Summary
Overview
Work History
Education
Skills
Key Qualifications
Educationandprofessionalstatus
Membership
Supplementaryinformation
Languagecapability
Specialisation
Positioningroup
Personal Information
Software
Certification
Timeline
Generic

SHANKAR GUNJI

Summary

Dedicated hydrology and hydraulics professional with 15 years of comprehensive experience in water resource management and infrastructure projects. Proficient in conducting Rainfall-Runoff studies, Flood frequency analysis, and dependable yield calculations, with a strong focus on reservoir simulation and sedimentation analysis. Skilled in designing flood estimation for various hydraulic structures, including dams, spillways, bridges, and storm drains, while also managing storm drainage and flood management studies for urban and highway projects.

Experienced in feasibility studies, detailed designs, and project execution of water infrastructure initiatives, with a proven track record in hydraulic and shore protection structures, flood protection works, and power potential studies for hydroelectric projects. Adept at highway alignment studies, technical specifications, and conducting topographical and hydrographical surveys. Possesses strong project management and contract management skills, including BOQ estimation, rate analysis, project cost estimates, and preparation of bid documents. Familiar with national and international standards such as BS, CIRIA, and IRC, and well-versed in ADB guidelines. Committed to delivering high-quality results and contributing to sustainable water management solutions.

Overview

23
23
years of professional experience
2022
2022
years of post-secondary education
1
1
Certification
3
3
Languages

Work History

Associate Principal Engineer (Hydrologist, Disaster Climate Change Specialist)

Louis Berger Consulting Pvt. Ltd
05.2024 - Current
  • Name of the Assignment or Project: PMC Services for Climate Resilient Reconstruction After Flooding in Kerala (30 Highway Projects 730km).

Hydraulic Engineer/Deputy General Manager

04.2024 - 11.2024
  • Name of the Assignment or Project: Authority Engineer for Construction of Major Bridges over river Subansiri at Ghunasuti with Approaches and Pagladiya with road connecting Kumarikata and Nayabasti on EPC mode
  • Month and

Deputy General Manager

NAC, GMR
04.2023 - 04.2024
  • Activities Performed: Responsible for fixing the road alignment for Greenfield projects, Inventories, Hydrologic surveys, identifying the natural drainage path through desk studies, Site visit to the project sites to access the condition of existing cross drainage structures and drainage requirements of the project
  • Rainfall analysis, Delineation of Catchment areas up to the bridge and culvert sites, Estimation of design discharge for design return period up to the proposed sites using various methods, fixing the waterway for bridges, Floor protection works
  • Planning and design of Road drainage works (Side drains, median drains, inlets etc.) and protection works along the project length, Design of Rainwater harvesting pit, Preparation of Hydrologic and Hydraulic reports and detailed project reports and construction drawings
  • Preparation of schedules for the contract document, Attending the Technical meeting with the client and MoRTH for obtaining necessary approvals
  • Name of the Assignment or Project: Pre-Bid Assistance for bid preparation regarding EPC Contract for “Design and Construction of Light Rail System from Reduit to St Pierre and Cote D’Or region'' - for extension of the Mauritius Metro Express Project (Phase-IV) in the Republic of Mauritius
  • Month, Main Project Features: Project Length: 8, 0 km / Project Cost - INR 26.88 crore

Civil Engineer, Chartered Engineer

Vidyut Nigam limited
04.2022 - 04.2024
  • In Ukimath, Rudraprayag District, Uttaranchal
  • Review of hydraulic calculations for the hydraulic components involved in three small hydroelectric schemes
  • Hydraulic calculations for power channel, desilting tanks, Head race tunnel which conveys water through gravity, fixing the full supply level and forebay tank
  • Coordinating with the design consultants for the changes in the scheme and follow up with the designs of the components and reviewing the design calculations provided by the consultants
  • Preparing daily, monthly and half yearly progress reports, planning the construction activities in advance, quantity estimation form construction drawings for three projects
  • Preparation of monthly RA Bills at project site office and coordinate with the client in clearing the bills and technical issues, quantity certification and verifying the contractor bill for payment
  • Monitoring the progress of tunnel of 3.5m diameter ‘D’ shaped and regular visits to tunnelling works and monitoring tunnel audit works
  • Responsible for preparing escalation bill for the three hydro projects located in Uttaranchal
  • Membership
  • Associate Member of “The Institution of Engineers

Hydrologist/Disaster and Climate

Sheladia Associates Inc
02.2018 - 04.2024
  • Main features of Project: Overall Project Management that go beyond the inherent tasks of the Supervision Consultants
  • Positions Held:, Change specialist
  • Activities performed: Carrying out Design review of the Hydrologic and Hydraulic designs for Bridges, culverts and Storm drainage works, Design Audit of contractor design documents & drawings, conducting the quality audit of drainage works at project site, Contract management, reviewing the consultants’ recommendations regarding the drainage and slope protection works, project management and coordinating, facilitating the client KSTP and KFW (funding agency) in all the technical aspects of the project
  • Carrying out site visit every quarter for all the project roads for reviewing the drainage works executed at site
  • Design of cross drainage structures and storm drainage network as per the site requirements
  • Coordinate with the supervision consultant, contractor for executing the works as per the contract and updated drawings
  • Reviewing the maintenance manuals prepared by the contractor and consultants, reviewing the consultants design documents for Vulnerability studies and innovative materials for Highways
  • Carrying out design of drainage works for various other infrastructure as when required from the Head office and preparing the technical reports and drainage audit reports for client submission.

Republic of Mauritius, Rail Vikas Nigam Limited
01.2023 - 05.2023
  • RVNL)
  • Main Project Features: Design and Construction of Light rail system

Hydraulic Engineer

MORTH
02.2018 - 01.2023
  • Activities Performed: Responsible for Hydrologic surveys, identifying the natural drainage path through desk studies, Rainfall analysis, Delineation of Catchment areas up to the bridge and culvert sites, Estimation of design discharge for design return period up to the proposed sites using various methods, fixing the waterway for bridges
  • Planning and design of road drainage works (Side drains, median drains, inlets etc.) and protection works along the project length, preparation of hydrologic and hydraulic reports and feasibility project reports
  • Name of the Assignment or Project: Consultancy Services for Preparation of Detailed Project Report of selected stretches/corridors of National Highways for up gradation to 2/4/6 lane with paved shoulder configuration in the state of Telangana: Junction at Hyderabad Ring Road (Gatkesar – Edulapur) – Valigonda – Thorrur – Nellikuduru – Mahabubabad – Yellandu – Kothagudem Junction at NH-30: Length: 234 Km, NH-935P
  • Month and, Govt
  • Of India
  • Main Project Features: Project Length: 234 km; 2/4/6 Lane/ Project Cost - INR 1552 Crores

Hydraulic Engineer

Tamil Nadu
05.2021 - 10.2022
  • Activities Performed: Visiting the site for assessing the site conditions and to know the existing Light rail transit system in operation, meeting various vendors, stakeholders, preparing the site visit report, preliminary design methodology and calculations, preparation of technical submittals for submission of bid
  • Name of the Assignment or Project: Consultancy Services for Detailed Design of “Upgrading of Cheyyur-Vandavasi-Polur Road (SH-115) from Km 1+620 to km 106+246 and ECR Link (ODR) Cheyyur – Panayur Road from km 0+000 to km 4+647 to two lane with paved shoulders in the State of Tamil Nadu
  • Month and Year:

Odisha
01.2022 - 05.2022
  • Main Project Features: Elevated road in Elephant corridor

Hydraulic Engineer/DGM

Millennium Challenge Corporation
12.2021 - 03.2022
  • Activities Performed: Responsible for Hydrologic surveys, identifying the natural drainage path through desk studies, Site visit to the project sites to access the condition of existing cross drainage structures and drainage requirements of the project
  • Rainfall analysis, Delineation of Catchment areas up to the bridge and culvert sites, Estimation of design discharge for design return period up to the proposed sites using various methods, fixing the waterway for bridges, Floor protection works
  • Planning and design of Road drainage works (Side drains, median drains, inlets etc.) and protection works along the project length, Design of Rainwater harvesting pit, Preparation of Hydrologic and Hydraulic reports and detailed project reports and construction drawings during the execution phase
  • Name of the Assignment or Project: Feasibility Study on Multiple Candidate Road Corridors
  • Corridor-3 Millennium Challenge Corporation 95332421Q0062 TVS Malawi II CDF Study (Kasungu – Mponela), Project Length: 59.629 Km and Corridor-9A Millennium Challenge Corporation 95332421Q0062 TVS Malawi II CDF Study (Namitete – Likuni), Project Length: 53.209 Km
  • Month and Year, United State of America
  • Main Project Features: Project Length: 112.838 km; 2/4/6 Lane

Hydraulic Engineer

Tamil Nadu
06.2018 - 02.2020
  • Activities Performed: Responsible for Hydrologic surveys, identifying the natural drainage path through desk studies, Delineation of Catchment areas up to the bridge sites, Estimation of design discharge for a design return period up to the bridge site, Fixing the waterway for bridges and culverts
  • Design of Floor protection works for Bridges, Planning and design of Road drainage works (Side drains, median drains, inlets etc.) and protection works considering the climate resilience aspects/factor in designs along the project length, Preparation of Hydrologic and Hydraulic reports and detailed project reports
  • Coordination with client for approving the DPR
  • Name of the Assignment or Project: Validation of Detailed Project Report (DPR) for the selected corridors including state on ground to the requirements of Asian Development Bank (ADB) under Tamil Nadu Road Sector Project-II (TNRSP-II)
  • Contract PPC-02 for CKICP (Funded by Asian Development Bank (ADB)
  • Month and, Nadu
  • Main Project Features: Project Length: 156.91 kms (Various roads SH-09, SH-23,SH-64, SH-69 and SH-142

Hydraulic Engineer/DGM

Gandhi International Airport
11.2019 - 01.2020
  • Activities Performed: Responsible for Hydrologic surveys, identifying the natural drainage path through desk studies, Site visit to the project sites to access the condition of existing cross drainage structures and drainage requirements of the project
  • Rainfall analysis, Delineation of Catchment areas up to the bridge and culvert sites, Estimation of design discharge for a design return period up to the proposed sites, fixing the waterway for bridges, Floor protection works
  • Planning and design of Road drainage works (Side drains, median drains, inlets etc.) and protection works along the project length, Design of Rainwater harvesting pit, Preparation of Hydrologic and Hydraulic reports and detailed project reports
  • Name of the Assignment or Project: Preparation of Detailed Project Report four lane East-West and North South sector roads of Notified Area Committee (NAC) in the Premises of Rajiv

Hydraulic Engineer

Tamil Nadu
12.2019 - 02.2019
  • Activities Performed: Responsible for Hydrologic surveys, identifying the natural drainage path through desk studies, Site visit to the project sites to access the condition of existing cross drainage structures and drainage requirements of the project
  • Delineation of Catchment areas up to the bridge sites, Estimation of design discharge for a design return period up to the bridge site, fixing the waterway for bridges and culverts
  • Planning and design of Road drainage works (side drains, median drains, inlets etc.) Protection works along the project length, Preparation of Hydrologic and Hydraulic reports and detailed project reports
  • Coordination with client for approving the DPR
  • Name of the Assignment or Project: Contract TNRSP II/SC02: Preparing Detailed Project Report for Various Road Improvement works under Tamil Nadu Road Sector II PPC-02 (Bhuvangiri Bypass of Virdhachalam-Bhuvangiri road SH-70)
  • (Funded by World Bank)
  • Month and, Client: TNRSP, Govt
  • Of Tamil Nadu, Highways Department
  • Main Project Features: Project Length: 8.49 kms/ Project Cost - INR 159.10 crore

Hydraulic Engineer

OMS Infra Consultants Pvt. Ltd
01.2017 - 01.2018
  • Activities Performed: Responsible for Hydrologic surveys, identifying the natural drainage path through desk studies, Delineation of Catchment areas up to the bridge sites, Estimation of design discharge for a design return period up to the bridge site, Fixing the waterway for bridges and culverts
  • Planning and design of Road drainage works (Side drains, median drains, inlets etc.) and protection works considering the climate resilience aspects/factor in designs along the project length, Preparation of Hydrologic and Hydraulic reports and detailed project report.

Water resources Engineer

01.2017 - 01.2017
  • Development of Mumbai Central Station
  • Review of existing sources of supply for Central railway station, estimation of drinking water requirements for station main building, platform and other areas
  • Estimation of storm runoff and sewage from the station premises.

Engineer Water Resources (Design Engineer)

Water Transport Department
01.2012 - 01.2017
  • Project: Sustainable Coastal Protection and Management Investment Programme-Karnataka (SCPMIP-K), India
  • ADB Loan No 2679 MFF 0049-IND
  • Client: Public Works, Ports and Inland, PW, P&IWT), Govt
  • Of Karnataka
  • SCPMIP-K Project is designed to address the immediate coastal protection needs through the implementation of economically viable protection works using environmentally and socially appropriate solutions on long-term which is planned in multi tranche, each forming separate loan tranche under Multi-Tranche Financing facility
  • The project is to address the causes and potential causes of coastal erosion and coastal instability
  • The project is categorized into four parts viz
  • Project Management
  • Support for Effective institutions
  • Planning and design and
  • Support for implementation of coastal protection and management projects
  • Part of project team as Design Engineer My tasks performed is as follows
  • Collecting baseline data from various stakeholders required for the project
  • Supporting international experts in design of Breakwater structure, design report, drawings, BOQ, costing and bid documents
  • Constant liaison with client& Govt
  • Of Karnataka in addressing project technical issues and attending project technical committees with TL& DTL
  • Reconnaissance surveys to identify vulnerable coastal areas as Tranche-2 subprojects along the shoreline of Karnataka where erosion is taking place
  • Preparing technical specifications for carrying out surveys (Toposurveys, Bathymetry surveys and Geotechnical) for supporting the Tranche-2 subprojects design
  • Assisted, facilitated National and International experts in calculation of Wave run-up and rundown, overtopping rates, significant wave height at the toe of the structure from the offshore wave data
  • Prefeasibility studies, feasibility studies for identified vulnerable sites as Tranche-2 subprojects along the cost of Karnataka
  • Detailed design of shore protection structures (seawalls, groynes, breakwaters and offshore reefs) including Topographic, bathymetric, geophysical surveys, dredging of sediment from seabed and estuaries, Quantification of dredged volumes for beach nourishment, design drawings, estimates of quantities and project cost
  • Preparation of detail project report for all the subproject sites including detailed designs, drawings, quantities, project cost and benefit cost analysis as per extant CWC guidelines
  • Supported and facilitated Team leader in preparation of Terms of reference for engaging consultants, supported procurement expert in preparing expression of interest (EOI), Request for Proposal RFP as per ADB standards and formats
  • Preparation of technical specifications for civil works package (rocks, Geotextile filter, topographic, bathymetric and geophysical, dredging and beach nourishment works) and bidding document for each subproject as per the ADB guidelines
  • Assisting and supporting the team leader and deputy Team leader in overall project management, execution and contract management
  • Quality control and assurance of civil works of Breakwaters, Offshore reefs (dredging and placing of concrete tetrapods) & geotextile inshore berms
  • Supervising and monitoring construction of all project components, verification and certification of quantities executed at site, verification of RA bills, Project management and contract management
  • Attending technical meetings and discussions with government of Karnataka
  • Facilitating the client in technical aspects of the project, Assisting ADB team during midterm review missions
  • Preparation of Monthly progress reports, quarterly progress reports and technical reports of the project, design drawings, preparing compliance to the comments received from various stakeholders and ADB authorities in regard to the project
  • Reviewing of Hydrologic analysis of bridge designs and approach for design of cross drainage structures for the works of Eastern Dedicated fright corridor.

Senior Hydraulic Engineer

MOTT MACDONALD GROUP
01.2011 - 01.2017
  • Carrying out Hydrologic and Hydraulic analysis design of cross drainage structures for National Highway and State Highway projects
  • Site visit to the project sites to access the condition of existing cross drainage structures and drainage requirements of the project
  • Delineation of catchment areas, estimation of runoff to the bridge sites, fixing the high flood level and waterway, design of floor protection works for bridges and river training works
  • Attending client meeting and technical discussions
  • Planning and design of road surface and subsurface drainage system for National and state Highways
  • Design of check dam across the streams at bridge locations.

Engineer

Water Resources
01.2011 - 01.2012
  • Mumbai IV Water supply Project - Pinjal and Gargai Dam Feasibility studies
  • Client: Brihanumbai Municipal Corporation
  • Designing and managing delivery of water Transmission and treatment Project 455MLD Water Supply augmentation 900MLD of Water Treatment Plant, 140ML of Balancing Reservoir, Conveyance of 2451 MLD water From Pinjal Dam to Bhandup WTP
  • The study is mainly aimed to augment Pinjal and Gargai rivers to meet the Water Supply Demand of Mumbai city and its suburbs by year 2021
  • Scope of work is to carryout feasibility studies identifying various dam locations and calculating the dependable yield at dam sites based on Hydrological analysis Main tasks handled
  • Fixation of various alternatives for Dam locations of Pinjal and Gargai
  • Hydrological analysis (rainfall runoff)
  • Water availability studies
  • Fixing Storage capacities of the dam
  • Reservoir simulation studies
  • Stability analysis for gravity dam
  • Design of Ogee Spillway
  • Hydropower potential studies and design of penstocks, forebay tank, Tailrace channel
  • Design Drawings for dam and its appurtenant works
  • Preparing BOQ’s, Rate analysis and Project Cost Estimates
  • Preparation of feasibility reports and detailed project reports
  • Alternatives of water conveyance system from dam outlets to the water treatment plant located in Mumbai
  • Strom Drainage Network for Coca-Cola Bottling plant Ghaziabad, India
  • Client: Coco cola
  • Hydrologic analysis, estimation of peak runoff, calculating time of concentration and inlet time, checking the adequacy of the existing storm drains in bottling plant
  • Checking the adequacy of the existing storm drains within the Coco cola bottling plant
  • Design and resizing the existing storm drains dimensions to carry adequately designed storm flows from the watershed and from bottling plant areas and safely dispose to the outlet and wet pond located within the plant
  • Preparing design drawings of storm drainage network
  • Feasibility Study for diversion of surplus water from South Region to North Region of Gujarat State:
  • Bill of Quantities for Hydraulic structures (Barrage and weir) in the project.

Senior Engineer

CORAMANDEL ENERGY PVT LTD
01.2010 - 01.2011
  • Business Development) and my responsibilities are to explore the new opportunities in hydropower sector from various sources and liaison with the client to acquire the require details and report to Chief Executive officer
  • Visited Munirabad Hydroelectric project and carried out the adequacy assessment for Tail race channel with additional power generation using surplus water from Tungabhadra dam
  • Reviewed the Tail Channel design of Ghataprabha dam
  • Responsible for procuring the tender documents, understanding the technical details, terms and conditions of the tender documents, visiting the project sites for reconnaissance surveys, attending the pre-bid meeting, gathering information regarding statutory clearances of the project from authorities
  • Exploring availability of resources within the vicinity of the project and enquiring about the availability of labour and material locally with their rates
  • Understanding the technical options and review of tender drawings and technical requirements of the project
  • Preparing the tender documents as per requirement of the tender document, construction methodology, cost estimates from the tender drawings and tender submission
  • Vendor development for Hydro mechanical and electromechanical works, taking quotes from the vendor for the works as specified in the tender documents
  • Supporting project manager in carrying out Technical & financial assessment of Hydropower projects on BOOT basis, carried out levelized tariff for the project over a period of 10 years
  • Hydraulic analysis for the small hydro power scheme including trench weir, desilting tanks, power channels, power ducts and Head Race Tunnels which convey water though gravity
  • Surge analysis for penstock and checking the adequacy of the Tail race channels.

Civil Engineer

SCL INFRATECH LTD
01.2009 - 01.2010
  • Uttrakhand
  • Kalinga-I (1X2MW), Kalignaga-II (2X2MW) & Madhyamaheswar (3X5 MW) SHEP, Uttaranchal.

Hydraulic Engineer/DGM

KNR constructions Ltd
01.2002 - 01.2006
  • Main Project Features: Project Length:, Activities Performed: Responsible for Hydrologic surveys, identifying the natural drainage path through desk studies, Site visit to the project sites to access the condition of existing cross drainage structures and drainage requirements of the project
  • Rainfall analysis, Delineation of Catchment areas up to the bridge and culvert sites, Estimation of design discharge for design return period up to the proposed sites using various methods, fixing the waterway for bridges, Floor protection works
  • Planning and design of Road drainage works (Side drains, median drains, inlets etc.) and protection works along the project length, Design of Rainwater harvesting pit, Preparation of Hydrologic and Hydraulic reports and detailed project reports and construction drawings during the execution phase
  • Name of the Assignment or Project: Consultancy Services for preparation of Detailed Project Report Cost Estimate/ Bid documents/ Technical Schedules for Construction of 6-lane Flyover (Size -40 Nos
  • Of 25 m Span x 6 m Height) including RE Wall approaches with Flexible Pavement in the Elephant Corridor at Krn.202+533 of Angul-Sambalpur Section of NH-42 (New NH No.55) in the State of Odisha on EPC mode.

Public Works
- 01.2004
  • Road Department, Assam
  • Main Project Features: 2.40Km of Major Bridge across River Subansiri & 860m Major Bridge across pagaladiya river and other bridges and protection works
  • Positions Held: Hydrologist
  • Activities Performed: Visiting the site for assessing the site conditions, review of the Hydrologic and Hydraulic design (Design Discharge, Waterway, Fixation of HFL, Scour levels) submitted by the contractor for execution, Approving the design report for bridges, suggestion on river training works for the rivers
  • Name of the Project: Preparation of DPR for Various roads
  • Widening of Munugode-Nampally from Km 12/0, (16km) in Nalgonda District, Telangana State
  • Four lanning of Nalgonda-Mushampally-Dharmapuram Road in Nalgonda District 27.70km
  • Construction of Bypass Road 0/0, 8 Connecting Wanaparthy-Atmakur Road at 4/6-8 and Wanaparthy-Kollapur Road at (km 5/2-4) in Wanaparthy District, Telangana State
  • Widening of single to double lane road from Sagar PWD Road from Km 0/0 to 16/500 in Ranga Reddy District, Telangana State
  • Preparation of DPR for Construction of 4-Lane Road from Siddipet-Elanthakunta mandal Head quarters from Km 0/0 to 22/0 on Siddipet-Kistapur Road, Telangana State
  • Consultancy services for the preparation of DPR for Four Laning through Rairakhol town from Km 195+400 to Km 201+400 in Angul-Sambalpur Section of NH-42 (New NH No.55) in the State of Odisha
  • Preparation of DPR for Extension of Existing 4-lane Main access Road to 6/8 Lane for 6.5Km from West Entry up to Novotel Rotary i.e
  • Rajiv Gandhi International Airport Approach Roads, Govt
  • Of Telangana, GMR HIAL and NHAI

Education

Post Graduate Programme - Development and Management of Roads and Highway Projects for working professionals

NICMAR

M.Tech - Water Resources Engineering

National Institute of Technology Warangal

B.Tech - Civil Engineering

Acharya Nagarjuna University

Skills

Operations management

Innovation and creativity

Data-driven decision making

Product management

Key Qualifications

15 years of work experience in hydrology and hydraulics, Rainfall-Runoff studies, Flood frequency analysis, Dependable yield calculations, reservoir simulation studies, sedimentation analysis, storage planning, Design flood estimation for different Hydraulic structures including Dam, Spillways, Bridges, Culverts Storm drains. Storm drainage and flood management studies for both urban and Highway projects. Feasibility studies, Detailed designs, detailed project report and execution of water infrastructure projects. Design of Hydraulic and Shore protection structures, Floor Protection works, Power potential studies for Hydro Electric project, Highway alignment studies, Inventories, technical specifications for civil works, Topo and Hydrographical/bathymetry surveys, Dredging, estimation of BOQs, Rate analysis, Project cost estimates, preparation of bid documents, Certification and verification of quantities and RA bills, project management and contract management. Exposure to National and International standards like BS, CIRIA, IRC and familiar with ADB guidelines.

Educationandprofessionalstatus

  • Post Graduate Programme in Development and Management of Roads and Highway Projects for working professionals (PGP-DMRHP), NICMAR, Pune, 05/22
  • M.Tech (Water Resources Engineering), National Institute of Technology Warangal, 05/09
  • B.Tech (Civil Engineering), Acharya Nagarjuna University, 05/06

Membership

  • Associate Member of “The Institution of Engineers (India)”
  • Chartered Engineer (India)

Supplementaryinformation

Evolving the Hydraulic Design of Reservoir and Appurtenant structures using Physical and Numerical Modelling: Undergone 2-day training organized by CWPRS, Pune in Hydraulic design of Reservoir and appurtenant structures., Preparation of Shoreline Management plan–Undergone 6 days Training in Shoreline Management plan organized by ICMAM, NIOT in Chennai. Where they have given lectures about coastal process, got exposure to software packages that are available for Numerical Modelling for coastal structures, sediment movement, shoreline changes., Contract Management (FIDIC): Organized and Attend the Training conducted by NICMAR Pune, as part of the project Programme (ADB) on FIDIC contract conditions its consequences on existing EPC contracts., Training on Health and Safety organized by ADB., Industrial Training: Prakasam Barrage Head works on upstream side. Construction of sheet piles using ‘C’ Channels for increasing the seepage length as part of protection works executed at site for a period of 10 days., Undergone training at CADD centre, Vijayawada from 2006-2007 on AUTO CAD, 3D-STUDIOMAX STAAD PRO and PRIMAVERA., AutoCAD, HEC HMS, HEC RAS, Water gems/EPANET (basic), Global Mapper, ArcGIS (Arc Hydro), Windows 98, XP, M.S. Office (MS Word, Power point, Excel), Basics of computers and Packages

Languagecapability

Mother tongue, Spoken – Good; Read – Good; Write – Good, Spoken – Good; Read – Good; Write – Good, Spoken- Fair; Read- No; Write- No

Specialisation

Water Resources Engineering

Positioningroup

Hydraulic Engineer

Personal Information

  • Profession: Civil Engineering
  • Year of Birth: 19xx
  • Nationality: xxxx

Software

Hydraulic Modeling

Certification

NAAC

Timeline

Associate Principal Engineer (Hydrologist, Disaster Climate Change Specialist)

Louis Berger Consulting Pvt. Ltd
05.2024 - Current

Hydraulic Engineer/Deputy General Manager

04.2024 - 11.2024

NAAC

02-2024

Deputy General Manager

NAC, GMR
04.2023 - 04.2024

Republic of Mauritius, Rail Vikas Nigam Limited
01.2023 - 05.2023

Civil Engineer, Chartered Engineer

Vidyut Nigam limited
04.2022 - 04.2024

Odisha
01.2022 - 05.2022

Hydraulic Engineer/DGM

Millennium Challenge Corporation
12.2021 - 03.2022

Hydraulic Engineer

Tamil Nadu
05.2021 - 10.2022

Hydraulic Engineer

Tamil Nadu
12.2019 - 02.2019

Hydraulic Engineer/DGM

Gandhi International Airport
11.2019 - 01.2020

Hydraulic Engineer

Tamil Nadu
06.2018 - 02.2020

Hydrologist/Disaster and Climate

Sheladia Associates Inc
02.2018 - 04.2024

Hydraulic Engineer

MORTH
02.2018 - 01.2023

Hydraulic Engineer

OMS Infra Consultants Pvt. Ltd
01.2017 - 01.2018

Water resources Engineer

01.2017 - 01.2017

Engineer Water Resources (Design Engineer)

Water Transport Department
01.2012 - 01.2017

Senior Hydraulic Engineer

MOTT MACDONALD GROUP
01.2011 - 01.2017

Engineer

Water Resources
01.2011 - 01.2012

Senior Engineer

CORAMANDEL ENERGY PVT LTD
01.2010 - 01.2011

Civil Engineer

SCL INFRATECH LTD
01.2009 - 01.2010

Hydraulic Engineer/DGM

KNR constructions Ltd
01.2002 - 01.2006

Public Works
- 01.2004

M.Tech - Water Resources Engineering

National Institute of Technology Warangal

B.Tech - Civil Engineering

Acharya Nagarjuna University

Post Graduate Programme - Development and Management of Roads and Highway Projects for working professionals

NICMAR
SHANKAR GUNJI