Summary
Overview
Work History
Education
Skills
Affirmation
Timeline
Generic

ANMOL GUPTA

Thalikullam

Summary

Dynamic construction professional with extensive experience at Larson & Toubro Ltd, excelling in site management and resource optimization. Proven track record in executing complex structures, leading teams effectively, and ensuring project success. Skilled in site planning and coordination, with a strong focus on quality and safety in high-value projects.

Overview

12
12
years of professional experience

Work History

Assistant Manager- Structures

Shivalaya Construction Company Pvt.Ltd
Thalikullam
11.2023 - Current
  • Handling execution of all structures i.e Flyover, MJB,VUP, LVUP and culverts from ch.335 to 369 according to given approved drawings, specifications and safety
  • Preparing schedule and sub-contractor bills for smooth progress of work
  • Resource management, ensuring optimal value on time, cost, safety and quality
  • Team managing skills of 15, Micro Planning of structure progress
  • Project cost: - 1420 Crs
  • Title:- Construction of Six Lane access-controlled Highway from kapparikad to Thalikullam to section of NH- 66 from Ch.335+000 to Ch.369+000 in the state of Kerala on Hybrid Annuity Mode under Bharatmala Pariyojana Pkg-III

Manager Coordinator

SRSC Infra Pvt Ltd
Noida
07.2023 - 10.2023
  • Tracking of Drawings with Design Consultancy
  • Coordinate with Site Superiors in all respect of the project
  • Maintain Daily Reports, Requirements, and Vendor Payments
  • Project cost: - 338 Crs
  • Title:- Improvement and Up-Gradation of Existing Road To 2/4 lane with Paved Shoulder from km 40.000 to 88.750
  • Start of Khutar bypass to start of shahjahanpur bypass of NH-731 (Pkg-1) in the state of Uttar Pradesh

Assistant Construction Manager (Structures)

Larson & Toubro ltd
Muzaffarnagar
07.2019 - 01.2023
  • Was responsible of all structure execution within 26km of detour section from ch: 16+500 to 42+864 kms which includes Piling works, Pile Cap, Pier/Abutment walls, Pier/Abutment caps, RCC & PSC Girders, Deck Slabs, VUP's PUP's, Box Culverts, Drain, ERS
  • Total Sub-contractor handled are 16 nos
  • With 8 team members
  • Preparing BBS, Sub-contractor Bills with steel & concrete reconciliation and other records
  • Kept 2 nos
  • Of Ajax Fiori at site for better progress of linear structures
  • Resource Management
  • Manage Minor Liaisoning with DFCC-Meerut & Saharanpur Division
  • Project cost: - 2864 Crs
  • Title: - Construction of New Single Track for Khurja-Pilkhani (Approximately 220 kms of single lane) Section of Eastern Dedicated Freight Corridor CP-303 Package

Senior Engineer (Structures)

Larson & Toubro ltd
Dholera
04.2018 - 07.2019
  • Was responsible of 2 nos
  • Box type bridges with open foundation and with 4 intermediate walls of size 45.0x21.0x5.5m and also looking after 5 kms of Storm water drain with minimum size of 1.5x0.5x0.5m and maximum size of Lx8.0x4.5m
  • Preparing of BBS, Sub-contractor Bills with steel & concrete reconciliation and other records
  • Project cost: - 1734 Crs
  • Title: - Dholera Special Investment Region Smart City Project

Senior Engineer (Structures)

Larsen & Toubro ltd
Katni & Jabalpur
09.2016 - 04.2018
  • Was responsible of all structure execution within 10kms from ch: 369+000 to 379+000 kms, which includes VUP's, PUP's, Pipe Culverts, and Box Culverts
  • Was a part of ongoing construction of Narmada Bridge at Tilwara Ghat, Jabalpur at ch: 411+471 kms, with total length of 954 m, maximum ht
  • Of the pier- 28.832m and 41.480m length of the span
  • Casting of PSC Girders at Site
  • Preparing of BBS, Sub-contractor Bills with steel & concrete reconciliation and other records
  • Resource Management
  • Project cost-1850 Crs
  • Title:- Construction of Six Lane NH-7, Consist of Widening & New Alignment of Rewa-Katni-Jabalpur-Lakhnadon, Pkg II

Execution Engineer (Structures)

Afcons Infrastructures Ltd
Etawah
05.2015 - 08.2016
  • Was responsible for Piling work of all Major & Minor bridges, Laying & casting of Pre-cast Box culverts, Cast In-situ Box culverts, Pipe Culverts, PSC Girder Casting at site
  • RFI attachments, maintaining DPR and Executing work according to the given drawings
  • Project cost: - 2500 Crs
  • Title: - Green Field Expressway from Firozabad to Etawah, Pkg II-4546 (Agra- Lucknow Expressway)

Junior Engineer

IRB Infrastructures and Developers Ltd
Anand
04.2013 - 04.2015
  • Handled minor structures such as VUP, PVUP, culverts, and piling works
  • Maintaining DPR and executing the work according to given drawings
  • Maintaining RFI attachments
  • Project Cost:- 4880 Crs
  • Title:- Construction of Six Lane NH-8 Consist of Widening & New Alignment of Ahmedabad to Vadodra in the state of Gujarat

Education

B-TECH - CIVIL ENGINEERING

VISVESWARAYA NATIONAL INSTITUTE OF TECHNOLOGY
NAGPUR, MAHARASHTRA
01.2012

H.S.C -

CBSE
NEW DELHI
01.2007

S.S.C -

CBSE
NEW DELHI
01.2005

Skills

  • Coordinating team
  • Site records
  • Site monitoring
  • Site management
  • Site supervision
  • Site planning and Execution
  • Site requirements
  • Assigning Task at site

Affirmation

I hereby affirm that the information in this document is accurate and true to the best of my knowledge.

Timeline

Assistant Manager- Structures

Shivalaya Construction Company Pvt.Ltd
11.2023 - Current

Manager Coordinator

SRSC Infra Pvt Ltd
07.2023 - 10.2023

Assistant Construction Manager (Structures)

Larson & Toubro ltd
07.2019 - 01.2023

Senior Engineer (Structures)

Larson & Toubro ltd
04.2018 - 07.2019

Senior Engineer (Structures)

Larsen & Toubro ltd
09.2016 - 04.2018

Execution Engineer (Structures)

Afcons Infrastructures Ltd
05.2015 - 08.2016

Junior Engineer

IRB Infrastructures and Developers Ltd
04.2013 - 04.2015

B-TECH - CIVIL ENGINEERING

VISVESWARAYA NATIONAL INSTITUTE OF TECHNOLOGY

H.S.C -

CBSE

S.S.C -

CBSE
ANMOL GUPTA