Maximum demand calculation
Switchgear specification
Power factor correction system specification
Transformer specification
Arc furnace operating point analysis
Furnace power system engineering
Protection relay coordination
Electrical control logic design
Power distribution panel design
Switchgear and transformer commissioning
Single-line diagram preparation
Cable sizing
Heat load calculation
Technical specification preparation
Vendor offer analysis
Critical equipment inspection
Project estimation
Electrical engineering
Component selection
Technical discussions with consultant & customers and experience in engineering & project coordination
Inspection and Testing of Switchgear & Transformers
Document standardization
Engineering & detailed calculation of Power System Equipment (having additional skill for Arc furnace working point calculation
Power Factor Compensator
Heat Load) 19 years (From June 2005 –till date)
Engineering & Project coordinations for turnkey & refurbishing projects. 10 Years (From 2014 – till date)