Professionally accomplished IT professional with 8 years of diversified IT experience managing advanced multi-platform I.T. Infrastructure and working extensively on managing Cloud Platforms which includes Nutanix Private Cloud OVH Cloud Hosted Private Cloud (HPC) and Bare Metal Cloud. Passionate hardworking Individual with a zeal to learn and grow and build a successful career path and enhance growth of the company and achieve utmost customer satisfaction.
• Extensively worked on, products like VMware vSphere 6.x and VMware NSX.
• Worked on multiple Disaster Recovery and Backup Solutions like VMware HCX, Zerto and Veeam.
• Worked on VMware HCX - Primarily used to migrate workload across datacenters from VMware to OVHCloud
- Involved in the project myself after the acquisition for migration.
• Providing Technical Support and Advice to customers using VMware HCX and Training new Team members
and creating Knowledge Base articles to benefit the Team.
• Also, worked on vSphere Replication extensively deploying from scratch and assisting customers with their
DR solutions.
• Assisted with Live Migrations from customer's on-prem Data Center to OVH Cloud Data Center without any
downtime.
• Day to day work in OVHCloud includes assisting customers with Technical issues in Hosted Private Cloud ,
Public Cloud and Bare Metal Cloud (Dedicated Servers and VPS).
Projects Handled during Job tenure:
1. HCL Technologies.
• Cold Migrations and Hot Migrations.
• Perform Daily Checks, Weekly Checks, and Monthly Checks on regular basis like vCenter
• Converting Virtual Machines running on Workstation to VMs on ESX Server (V2V)
• Converting Physical machines to Virtual Machines using VMware Converter (P2V)
• Troubleshooting issues related to Virtual Machine vMotion, snapshots, clones, templates.
• Call logging with (VMware) Incident Management / Problem Management / Change Management.
• Check alerts of Datastore usage, ESXi hosts, Snapshot Consolidation, VMs with snapshots etc.
• Installation, Configuration, Administration and Troubleshooting of Virtualization Environment using ESXI 5.X, vsphere 5.0, Virtual Center, VI Client, Web Client.
• Updating firmware, BIOS and network driver’s version of DELL and HP servers related to ESXi.
• Updating virtual infrastructure using SSH.
• Maintaining Standard Operating Procedures — Documentation• Deploy Virtual machines from vRealize Automation.
• Planning of vCenter upgrade from vsphere 5.5 to vsphere 6.0.
• Following Daily, Weekly and Monthly checklists to keep the VMware environment healthy and compliant.
• Maintenance of vSAN environment.
• A close administration on daily tasking and monitoring the internal functioning of vSAN environment.
• Upgraded vSAN6.0 to 6.2.
• Hardware planning for the environment.
• Patch upgrade of security and everything else regarding vsphere and vSAN and vsphere data protection 6.x.
• Implementation of VMware vsphere replication for critical virtual machines for real time replication and their monitoring.
2. National Informatics Center (NIC).
• Performed implementation planning.
• Networking changes that need to done.
• Pre hardware checking of HP servers and there hardware compatibility.
• Bios setting and ESXI installations on all the servers.
• Cluster formation, adding hosts and NIC teaming and their issues.
• Installation of platform service controllers, vCenter and its configure failover.
• External database and its clustering using VMware compatibility.
• Handled licensing issues that occurred during implementation and all other issues regarding vCenter networking.
• Discussions and presentation and workaround for backups of virtual machines and division of clusters according to number of licenses and operating systems
• Resolves certificate issues.
3. Reliance Jio.
• Perform daily routine checkups of all the servers.
• Check alerts and alarms on the vCenter server.
• Virtual machines and their warning.
• Formation of daily report and document for weekly report regarding steps taken to resolve issues.
• Coordination with client and VMware Team on calls when a new case need to be open.
4. State Bank Of India.
• Was working under VMware team for the implementation vsphere of HORIZON environment.
• Performed implementation of connection servers and view composers.
• Creation of POD structure on VBLOCK storage.
• Formation of same replica of the environment for DR site.
• Creation of SOPs for different sites.
• Formation of master template.
• Routine checkup of connection servers replication with other connection servers.
• Installation of vCenter and Platform service controller for the multiple sites.
• Formation of configuration and validation workbooks.• Validation of of different sites as per the documentation including ESXi configuration, Cluster setting and DVS settings.
• Daily routine checkup of production and DR sites for vblock environment.
5. Emcure Pharmaceuticals.
• Design discussion with the Customer.
• Answered Customer questions and queries regarding backup and high avaliability of the virtual machines.
• Discussion regarding pre-implementation requirements i.e. vLAN , IP, Network switches replacement to keep the environment available.
• Performed the compatibility of the hardware and minimum firmware versions of server hard drives, SSDs and storage controllers.
• BIOS setting changes before installation of ESXi in dell H730P servers.
• Installation and network configuration of the ESXi servers.
• Discussion with Customer regarding the configurational IP addresses for the ESXi hosts and DNS entries and naming convention for all other components.
• Discussion regarding the implementation of all three clusters 2 local and 1 on remote location and there management from the single vCenter.
• vSAN configuration including patch update, compatible hardware, firmware version and HCL database and finally formation of disk groups as per the customer requirement and disk group version upgradation.
• Formation of three MS-SQL clusters for local and remote location using latest feature of vSAN called iSCSi target.
• Creation of all the required documentation and SOPs needed.
• Was the part of KT session thus explained customer day to day operations and steps that need to be performed once the environment go in production.
6. Bajaj Allianz.
• Was there as a replacement engineer to handle project at the end.
• vROPs installation and configuration.
• Log Insight installation and configuration.
• Active directory integration of vROPs and Log insight and vCenter.
• Permissions as per costumer consent.
• Whole Project documentation.
• Installation of ePOps agent on several AIX machines and there particular dashboard.
7. Infosys.
• Providing support related to any problem faced by operation Team on vsphere infrastructure.
• Which includes patches, upgrades and several requirements regarding windows and linux machines which operations team is not capable to do or facing some problem.
VMware
Veeam
Prism
Prism central
Customer handling
Vsan
VMware HCX, NSX-V
Installation and configuration project handling
VROPS
Work flow planning
AHV and LCM
Migration
DNS and AD
Project documentation
Linux
VCP-DCV 6.5
I have a passion for riding motorcycles and exploring new places. I love the sense of freedom it gives me to discover unfamiliar destinations, and I always make an effort to immerse myself in the local culture, living like a local as much as possible. It’s about connecting with the places I visit and experiencing them from a unique, authentic perspective.
NSS
NCM
NCP
VCP-DCV 6.5