Summary

  • Management Professional Testing and Commissioning Engineer| Progress Analysis| Erection, Testing & Commissioning Industry Preference Location Preference: anywhere in INDIA
  • Merit of contributing in Project coordination, erection, testing & commissioning of complete 400/220/132 KV, Substations
  • An enterprising leader skilled in repositioning projects to achieve excellence, possess the unique quality of managing high Pressure environments and progress speed up with ease and open mind.

Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.

Overview

1
1
year of professional experience
37
37
years of post-secondary education
3
3
Languages

Work History

Apprentice

POWERGRID CORPORATION OF INDIA LIMITED
10.2023 - 10.2024
  • OPERATION AND MAINTENANCE OF 400KV AND 220KV SWUTCHYARD EQUIPMENT AND AUXILIARY'S SYSTEM
  • Power line carrier communication
  • Battery (220 volt,50 volt)
  • AC,LT system
  • Current Transformer, Capactive Voltage Transformer, Circuit Breaker, Lighting Arrestor
  • Pre commissioning test of 500MVA Transformer (Toshiba) & 400 KV CT AND CVT
  • ICT 4 BAY EXTENSION (419 & 420 BAY)
  • Being well informed in following tests
  • CONTACT RESISTENCE MEASUREMENT TEST
  • DYNAMIC CONTACT RESISTENCE TEST
  • CAPACITENCE AND TAN DELTA TEST
  • INSULATION RESISTENCE TEST
  • SWEEP FREQUENCY RESPONSE ANALYSIS TEST
  • WINDING RESISTENCE TEST
  • INSTALLATION OF RELAYS (Differential Relay, Impendance relay, Over Voltage relay)
  • Involved in Commissioning and Erection works of Hybrid Gas Insulated switch gear (HYOSUNG)
  • Maintaining documents as may be require for work and its traceability shall be ensured
  • Create team spirit among other colleagues / labour force available at site to achieve the result
  • Maintain the site the best way possible to avoid internal quarrel if any / solve minor disputes on time
  • Sending daily progress reports through mail to head office and establish effective communication with site staff as well as with head office
  • Preparation of site erection reports / test reports etc., validating by the concerned and maintain a record final handing over of project documents

Education

B. Tech - Electrical

Sharanbasava University
Kalabuargi, Karnataka
04.2001 - 01.2022

Associate of Science - PCMB

DoddAppa Residential Independent Pre University
Kalburgi
04.2001 - 01.2018

10th - undefined

Prganya English Medium school

Skills

Project Execution

Personal Information

Date of Birth: 01/01/01

Maintenance

  • Maintaining documents as may be required for work and its traceability shall be ensured
  • Create team spirit among other colleagues / labour force available at site to achieve the result
  • Maintain the site the best way possible to avoid internal quarrel if any / solve minor disputes on time
  • Sending daily progress reports through mail to head office and establish effective communication with site staff as well as with head office.
  • Preparation of site erection reports / test reports etc., validating by the concerned and maintain a record final handing over of project documents

Timeline

Apprentice

POWERGRID CORPORATION OF INDIA LIMITED
10.2023 - 10.2024

B. Tech - Electrical

Sharanbasava University
04.2001 - 01.2022

Associate of Science - PCMB

DoddAppa Residential Independent Pre University
04.2001 - 01.2018

10th - undefined

Prganya English Medium school
SHRUSTI HABALKARProgress Analysis, Erection, Testing & Commissioning Engineer