A Technocrat & aspiring Data Scientist, Engineering Services Officer of Indian Railways Service of Signal Engineering (IRSSE-2017). Detail-oriented team player with excellent time management and problem-solving skills. Organized and dependable candidate successful at managing multiple priorities & projects with a positive attitude.
Assignment-1:
Commissioning of Belagula station in connection with yard modification: Monitored and supervised indoor & outdoor work progress, carried out site correspondence testing, coordinated with S&T/MYS, electrical, civil & operating depts. for smooth commissioning of Belagula station
Assignment-2:
Commissioning of OTOS work in KRDP-DDHI section:
Monitored work progress, carried out quad cable testing & EMC socket testing, coordinated with S&T/UBL , Electrical & Civil depts. for smooth commissioning of OTOS in KRDP-DDHI section
Assignment-3:
Shifting of Stores of S&T/CN/BNC unit:
Monitored shifting of materials to new store location at Doddjala, assisted in scrapping of released material,coordinated with electrical & civil depts. for provision of new store building with electricity & provision of CCTV system and telecom arrangements (Railnet, Wi-Fi, Railway phones) in new stores
Assignment-4:
Shifting/Commissioning of OFC & 6-Quad cable in PKD-NGM section in connection with doubling of PKD-DMM section:
Monitored & supervised work progress, carried out quad cable testing , coordinated with S&T/SBC, Railtel & civil depts. for smooth commissioning.
Assignment-5:
Finalization of Manpower outsourcing/hospitality contract:
Assisted in preparation of estimate, convened & finalized TC minutes and awarded work through GeM portal (first service contract of this office through GeM)
Assignment-6:
FAT testing of Kundgol,Pachchapur, Suldhal & Byadagi stations of
UBL division:
Assisted CN/UBL unit & carried out FAT testing of
Kundgol, Pachchapur, Suldhal & Byadagi stations
Assignment-1:
HMIS work at RH/SBC & other hospital units over SBC division:
Prepared estimate, tender schedule and finalized requirements for the said work. Co-ordinated with RH/SBC & RailTel. Floated Tender and convened TC minutes & awarded the work.
Assignment-2:
Commissioning of new 6-Quad cable in Karavalli-Omalur section:
Monitored and supervised work progress & tested new 6-Quad
cable including test check of related works
Assignment-3:
VSS work over SBC division:
Planned & carried out surveys at class-A & B stations for VSS work, finalization of location for server rooms, coordinated joint survey with RPF, division and Railtel.
Assignment-4:
Convening TC minutes for various works of GSU/MYS & MYS division:
Convened TC minutes & awarded LOAs for:
a. provision of IPS & RTU at LC gates over MYS division.
b. Provision of Fire Alarm at stations over MYS division.
c. AMC of Electronic Interlocking over MYS division.
d. Provision of PA system s at stations over MYS division.
Assignment-5:
FAT testing of Castle Rock Station:
Assisted RVNL & carried out FAT testing of Castle Rock station of UBL division
Assignment-1:
Statutory roles & responsibilities and duties performed:
a. Accompanying GM inspections, CRS inspections, SAG inspections & safety inspections
b. Maintenance of all S&T assets under jurisdiction
c. Ensuring that all important inspection notes of higher authorities receive prompt action
d. Co-ordination with Engineering and other branches in case of combined works
e. Co-ordination with officers and staff of other branches in all other matters to ensure smooth functioning of signaling and telecommunication system
f. Ensuring supply of approved quality materials and tools for the installation and maintenance of the equipment
g. Ensuring strict discipline amongst staff within the framework of the Rules
h. Dealing promptly with appeals and representations from and looking after the welfare of his staff
i. Assisting construction & project organization in smooth commissioning of new S&T installation
Assignment-2:
Task performed/objectives:
a. Provision of RTUs at 19 LC gates
b. Provision of Fire Alarm System at 23 stations
c. Provision of Automatic fuse change over system at16 stations
d. Provision of Sliding boom at I/L LC gates at 5 LC gates
e. Replacement of point machine (143mm): 32 nos
f. Provision of high thrust point machine (220mm): 37 nos.
g. Secondary cells replacement: 2556 nos.
h. Defective cable replaced (in mtrs.): 12018 metres
Assignment-3:
Provision of additional Shunt signal at KDAG station:
Monitored and supervised indoor & outdoor works, performed bell testing, prepared NI plan, carried out Site acceptance test & site correspondence test and commissioned the station with additional shunt signal for better yard flexibility
Assignment-4:
Provision of EOLB at LC-2 & 11 in YPR-TK section with Sliding boom:
Prepared estimate for the said work & awarded work order, monitored & supervised work progress, coordinated with civil & electrical depts. for smooth commissioning of EOLB & Sliding booms.
Assignment-5:
Provision of track locking arrangements for left out points at YPR station and replacement of old point groups:
Prepared estimate for the said work as per requirements & awarded work order,Monitored and supervised indoor & outdoor works, coordinated with traffic dept. for getting disconnections, tested the points for effective track locking
Assignment-6:
Closure of two traffic gates at KPN station:
Coordinated minor EI alteration & relay room wiring at KPN station for closure of traffic LCs, performed site correspondence test
Assignments & Trainings:
Assignment-1:
Testing of Electronic Voting Machine:
a. Carried out security testing of EVM with respect to principles of cryptography duly ensuring data confidentiality, data authenticity, data integrity and non-repudiation of data among different devices of EVM
b. Carried out functional testing of EVM for proper casting of votes, proper calculation of scores of candidates & printing receipts of casted votes through Voter Verifiable Paper Audit Trail (VVPAT) device.
c. Carried out various Environmental & Quality Assurance tests on EVM namely drop test, vibration test, thermal cycling test and humidity test.
d. Carried out Electromagnetic Interference (EMI) test & Electromagnetic Compatibility (EMC) test on EVM
e. Coordinated with officials of manufacturer of EVM machines (Bharat Electronics Ltd.) for smooth testing, bug fixing & attending defects in EVM machines.
Assignment:
Assignment-1:
Designing of Ground Control Station (GCS) for Rustom UAV:
Assignment-1:
Automated User Interface Testing of Samsung Mobile Phones:
Signal Engineering
Python for Data Science
C
Basic Java
Data Structures
SQL
Mathematics for Data Science
Foundation Training at National Academy of Indian Railways (NAIR)
Training in IP-MPLS & Communication based VoIP Server
Trainings under railway PSUs (DMRC, RCIL, DFCCIL), Workshops & RDSO
Field training & HQ trainings under various railways of Indian Railways
Foreign training at SNCF Railway, France
Appreciation training at different Railway training institutes i.e. IRICEN (Pune), IRITM (Lucknow), IRMEE(Jamalpur) & IREEN (Nasik)
Management training at IIM Kozhikode
Signalling & Telecom Engineering Training under Indian Railways Institute of Signal & Telecom (IRISET)
Foundation Training at National Academy of Indian Railways (NAIR)
Microcontroller 8085 & Embedded Systems
I hereby declare that the information enclosed herewith is correct to the best of my knowledge and i bear the responsibilities for correctness of the above mentioned particulars.