Deputy Manager E&I (Instrumentation)
Lloyds Metals And Energy Limited Konsari
11.2024 - Current
Independently handled the Instrumentation & Control Systems of a 4 MTPA Pellet Plant, covering Engineering, Execution, Commissioning, and Maintenance activities for the Cold Zone area, which includes:
Thickener
Slurry System
Pressure Filter
Process Water Pump House
Water Treatment Plant (WTP)
Developed and maintained instrumentation cable scheduling, termination scheduling, and instrument scheduling for efficient planning and execution of instrumentation work.
Oversaw erection scheduling and execution monitoring of a wide range of field instruments, including:
Density Meter, Moisture Analyzer, Pressure Transmitter, Knife Gate Pneumatic Valve, Ultrasonic Level Transmitter, Control Valve, pH Analyzer, Turbidity Analyzer, Weigh Scale, Magnetic Flow Transmitter, Chlorine Analyzer, Pneumatic Actuator Operated Shut-Off Valve, Photovoltaic Distance Sensor, Temperature Transmitter, Thermocouple, RTD, etc.
Conducted instrument calibration during commissioning stage in accordance with operation data sheets, in close coordination with the operations team.
Handled post-commissioning and production phase responsibilities as the Instrumentation Section In-charge for the Cold Zone, ensuring smooth operation and timely maintenance of all instrumentation systems.
Managed complete spare parts lifecycle, including:
Initial material code generation
Parts number identification
Purchase Requisition (PR) generation
Purchase Order (PO) follow-ups
Material receiving and inspection for all cold zone instruments
Led and managed a 24-member E&I team in the cold zone, including shift scheduling, leave management, and daily task planning.
Provided technical training and mentorship to 15 DETs and GETs, ensuring knowledge transfer on instrumentation systems and familiarization with plant operations and culture.
Actively contributed as a core team member for SAP Fiori PM module implementation, representing the Instrumentation & Electrical department of the 4 MTPA plant during planning, configuration, and rollout.
Capacity:4MTPA
Assistant Manager Control & Instrumentation(Department E&I)-Blast Furnace (686 Cubic Meter Bell Less Top)
Jindal Steel & Power Limited
05.2019 - 10.2024
Handled maintenance work of Field instruments & calibration of various types instruments & transmitters major instruments short description focus on day-to-day job:
Magnetic Flow Transmitter: Optiflux4100c-Ex Krohne(Size Dn125,200)
Thermocouple: K,B,M,I,S Type, Chinese Make For Various Temperature Measurement, HMT Controller.
RTD:PT 100 3 wire,Chinese Make.
Shutoff Valve: Rotraq
Allen Bradley Power Flex 70 drives maintenance.
Working knowledge of RX Logics 5000 & day to day support to operation to avoiding production loss.
Responsible for preparation of monthly shift schedule preparation for man power management, monthly PM scheduling, quarterly shutdown job scheduling of instruments & automation job.
TPM activity:Kaizen,Fugai,5S,PM flow developing.
SAP PM & MM module working knowledge.
Maintenance budgeting for keeping spare parts.
Maintained regular follow up of the needed material with purchase departments, Store and outside suppliers.
Electrical maintenance of LT feeders.
Capacity:3.6MTPA
Engineer Control & Instrumentation- 4X360 MW Coal Based Thermal Power Plant (BOP ASH & Coal Handling Plant)
R.K.M Powergen Pvt.Ltd
05.2017 - 04.2019
Trouble shooting during operation hour of instruments like Temperature sensor, Level sensor, Pressure sensor ,Limit switch, ZSS, Belt sway ,Pull cord ,Magnetic separator ,Belt scale ,Plough discharger, Valve ,UPS ,Mcc,etc.
Working knowledge of GE PLC PACS RX3I
Preparing DPR and MPR.
Spares Management and import substitution in maintenance purpose.
Proper documentation of maintenance manuals & drawings.
Adopted all safety precaution while maintenance.
3x660 MW Koradi Thermal Power Extension Project (Client Maharashtra State Power Generation & Company) Scope BOP (Project )
Control & Instrumentation Engineer Lanco Infratech Ltd.
06.2010 - 06.2014
Erection, Testing and Commissioning of C&I system of BOP package i.e. Coal Handling Plant, Ash Handling Plant, Water & Waste water treatment plant.
Ensure installation is of a standard so as to avoid quality and safety.
Respecting all safety and environmental norms during work.
Prepare all audit related documents.
Experience in project planning and project execution plan.
Experience in billing procedures and preparation of payment certificates
Preparation of reconciliation statements
Preparation of purchase requisition and GRN.
Proper documentation of Drawings, POs, Operation and maintenance manuals.
Monitor and control progress of construction work within the scheduled frame.
I/O testing & cold loop and hot loop testing.
Erection of cable tray, laying of C & I cables as per approved drawing
Calibration of all kind of SMART/HART compatible and field instruments like pressure, flow, level, temperature and analytical transmitters and switches.
Sound knowledge of Electrical works involved in various job related to project.
Material inspection activity with client and getting MRC.
Junior Engineer Control & Instrumentation-4.5 MTPA Pellet Plant Project and Maintenance
Jindal Steel and Power Limited
02.2008 - 06.2010
Erection, Testing and Commissioning of C&I system of 4.5 MTPA Pellet Plant i.e. Raw Material Handling System, Hot air generator, Ball mill, Balling disc, Indurating furnace and Final Product handling.
Ensure installation as per quality plan.
Respecting all safety and environmental norms during work.
Installations and commissioning of Burner Management System.
Procurement of instruments and accessories and follow up with vendor, purchase and stores.
Review of supplier's drawings and documents.
Knowledge of Functional Block Diagram & Ladder Logic programming of RS Logix-5000 Software.
Monitor and control progress of construction work within the scheduled frame.
I/O testing & cold loop and hot loop testing.
Commissioning of weigh feeder, belt weigher, and BMS panel, loss in weight system, gas analyzer, dust monitor, transmitters, switches and gauges.
RS logix 5000,PLC trouble shooting and maintenance.
Familiar with LT electric system.
Education
10th -
MP State Board (CGBSE)
Diploma Engineering - Industrial Electronics
Govt. Polytechnic College
Durg, CG
01.2008
12th - undefined
CG State Board (CGBSE)
01.2004
Skills
Positive mindset
Humility and Respect
Flexibility
Collaboration
Time management
Integrity
Problem-solving
Commitment to excellence
SAP PM & MM Module
RX Logics 5000
MS Office
Languages
English and Hindi.
Training
Safety certification by Clovers safety services pvt limited nebosh acceredited centre 776
Design & Control Circuit training at L&T switch gear Training Centre Lucknow.
Information security awareness training.
J1 analytical examination.
PERSONAL DETAILS
Date of Birth: 30 Sep 1985.
Permanent Address: Maa swayam Siddhha sadan purani Basti Kargi Road Kota 495113,Bilaspur,C.G.
Timeline
Deputy Manager E&I (Instrumentation)
Lloyds Metals And Energy Limited Konsari
11.2024 - Current
Assistant Manager Control & Instrumentation(Department E&I)-Blast Furnace (686 Cubic Meter Bell Less Top)
Jindal Steel & Power Limited
05.2019 - 10.2024
Engineer Control & Instrumentation- 4X360 MW Coal Based Thermal Power Plant (BOP ASH & Coal Handling Plant)
R.K.M Powergen Pvt.Ltd
05.2017 - 04.2019
3x660 MW Koradi Thermal Power Extension Project (Client Maharashtra State Power Generation & Company) Scope BOP (Project )
Control & Instrumentation Engineer Lanco Infratech Ltd.
06.2010 - 06.2014
Junior Engineer Control & Instrumentation-4.5 MTPA Pellet Plant Project and Maintenance