penalties and completing the project10 days ahead of deadline
  • Overcame welding and material compatibility challenges during the installation of pressure vessels by collaborating with materials engineers at ECO Project and ensuring compliance with ASME Section VIII standards
  • Managed technical challenges during the installation of compressors by collaborating with OEM vendors, implementing advanced troubleshooting techniques, and ensuring successful commissioning
  • Diagnosed and resolved foundation discrepancies during the installation of static equipment at ECO Project, avoiding $250K in potential rework costs and maintaining the project schedule
  • Achieved Performance testing of both Waste Management Projects at ECO (Singapore) and Mobruk (Poland) by involving in Pre-commissioning, Commissioning, trial run/Start-up of the Plant

Project Engineer (Package Manager)

UTOC Engineering Pvt. Ltd
04.2019 - 03.2022

PROJECTS:

Thermal Gas Unit Turnaround(PU-1)-TGDTA/PROJECT

Ethylene Cracking Complex(PU-5) - ECC PROJECT/TA

High Vacuum Unit (HVU-PU2/PU-4) - HVS PROJECT/TA

Hydro Cracking Unit (HCU - PU1) - HCU PROJECT/TA

SCOT UNIT (PU-1/PU-6) - SCOT PROJECT/TA

At Shell- SEPL Refinery

CLIENT: Shell Eastern Petroleum Ltd, Pulau Bukom - Singapore

Methionine Complex (Me5) - Evonik TA (Evonik Industries)

CLIENT: EVONIK Industries, Singapore.

Responsibilities:

  • Managed a diverse portfolio of oil and gas projects in downstream sector
  • Led Package management for the ECC, HVU and HCU Projects including critical equipment like furnace, Heat Exchangers, Process vessels and distillation columns
  • Oversaw Procurement,fabrication activities, and coordinated workforce for TGD and SCOT Projects in a factory setting
  • Mitigated site-specific challenges in the installation of static equipment by optimizing foundation designs and coordinating with cross-functional teams to adapt to environmental and space constraints
  • Led project planning and execution phases, from design inception to on-site execution, acceptance, and handover
  • Streamlined communication between stakeholders, reducing decision-making time by25% and ensuring timely project milestones
  • Accelerated project delivery by10%, completing a $5M pipeline installation two weeks ahead of schedule
  • Overcame flow instability issues in piping system design, ensuring compliance with ASME B31.3 standards and reducing pressure drop by25%
  • Overcame material compatibility issues for pressure vessels and piping systems, ensuring compliance with ASME standards and reducing project delays by25%
  • Developed Fabrication/Welding Specification, Shop and Field- Testing Specification, Insulation/Painting Specification, technical Supply Conditions / Requirements
  • Negotiated vendor contracts, resulting in a20% reduction in procurement costs and a savings of $250K for the project
  • Facilitated seamless client coordination across head office and construction sites, adeptly allocating resources, and workforce for site erection
  • Implemented risk management strategies to mitigate project risks and ensure safety and environmental compliance
  • Provided technical expertise throughout all phases of the project, ensuring accurate execution of designs and specifications.
  • Maintained records for each project and engineering discipline.
  • Achieved project milestones and delivered projects on time and within budget, exceeding client expectations

Project Engineer

Gulf Spic General Trading and Contracting WLL
09.2016 - 09.2018

PROJECT: MAB Refinery Expansion – Clean Fuels Project (CFP - KNPC)

CLIENT: Fluor-Daewoo-Hyundai JV (FDH JV), Kuwait

PMC: AMEC - Foster Wheeler

PROJECT: EPC & Commissioning of Molten Sulphur Handling Facilities Project (KMSHFP)

CLIENT: Kuwait National Petroleum Company (KNPC), Kuwait

Responsibilities :

  • Package Management involving full project life cycle right from design phase to commissioning phase
  • Executed the projects and provide guidance,directives to team members ensuring successful completion of the project
  • Provided the technical and project management oversight to the design, construction, pre-commissioning, commissioning, startup of facilities, and close out
  • Facilitated Project development by performing engineering studies, vendor selection, technical bid reviews, preliminary engineering, detailed design
  • Ensured timely resolution of project issues arising in all phases of the project development without deviation from project safety standards
  • Optimized resource allocation, reducing overhead costs by12% across all project phases
  • Streamlined design review processes, eliminating rework and saving $100K in engineering costs
  • Overcame technical challenges at Clean Fuels Project regarding the Piping Installation and testing by implementing alternate techniques pro actively, reducing the cost and time invested
  • Developed and executed corrective measures for flange leakage during commissioning of heat exchangers, achieving zero defects and reducing commissioning time by10%
  • Overcame flow instability issues in piping system design, ensuring compliance with ASME B31.3 standards and reducing pressure drop by25%
  • Implemented advanced laser alignment techniques for rotating equipment, cutting installation time by30% and increasing equipment lifespan by20% at MSHF Project

Piping Engineer

Alpan Consulting Engineers Pvt. Ltd.
10.2014 - 08.2016

PROJECT : Engineering Services for Clean Fuels Project(Kuwait), Revamp of LPG, Petrochemical feed stock facilities at Manali Refinery(India)


CLIENT : CSG / PSC JV , Hyundai Heavy Industries ( HHI ) (Kuwait), Chennai Petroleum Corporation limited (CPCL, India)


Responsibilities:

  • Contributed to the piping design of a $20M oil and gas facility, delivering detailed engineering packages within schedule and budget
  • Prepared material specifications for piping systems, selecting cost-effective materials while meeting pressure and temperature requirements
  • Collaborated with procurement teams to source piping materials, reducing procurement lead time by10%
  • Managed supplier relationships and ensuring timely delivery of materials to meet project schedules
  • Ensured piping designs adhered to ASME B31.3, B31.1, and API570 standards, achieving100% compliance in audits
  • Worked closely with process, mechanical, and civil engineering teams to ensure seamless integration of piping systems with other equipment and structures
  • Conducted safety audits and inspections to identify and mitigate potential hazards associated with piping activities
  • Liaised with vendors and contractors to review piping drawings and resolve technical queries, ensuring timely project execution
  • Designed compact piping layouts for space-constrained facilities, reducing project costs by $100K through efficient use of materials
  • Coordinated with fabrication teams to ensure piping designs were accurately translated into spool drawings, reducing rework by12%
  • Documented as-built changes and ensuring final documentation is comprehensive and accessible for future reference

Project Engineer

Wipro EDS
07.2011 - 03.2014

PROJECT : Engineering Services for Reliance Jamnagar refinery and BPCL refinery Projects

CLIENT : Fluor Corporation (Delhi, India)

Responsibilities:

  • Selected piping materials for high-temperature and corrosive environments, reducing project costs by12% while meeting API and ASTM standards
  • Standardized piping components and materials across projects, achieving a20% reduction in procurement lead times
  • Reviewed and approved piping designs for compliance with project specifications and industry codes, avoiding delays during fabrication
  • Implemented Piping and Instrumentation Diagram (P&ID) updates using Smart Plant, ensuring100% alignment with client requirements
  • Addressed pipe routing challenges in constrained spaces, achieving optimal layouts and reducing construction costs by $100K
  • Reviewed vendor documentation and technical specifications to ensure compliance with design requirements and quality standards
  • Orchestrated technical evaluations and selection of equipment and materials suppliers
  • Managed interfaces between piping systems and other project components, such as equipment, structures, electrical systems, and instrumentation
  • Optimized piping routes to minimize pressure drops and energy losses, resulting in a5% improvement in system efficiency
  • Resolved clash detection issues in piping systems during the3D modeling stage, reducing construction delays by30%
  • Maintained specific records and documentation throughout the design process, including as-built documentation and final design packages

Education

Bachelor of Engineering - Mechatronics

Anna University
Kongu Engineering College
06.2011

Skills

  • Project management
  • Quality control
  • Work Planning and Prioritization
  • Problem Solving
  • Estimating and bidding
  • Cost management
  • Health and safety compliance
  • Attention to detail
  • Resource budgeting
  • Stakeholder Engagement
  • Change Management
  • Technology Adoption
  • Subcontracting management
  • Analytical thinking
  • Office365
  • MS Project
  • AutoCAD
  • Navis works
  • CAESAR II
  • CADworx

Certification

  • Sep2024 — Oct2024 Project Management Professional Training Program
  • Sep2024 — Sep2025 Member of Project Management Institute, Project Management Institute
  • May2023 Apply Workplace Safety and Health in Construction Sites
  • Jan2022 Supervise Work in Confined Space Operation
  • Dec2021 Manage Work at Height
  • Dec2020 Workplace Safety and Health Management in Chemical, Process, Pharmaceutical Industries and Laboratories
  • Jun2018 First Aid Training
  • Feb2018 Fire Watch Training
  • Mar2015 Primavera P6 Training
  • May2010 Diploma in CAD

LANGUAGES

Tamil
Bilingual or Proficient (C2)
English
Bilingual or Proficient (C2)
Hindi
Advanced (C1)
Arabic
Elementary (A2)

LINKS

linkedin.com/in/shameer18

Timeline

Project Engineer (Package Manager)

Tialoc Singapore Pvt. Ltd
03.2022 - Current

Project Engineer (Package Manager)

UTOC Engineering Pvt. Ltd
04.2019 - 03.2022

Project Engineer

Gulf Spic General Trading and Contracting WLL
09.2016 - 09.2018

Piping Engineer

Alpan Consulting Engineers Pvt. Ltd.
10.2014 - 08.2016

Project Engineer

Wipro EDS
07.2011 - 03.2014

Bachelor of Engineering - Mechatronics

Anna University
Shameer Ahamed AllabakshSenior Project Engineer