Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

SHIVKUMAR KULKARNI

BE. CIVIL ENGINEERING
Kalyan,Maharashtra

Summary

Strategic Construction Manager with demonstrated success assessing project scope and adhering to deadlines. Safety-conscious and detail-oriented with 5 year industry background. Well-versed in team leadership and task delegation to drive project progress and foster client satisfaction.

Overview

5
5
years of professional experience
19
19
years of post-secondary education
1
1
Certificate

Work History

Construction Manager

LAXMI KAMAL GROUP
AMBERNATH, MAHARASHTRA
10.2022 - Current


  • Monitored subcontractor operations and applied effective time, resource and money management strategies to delivery under-budget project completion.
  • Surveyed sites to determine material needs and accurately manage inventories and budgets.
  • Verified completed projects met approved time, quality and cost estimates.
  • Led weekly production and operations contractor meetings, facilitating stronger communication and helping to resolve critical issues.
  • Evaluated subcontractor bids and identified most qualified and economical candidates, establishing advantageous contracts and cutting costs.
  • Conducted routine quality audits to verify progression against specifications and initiated corrective actions to remedy concerns.
  • Reduced costs by driving competitive subcontractor bids and effective contract execution.

Assistant Construction Manager

L&T CONSTRCUTION
BANGLORE, KARNATAKA
03.2019 - 09.2022

KEMPEGOWDA INTERNATIONAL AIRPORT, BANGLORE

  • It is a Bengaluru Airport Extension project for the construction of its second terminal with an envisioned cost of 3000 crores.
  • I was looking after CUP (CENTRAL UTILITY PLANT), one of the important service buildings for BIAL Terminal 2 Building, which includes Substations, water tanks, WTP, DG supply, Chiller plant, fire protection, and surveillance.
  • Oversaw planning, execution and handover of R.C.C works. Also was in charge for handling complete packages for all the finishing works including external façade and road development works.
  • Coordinated with site personnel & client for one time quantity certification and billing.
  • Since it is a service building, acting as a key coordinator for civil and MEP for streamlined execution of work for timely completion.


Senior Engineer

L&T Construction
BYCULLA, MUMBAI, MAHARASHTRA
02.2018 - 03.2019

PENINSULA LAND " Salsette 27"

  • It is a Residential Building project with 2 Towers and a Non-tower area (for parking and Clubhouse) comprising of 3 basements 6 podium levels and 58 residential floors with an estimated value of 675 crores constructed over an area of 9000sqm.
  • Oversaw the construction works of one of the towers and was in charge of ACS (Auto-Climbing System for core walls) ensuring required cycle time of 9 days in compliance with quality and safety.
  • As a team, have completed the raft 44 days ahead of schedule and eventually maintained that lead in further works.
  • Promoted teamwork and demonstrated effective communication skills to improve collaboration among personnel.
  • I was preparing BBS for timely procurement of steel , DPR , subcontractor bills, raising RFIs as and when required and maintaining documents for the tower so as to maintain the cycle time.
  • Being rewarded several times for being safety and quality conscious and taking proactive measures for maintaining the same.
  • Trained and managed interns, junior engineers and surveyors.
  • Established and maintained productive working relationships with client.

Graduate Engineer Trainee

L&T Constrcution
Byculla, Mumbai, MAHARASHTRA
08.2017 - 02.2018

PENINSULA LAND “Salsette 27”

  • I have undergone a brief rotation module through various departments of L&T.
  • Includes: Execution, Quality, Safety, Planning, Formwork, Rebar (BBS), Finishing, P&M & M.E.P.
  • I was into Planning and Quality for a brief period. I was involved in quantity estimation & ensuring timely certification of bills from the client. In Quality dept., was involved majorly in the inspection of material and site works ensuring quality as per the specification and standards.
  • Initiated a Safety Rolling Cup to motivate the team to take safety as its utmost priority.
  • Learnt the basics of designing formwork, types of formwork systems and preparing formwork strategy.

Education

Bachelor of Engineering - Civil Engineering

THE NATIONAL INSTITUTE OF ENGINEERING
MYSURU, KARNATAKA
08.2013 - 07.2017

11TH -12TH - SCIENCE

SREE GURU COLLEGE
KALABURGI, KARNATAKA
06.2011 - 06.2013

1OTH -

MOHINDAR SINGH KABUL SINGH ENGLISH HIGH SCHOOL
KALYAN, MAHARASHTRA
06.1998 - 06.2011

Skills

    AutoCAD

undefined

Certification

AGILE PRINCIPLES AND METHODOLOGIES

Timeline

Construction Manager

LAXMI KAMAL GROUP
10.2022 - Current

AGILE PRINCIPLES AND METHODOLOGIES

09-2022

Assistant Construction Manager

L&T CONSTRCUTION
03.2019 - 09.2022

Senior Engineer

L&T Construction
02.2018 - 03.2019

Graduate Engineer Trainee

L&T Constrcution
08.2017 - 02.2018

Bachelor of Engineering - Civil Engineering

THE NATIONAL INSTITUTE OF ENGINEERING
08.2013 - 07.2017

11TH -12TH - SCIENCE

SREE GURU COLLEGE
06.2011 - 06.2013

1OTH -

MOHINDAR SINGH KABUL SINGH ENGLISH HIGH SCHOOL
06.1998 - 06.2011
SHIVKUMAR KULKARNIBE. CIVIL ENGINEERING