Summary
Overview
Work History
Education
Skills
Accomplishments
Languages
Languages
References
Timeline
Generic
Shirsak Dey

Shirsak Dey

Kolkata

Summary

Insightful and Efficient professional government Engineer working with Indian Railways for the last 7+ years vastly experienced in execution of large railway construction projects mainly Major Bridge projects. Supervises contractor's work as well as works at remote locations. Mastery of technical specifications, construction methodologies and working knowledge of AutoCad, autolevel and Total Station. Highly-motivated employee with desire to take on new challenges. Strong work ethic, adaptability, and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.

Overview

8
8
years of professional experience

Work History

Senior Section Engineer (Bridge)

Indian Railways
Kolkata
04.2016 - Current
  • Worked throughout in a client position involved in the execution and supervision of big railway construction projects.
  • Contract and project management in coordination with contractors.
  • Specialization in major bridge projects from foundation to substructure, up to superstructure at field level.
  • Execution and launching of various type of railway girder bridges like PSC girders (18.3m span), Composite Girders (12.2m, 18.3, 24.4m spans), Steel girders like Open Web Girders(30.5m, 45.7m, 61.0m, 76.2m span) , Plate Girders (12.2m span) , Bow String Girders (30m, 48m, 36m span),Railway Foot Over Bridges.
  • Inspection during various stages of girder fabrication .
  • QA/QC quality control and overseeing documentation.
  • Involved in inspection of various type of girder bearings like Rocker-Roller bearings, POT-PTFE bearings and elastomeric bearings at fabrication workshop.
  • Involved in planning of launching scheme of various type of girders over river canal, running railway lines etc.
  • Involved in execution of building projects upto (G+4).
  • Developed cost estimates and project specifications for proposals.
  • Interacted with state and local agencies concerning compliance with codes and regulations.
  • Communicated with staff teams, creating schedules and recommending employees for promotions.
  • Coordinated with subcontractors and consultants to boost productivity and efficiency.
  • Created project schedules and evaluated construction plans using maps and blueprints.
  • Designed utilities and facilities for construction projects.
  • Monitored construction progress, updating documents and information.
  • Established and conducted quality control programs to verify construction projects met required quality standards.
  • Analyzed existing structures to create plans for modifications and improvements.
  • Prepared, checked, and coordinated documentation to support component design and application.
  • Preparation of contractor bills .
  • Working Knowledge of , Autolevel ,AutoCad and Total Station.
  • To date, I have been involved in the execution of 72 PSC girders, 7 open web girders, 4 steel plate girders, 48 composite girders, 3 bow string girders, 1 open web composite girder, and 2 foot over bridges.
  • Developed, implemented, and monitored engineering standards and procedures.
  • Organized team meetings to discuss progress on current projects.

Education

Bachelor of Engineering - Civil Engineering

Bengal Engineering And Science University
Shibpur

Skills

  • Proficiency in concrete construction- Bridges and Structures
  • Cost Estimation
  • Site Inspections
  • Design development
  • Strategic scheduling and planning
  • Safety Monitoring
  • AutoCAD proficiency
  • Interdisciplinary collaboration
  • Proposal creation
  • Technology integration
  • Project management expertise
  • Proficiency in Steel Structure Construction
  • Proficiency in Quality Control
  • Working knowledge of Autolevel machine, Total Station
  • Proficiency in residential building construction
  • Co-ordination between multidisciplinary departments
  • Administration management
  • Materials Testing
  • Adopting new construction methodolgies

Accomplishments

.

  • Launched a 61.0m Open Web Girder over running railway track within a block period of 7 hours by launching nose method with accuracy and efficiency.
  • Launched a 33m span , 3m wide FOB girder within 3 hours .
  • Successfully executed 72 nos PSC Girders , 2 nos non-standard 30.5m OWG with ballasted deck slab.
  • Handled projects of worth INR 200 Crores in collaboration with various contractors and their team.

Languages

  • English
  • Hindi
  • Bengali

Languages

Bengali
First Language
English
Proficient (C2)
C2
Hindi
Advanced (C1)
C1

References

References available upon request.

Timeline

Senior Section Engineer (Bridge)

Indian Railways
04.2016 - Current

Bachelor of Engineering - Civil Engineering

Bengal Engineering And Science University
Shirsak Dey