Summary
Overview
Work History
Education
Skills
References
Accomplishments
DeClARatioN
Operations & Maintenance:
Production Management:
Timeline
Receptionist
SHIV KUMAR UKE

SHIV KUMAR UKE

Working In Steel Melt Shop Operation
BHILAI

Summary

19 + years of result-oriented experience in primary and secondary steelmaking .Working on Electric arc Furnace since 2006 and knowledge of LRF and Caster .Proven skills in project management and steel plant operations, contributing to efficient steel making and metallurgy processes. Especially in electric arc furnace/LRF and billet caster routes) at SIMLEX CASTING LTD RAIPUR (CG),UTTAM VALUE STEELS LTD WARDHA (MAHARATRA), JSW_BPSL SAMBALPUR (ORRISA) . I assisted with the commissioning of the EAF project responsible for the operation of the LRF and CASTER. .

Overview

19
19
years of professional experience

Work History

Manager SMS (Operation)

JSW _BPSL SAMBALPUR( ORRISA)
07.2013 - Current
  • As an operation Shift Manager at SMS-1 (110 ton/50-80 MVA Four EAF).
  • As a metallurgist and commissioning
  • As a metallurgist and commissioning engineer, working on modified Electric arc furnace
  • Studying commissioning activity.
  • Studying commissioning activities and giving feedback for improvement or modification of procedure or item.
  • Currently working on
  • Currently working on setting up charge mix, oxygen injection and tap input recipe.
  • Working with local operation team of troubleshoot the problem and maximize per day
  • Production
  • Also working on production parameter
  • Also working on production parameter of EAF operation and coordination with other respective department to avoid delay.
  • Participated in technical discussions, equipment installation, and HMI design finalisation.
  • Worked on Hot and cold commissioning of the electric arc furnace (110 ton/50-80 MVA) supplied with the charge mix of 55% HOT METAL AND 45% DRI+Scrape charge mix.
  • Worked on project commissioning troubleshooting in at SMS-I.
  • PPC-required heat tapping chemistry and casting heat planning and execution
  • Ladle management and clear communication with the caster are essential for avoiding delays and furnace shutdowns.
  • Manpower handling and safety considerations.
  • Minimize input resources' cost and maximize production, also achieving the target on time.
  • Implementation for online heat tracking and data input tracking.
  • Three times 32Heat tapped in 8 Hr Shift duty.

Sr Engineer(Operation)

UTTAM VALUE STEEL LTD
02.2007 - 07.2013
  • Worked as a Melt Shop Shift engineer of a 60 ton capacity of EAF/LF/ CASTER.
  • Managed scrap yard to plan for EAF charge mix.
  • Was responsible for safety consideration of shift manpower and safety PPEs.
  • Worked on commissioning and stabilization of the electric arc furnace 60 t along with HOTMETAL procedure setup.
  • Worked with the SMS- team to standardize processes, safety interlocks, and HMI design finalization for smooth operation.
  • Had achieved tapping of 07 heat/day with a heat capacity of 60 tons/furnace.

GET

IM/S SIMPLEX CASTING LTD
09.2006 - 02.2007
  • I began working as a GET at SIMLEX CASTING LTD on the SMS-

Education

BACHLOR OF ENGINEERING - METALLURGICAL ENGINEERING

G. E. C. RAIPUR
RAIPUR, CHHATTISGARH
01.2006

Skills

Languages-Hindi, EnglishMarathi

References

Sanjay, Dhondhare, 91-9124655718

Accomplishments

  • BEST PERFORMER OF THE YEAR :- (OUTSTANDING RATING) MAY-2011

DeClARatioN

To the best of my knowledge and belief, the information given in this form is true. Date: -2025-05-23 SHIVKUMAR UKE

Operations & Maintenance:

  • Effectively participating in maintenance schedules during shut-down.
  • Identifying the causes of purging failure.
  • Proactively identify areas of obstruction/breakdowns.
  • Improving Overall Equipment involved in improving yield by eliminating root cause analysis

Production Management:

  • Proficiency in making foamy slag during EAF operation.
  • Proficiency in making heat with high yield.
  • Awareness of furnace health.
  • Proficiency in addition of all alloying elements & fast heat making to achieve aim chemistry
  • Proficiency in making fast heat to match sequence in continuous casting machine.
  • Awareness of power consumption.
  • SMS Refractory management for managing costs and getting optimum life.
  • Responsible for Total Production Management in SMS section.

Timeline

Manager SMS (Operation)

JSW _BPSL SAMBALPUR( ORRISA)
07.2013 - Current

Sr Engineer(Operation)

UTTAM VALUE STEEL LTD
02.2007 - 07.2013

GET

IM/S SIMPLEX CASTING LTD
09.2006 - 02.2007

BACHLOR OF ENGINEERING - METALLURGICAL ENGINEERING

G. E. C. RAIPUR
SHIV KUMAR UKEWorking In Steel Melt Shop Operation