Summary
Overview
Work History
Education
Skills
Accomplishments
Disclaimer
Certification
PERSONAL PROFILE
Languages
Timeline
Generic
SHIV KUMAR SHARMA

SHIV KUMAR SHARMA

Aligarh

Summary

Dynamic Site Co-Coordinator with extensive experience at Siemens Ltd, adept at managing electrical systems and leading teams to ensure seamless project execution. Proven track record in preparing comprehensive progress reports and maintaining QA/QC documentation. Skilled in troubleshooting and effective client communication, resulting in successful project commissioning with minimal electrical issues.

Overview

25
25
years of professional experience
1
1
Certification

Work History

Site Co-Coordinator

M/s Siemens Ltd
01.2001 - Current
  • Currently working with M/s Siemens Ltd for SI EA as a Site Co-Coordinator for HYD02 & HYD12 220/33KV GIS Substation for M/s.Microsoft Data Centre (Hyderabad).
  • Previously Worked with M/s Siemens Ltd for SI EA as a Site Co-Coordinator since May-2023 to April-2025for HYD01 & HYD11for M/s. Microsoft Data Centre (Hyderabad)Work Included 220/33KV GIS, HVAC, BAS, FA & PA, Scada including Civil building work with G+2 with Transformer foundation.
  • Worked with M/s Siemens Ltd. (SI DS).as a site manager since July 21 to April 2023 at ITC Ltd Bhadrachalam Telangana, work included HT& LT Panels, Bus-Duct, Transformer’s for 65 MVA HPRB Boiler and Turbine, ESP, Evaporator related all Electrical work.
  • Worked with M/s Siemens Ltd. (SI DS).as a site manager since Oct’20 to June 2021 at Adani Electricity Mumbai Limited Project of 33kV GIS boards Installation Testing & Commissioning, 125 MVA 220/33kV Ester Oil filled Siemens 1st Transformer at Mumbai.
  • Worked with M/s Siemens Ltd. (EM MSP).as a site manager since Oct 2019 to Oct’20 at M/s Volkswagen Chakan India 2.0 Plant Manufacturing Line expansion project work included Compact Substation (CSS) and Siemens Make Bus-Duct Installation Testing & Commissioning.
  • Worked with M/s Siemens Ltd. (EM MSP).as a site manager since Feb 2018 to Feb 2019 at M/s Honda Cars India ltd Work included HT Package (HT, LT Panels and Bus-Duct, Transformer’s Installation Testing & Commissioning.
  • Worked with M/s Siemens Ltd. (EM MSP).as a site manager since April 2017 to Feb 2018 at M/s Munjal Kirii industries Vithlapur Ahmadabad Work included LT Package and 66/11 KV Switch Yard with Transformer and plant electrification.
  • Worked with M/s Siemens Ltd. (EM MSP) as a site manager since Oct. 2016 to March 2017 at M/s Vikaram Solar Pvt. Ltd. Badhala, Jodhpur. Work included 132/33 KV Switch Yard with Transformer Installation Testing & Commissioning Work Including Civil Work.
  • Worked with M/s Siemens Ltd. (EM MSP) Ltd. as a site manager from Dec. 2015 to Oct. 2016 at M/s Hero MotoCorp Ltd. Manufacturing Plant Halol Gujarat. Work Included HT/LT Package (66/11 KV GIS HT, LT Panels, Scada and Bus-Duct, Oil and Dry type Transformer’s Installation Testing & Commissioning.
  • Worked with M/s Siemens Ltd. (EM MSP) as a site Engineer from April 2015 to Dec. 2015 at M/s Hero MotoCorp Ltd. IRDC Centre Kukus Jaipur, Rajasthan. Work Included HT/LT Package (132/11 KV GIS HT, LT Panels, Scada and Bus-Duct, Oil and Dry Type Transformer’s Installation Testing & Commissioning.
  • Worked with M/s Siemens Ltd. (IC) as a site manager from Dec. 2012 to April 2015 at M/s Adobe system Pvt. Ltd. Sec.132 Noida (UP). Work included HT, LT & Electrical Distribution, LMS, UPS, Bus-Duct, Rising main, and Bus Bay for Data Centre Rack Installation.
  • Worked with M/s Siemens Ltd. (Industry) as a site in charge since July 2012 to Dec 2012 M/s ITC Ltd. The job involves: Installation of Cables, Conduiting, Wiring, Cabling, Earthing, Light Fixture, L.T. Panel
  • Worked with M/s Siemens Ltd. (Industry) as a site in charge since Jan 2009 to July 2012 MCD CIVIC CENTER. The job involves: - HT, LT & Electrical Distribution, Dry type Transformer, UPS, Bus-Duct, Rising main, Cables, Conduiting, Wiring, Earthing, Light Fixture Installation testing and commissioning
  • Worked with M/s Siemens Ltd. (Industry) as a site Engineer since Jan 2007 to Dec 2009 DMRC Metro Bhawan. The job involves: -Installation of HT & LT Panels, Dry type Transformer’s, DG, UPS, Bus-Duct, Rising Main, Cables, Conduiting, Wiring, Earthing, Light Fixture, LMS, Fire Alarm, PA, LMS, BMS Access System
  • Worked with M/s L&T (ECC Division) as a site supervisor since Dec.2004 to Dec 2006 Delhi metro project MC1B at Rajeev Chowk The job involves: - Installation of HT & LT Panels, cables, Conduits, Wiring, Cabling, Earthing, Light Fixture.
  • Worked with M/s Puspa Electrical as a site supervisor since Jan 2004 to Dec 2004 Delhi Metro Project MC1A at Kashmiri Gate The job involves: - - Installation of HT & LT Panels, cables, Conduits, Wiring, Cabling, Earthing, Light Fixture.
  • Worked with M/s Senbo Engineering LTD as a site supervisor since oct 2002 to Dec 2003 Delhi Metro Project MC1B The job involves: - I was handled plant &Machinery equipment
  • Worked with M/s doing young Pvt Ltd. as a site supervisor since Jan 2002 to oct 2002 Delhi Metro Project MC1B The job involves: -: -I was handled plant & machinery equipment.
  • Worked with M/s J.P.Mittal as a site supervisor since Feb 2001 to Dec 2001 Delhi Metro Project MC1BThe job involves: Conduiting, Lighting, and Cabling.

Education

Intermediate -

U.P. Board
M B D HSS PITHA KHUTIPURI HATHRAS UP
06-1999

10th -

U.P. Board
SRI S D SINGH INT COLLEGE IGLASH ALIGARH UP
06-1997

Skills

  • Managed a site team and workers who maintained all aspects of the electrical systems
  • Prepared look-ahead documents, and weekly, monthly progress reports, and billing information
  • Reviewed and monitored job costs versus budgets
  • Reported regularly to the management team
  • Preparation of as-built drawing and site closing activities
  • Preparation of the bill of materials and BOQ
  • To act as a coordinator between the client and the contractor
  • To attend the meeting with client officials
  • Completed projects had a very smooth and easy start-up to the commissioning phase, and electrical problems were near non-existent
  • Maintained proper inspection and QA/QC documentation, like L1 to L5 TEGs, as well as manpower reports, progress reports, and EHS documentation
  • Assisted in the preparation and submission of change orders, and rework and extra work rate negotiation
  • Coordination with civil, MEP, and ELV services
  • RCA, troubleshooting, and why-why analysis

Accomplishments

  • Appreciation letter by Adani Transmission Ltd for environment health and safety work HYD-11 Hyderabad
  • Appreciation letter by Adani Transmission Ltd for quality work, HYD-01, Hyderabad
  • Excellence Awards 2022 by Siemens Ltd
  • Certificate of appreciation for continual improvement and excellent performance in occupational health, safety, and environment, and achieving 4 lakh safe man-hours
  • Appreciation letter by Hero Moto Corp - HMCL Halol site
  • Appreciation letter by Honda Cars India Ltd
  • Appreciation letter by Adobe System India Pvt. LTD.

Disclaimer

I hereby declare that the above information and details provided by me are correct to the best of my knowledge. Date: - 2025-05-05 Place: - Aligarh SHIV KUMAR SHARMA

Certification

  • Diploma in Electrical Engineering in 2011
  • SITRUST Training Certificate.
  • First Aider Certificate.
  • Basic knowledge of AutoCAD.

PERSONAL PROFILE

  • Father’s Name: Sh. Lakshmi Narayan Sharma
  • Date of Birth: 1980-07-06
  • Nationality: Indian
  • Marital Status: Married
  • Salary Expected: Negotiable.

Languages

Languages Known: Hindi & English

Timeline

Site Co-Coordinator

M/s Siemens Ltd
01.2001 - Current

Intermediate -

U.P. Board

10th -

U.P. Board
SHIV KUMAR SHARMA