Summary
Overview
Work History
Education
Skills
Personal Information
Timeline
Generic

Shiva Prasad Veerla

ELECTRICAL ENGINEER
Visakhapatnam

Summary

Electrical Engineer with solid experience in the execution, testing, and commissioning of solar power projects. Skilled in handling DC/AC systems, inverter and transformer installation. Strong understanding of site operations, cable management, and system performance testing. Proven ability to coordinate with contractors and technical teams to ensure safe, timely, and efficient project completion.

Overview

9
9
years of professional experience
2037
2037
years of post-secondary education

Work History

Electrical Engineer

TUV Rheinland
12.2024 - Current
  • Responsible for end-to-end execution of solar power projects, from site preparation to commissioning.
  • Supervised AC and DC cable laying, termination, and routing as per engineering drawings and safety standards.
  • Oversaw pile casting and erection of Module Mounting Structures (MMS) ensuring alignment and structural integrity.
  • Conducted testing and commissioning of electrical systems to verify operational performance and compliance.
  • Worked closely with civil, mechanical, and quality teams for smooth integration and execution on-site.
  • Maintained documentation of site progress, testing reports, and ensured adherence to project timelines and safety protocol

Project Engineer

RELIANCE PROJECTS&PROPERTIES PVT LTD
03.2021 - 05.2023
  • Executed complete lifecycle of a 40MW solar power plant, from civil works to installation, testing, commissioning, and plant energization.
  • Supervised TS marking, pile casting, coping, and MMS foundation civil works; handled MMS structure and PV module installation with string connections.
  • Managed DC string and AC cable laying, trench excavation, termination, glanding, and INVERTER INSTALLATION as per engineering drawings.
  • Carried out erection, installation, and commissioning of IDTs, inverters, LT panels, and UPS systems, including cable terminations and testing.
  • Led HT/LT cable laying, jointing, and HT switchgear installation and commissioning across the site
  • Regularly reviewed and monitored project progress, including material management, civil, electrical, and commissioning activities.
  • Coordinated with electrical contractors and technical teams to ensure on-time project delivery.

Electrical Engineer

RENEW POWER
01.2019 - 03.2021
  • Hands-on experience in DC testing, troubleshooting, and module testing/replacement, including leap frog string connections, voltage/polarity checks, insulation tests, and earth resistance verification.
  • Supervised module installation, DC cable stringing, termination at SMBs, SCBs, inverters, and control room panels as per electrical design.
  • Conducted routine testing and maintenance of 4.4 MVA transformers, including WTI, OTI, PRV, Buchholz relay; operated ACDB and ICOG panels (ABB).
  • Managed inverters, performing preventive, corrective, and shutdown maintenance along with inverter fault troubleshooting.
  • Operated and maintained ARCTECH solar trackers, switchyard equipment (CB, CT, PT, LA, isolators), and photovoltaic modules (polycrystalline & thin-film).
  • Proficient in plant SCADA monitoring, preparing daily generation reports, and performing monthly billing via joint meter readings.
  • Ensured proper erection of cable trays, control cabling, and power cabling as per cable schedules; supervised site O&M activities.
  • Prepared and maintained daily progress reports, executed maintenance work orders, and responded to emergency fault calls.
  • Contributed to planning and tracking with daily, monthly, and yearly preventive maintenance schedules, ensuring system uptime and plant performance.

Electrical Engineer

AUROBINDO SOLAR POWER PLANT
10.2016 - 01.2019
  • Performed DC testing, troubleshooting, module testing, and replacement to maintain system efficiency.
  • Operated and maintained String Combiner Boxes and ABB PVS 800 Central Inverters, ensuring optimal inverter performance and uptime.
  • Conducted routine testing of 4.4 MVA transformers (WTI, OTI, PRV, Buchholz Relay) and managed ACDB/ICOG panels (ABB).
  • Carried out AC LV system maintenance and repairs, including preventive and reactive maintenance tasks.
  • Handled firmware updates, system diagnostics, and computer-based monitoring of electrical components.
  • Supported site engineers and managers in day-to-day operations and maintenance activities, ensuring plant reliability and performance.

Education

Electrical Engineering

THE INSTITUTION OF ENGINEERS(INDIA)
Kolkata, India

DIPLOMA, ELECTRICAL & ELECTRONICS ENGINEERING

PRAKASAM ENGINEERING COLLEGE
Kandukur, India
05.2001 - 04.2015

Skills

  • TEAM WORK

  • PROBLEM SOLVING

SOLAR PV SYSTEMS

AC&DC

PROJECT MANAGEMENT

Personal Information

Timeline

Electrical Engineer

TUV Rheinland
12.2024 - Current

Project Engineer

RELIANCE PROJECTS&PROPERTIES PVT LTD
03.2021 - 05.2023

Electrical Engineer

RENEW POWER
01.2019 - 03.2021

Electrical Engineer

AUROBINDO SOLAR POWER PLANT
10.2016 - 01.2019

DIPLOMA, ELECTRICAL & ELECTRONICS ENGINEERING

PRAKASAM ENGINEERING COLLEGE
05.2001 - 04.2015

Electrical Engineering

THE INSTITUTION OF ENGINEERS(INDIA)
Shiva Prasad VeerlaELECTRICAL ENGINEER