SHYAMA PRASAD MUKHERJEE

SHYAMA PRASAD MUKHERJEE

Civil Engineer, Project Management Professional, Dam Safety Expert and Arbitration Specialist
Faridabad

Summary

Accomplished Civil Engineer with over 36 years of experience in project management, contracts administration, design management and dispute resolution in the hydropower and infrastructure sectors. Adept at leading cross functional teams in a result oriented mission mode with a problem solving and collaborative approach in managing large-scale infrastructure projects.

Overview

36
36
years of professional experience
1
1
Certificate

Work History

Executive Director (Arbitration)

NHPC Corporate Office
Faridabad, Haryana
5 2023 - 12.2023
  • Dealt with arbitration matters and related court cases in association with law firms & advocates with a focus on contesting & safeguarding the interest of NHPC Limited.
  • Explore the possibility of dispute resolution through amicable settlement or AMRCD
  • Implemented Vivad -Se-Vishwas Scheme in NHPC to promote one-time settlement of long pending claim cases under litigation, reducing contingent liability of NHPC Limited from the prevalent level of INR 90 billion.
  • Collaborated with legal, contracts, finance and other professional teams to expedite settlement of claims.

Executive Director (ED) Regional Office- Teesta and Chief Executive Officer (CEO) of Lanco Teesta Hydro Power Limited

NHPC Limited
Singtam, Sikkim
09.2021 - 05.2023
  • Responsible for overall functioning of NHPC Limited in the "Teesta Region" covering the States of West Bengal, Sikkim and Manipur having 5 No. hydropower Stations (967 MW)
  • The Heads of the following Power Stations (Group General Manager level) report to the Executive Director (Region Teesta): Teesta-V (510 MW), Rangit (60 MW) in Sikkim; TLD-Ill (132 MW), TLD-IV (160 MW) in West Bengal and Loktak (105 MW) in Manipur
  • As Chief Executive Officer, Lanco Teesta Hydro Power Limited (LTHPL):
  • Responsible for dealing with all Company affairs including technical issues, contractual issues, insurance matters, legal matters, HR/PR, Finance including raising of debt funds for Teesta-VI HE Project, Environment & Forest related issues, Sikkim Pollution Control Board, Land related issues, Quality, Safety, Security, Liaisoning with District & State authorities, etc for execution of Teesta-VI H.E Project (500 MW) in Sikkim.
  • Major challenges included procuring Owner driven CAR/ EAR Insurance policies for partially completed and remaining portion of the works through competitive bidding, construction of 9.8m finished dia. twin tunnels (HRT) in adverse Himalayan geology, raising of debt funds at competitive rates for an erstwhile bankrupt company, amalgamation & merger of LTHPL with NHPC Limited.

Chief Executive Officer of Lanco Teesta Hydro Power Limited-LTHPL

Lanco Teesta Hydro Power Limited-LTHPL (WOS)
Singtam, Sikkim
02.2021 - 09.2021
  • Designated as CEO of LTHPL w.e.f 19.02.2021 subsequent to taking over of LTHPL (a financially stressed asset) by NHPC Limited through NCLT
  • Responsible for dealing with all Company affairs including technical issues, contractual issues, insurance matters, legal matters HR, PR, Finance including raising of debt capital, Environment, Land related issues, Quality, Safety, Security, Liaisoning with District & State authorities, etc for execution of Teesta-VI H.E Project (500 MW) in Sikkim.
  • Major challenges include re-commencement of works at all fronts in a hydro project on river Teesta languishing for 7-8 years by award of major contract packages for Civil, Hydro-Mechanical and Electrical/ Transmission line works, procuring Owner driven CAR/ EAR Insurance policies for partially completed and remaining portion of the works through tendering, construction of 9.8m finished diaTwin tunnels (HRT) in adverse Himalayan geology.
  • Designated as "Engineer-in- Charge" of all major contract packages for Civil, HM and E&M works and also as Head of the Project (HOP) of 500MW Teesta-VI Project, Sikkim.

General Manager at Design & Engineering Department

NHPC Limited
Faridabad, Haryana
11.2018 - 02.2021
  • Worked in Design & Engineering Department and dealt with planning, design & drawing approvals, O&M aspects, Dam Safety review & monitoring, Preparation & review of Technical Specifications/ Owner's Requirements & Tender Drawings including preparation of bid documents for package-wise/ turnkey contracts for upcoming NHPC Projects/ Joint Ventures (JV) & Subsidiaries and also external agencies including Ken Betwa Link Project (KBLP) on consultancy basis
  • Nominated as Member of Independent Panel of Experts/ Committee by external agencies (KSEB/ CEA) for overtopping of Poringalkutthu Dam, Kerala and Penstock rupture & resultant flooding of Kopili Powerhouse, Assam.

Chief Engineer (Civil) at Design and Engineering Department

NHPC Limited
Faridabad, Haryana
01.2017 - 11.2018
  • Worked in Design & Engineering Department and dealt with planning, design & drawing approvals, O&M aspects, Dam Safety review & monitoring, Preparation & review of Technical Specifications/ Owner's Requirements & Tender Drawings including preparation of bid documents for package-wise/ turnkey contracts for upcoming NHPC Projects/ Joint Ventures (JV) & Subsidiaries and also external agencies including Ken Betwa Link Project (KBLP) on consultancy basis.
  • Nominated as Member of Independent Panel of Experts/ Committee by external agencies (KSEB/ CEA) for overtopping of Poringalkutthu Dam, Kerala and Penstock rupture & resultant flooding of Kopili Powerhouse, Assam.

Chief Engineer (Civil) at Design and Engineering Department

NHPC Limited
Faridabad, Haryana
11.2013 - 12.2016
  • Worked in Design & Engineering Department and dealt with design/ drawing approvals of hydro-mechanical equipment of NHPC Projects, Operation & Maintenance aspects related with Hydro-Mechanical equipment including periodic dam safety inspections at various NHPC Power Stations; Technical consultancy works.

Chief Engineer (Civil) at Teesta Low Dam Project-Stage-III

NHPC Limited
Rambi, District Darjeeling, West Bengal
02.2012 - 10.2013
  • Deputed from CMD Office at Site on long duration tour for execution of remaining critical hydro-mechanical works including installation of Radial gates of Teesta Low Dam Project Stage-III (132 MW), West Bengal. The Project was commissioned in April 2013.
  • Collaborated with other departments to facilitate successful project completion. Developed and maintained close coordination with vendors & suppliers to facilitate quality and timely delivery of materials.
  • Prepared delay analysis reports, time extension proposal and deviation claims under the works contract.

Chief Engineer (Technical) at CMD Office

NHPC Limited
Faridabad, Haryana
08.2008 - 02.2012
  • Worked in CMD Office and rendered technical assistance and Management Services in the areas of inter-departmental coordination including HR related issues, policy matters, wage revision, Industrial Relations etc
  • Coordinating with MOP/ CEA/ CWC/ CERC on various project related technical & commercial issues; Rural Electrification works in 5 States (22 districts), Coordinating parliamentary matters, Examination of draft Board Agenda Notes, coordinating with functional Directors & Company Secretary, Dealing with Industry associations etc
  • Involved in various road shows & media interactions in connection with the launch of IPO of NHPC Limited.
  • NHPC Limited became a listed Company w.e.f. 01.09.2009.

Chief Engineer (Technical) at Director (Projects) Office

NHPC Limited
Faridabad, Haryana
02.2008 - 08.2008
  • Worked in Director (Projects) Office and rendered assistance in Management of construction Projects (8 No.), Projects under survey & investigation, dealing with contractual issues.
  • Ensured regulatory compliance by staying updated on industry standards and implementing necessary changes to company procedures

Senior Manager (Technical) at Director (Projects) Office

NHPC Limited
Faridabad, Haryana
09.2006 - 08.2008
  • Progress review and monitoring of ongoing construction projects (10 No.) in Director (Projects) office
  • Examination of various proposals & case files before putting them upto the Management for consideration.

Senior Manager (Civil) at Corporate Project Monitoring & Support Group (CPMG)

NHPC Limited
Faridabad, Haryana
04.2006 - 09.2006
  • Monitoring of 10 No hydropower projects of NHPC under various stages of construction and rendering Project Management Services at CPMG NHPC Limited.

Senior Manager (Civil) at Indira Sagar Project

NHDC Limited
Punasa, District Khandwa, Madhya Pradesh
01.2004 - 04.2006
  • Fully involved with the fabrication & erection of Hydro-mechanical works at site including 20 No. (20x17m) crest type spillway radial gates of Indira Sagar Project through FGUP VO TECHNOPROMEXPORT, Russia including contract management, design management, planning and coordination, testing & commissioning of the hydromechanical works.
  • Nominated as Employer's Representative under the provisions of the contract for taking over of the competed hydromechanical works.

Manager (Civil) at Indira Sagar Project

NHDC Limited
Punasa, District Khandwa, Madhya Pradesh
07.2002 - 03.2004
  • Responsible for Contracts and Procurement functions at the Project, concurrently functioned as Manager (Technical) in the Projects' office; Responsible for technical scrutiny of proposals, technical estimation of works, costing and technical sanction, tendering, evaluation and award of works contracts, progress monitoring and review, construction scheduling, site inspection, coordination with consultants viz. Design department of NHPC Limited for hydromechanical works, local liaising & coordination etc.
  • Responsible for fabrication & erection of hydro-mechanical works at Site including 20 No. (20x17m) crest type spillway radial gates of Indira Sagar Project.

Manager (Civil) at NHDC (A JV of NHPC & Govt. of MP)

NHDC
Bhopal, Madhya Pradesh
04.2001 - 07.2002
  • Design & Engineering Department, Coordinated with CWC Narmada Sagar Directorate & Gate Directorate for designing of Civil & HM works of Indira Sagar Project
  • Subsequently hired STUP Consultants India Pvt Ltd for remaining designing & drawings work of Concrete Dam Spillways.
  • Worked as AMR for implementation of ISO 9001 QMS Certification for NHDC Corporate office Bhopal.
  • Contracts & Procurement functions of NHDC Limited including preparation of bid documents of several major works contracts, ICB tendering, bid evaluation and award, local procurement for establishing NHDC corporate office at Bhopal etc.

Deputy Manager (Civil) at NHDC (A JV of NHPC & Govt. of MP)

NHDC
Bhopal, Madhya Pradesh
09.2000 - 03.2001
  • Prepared bid document for major hydromechanical and electromechanical packages for Indira Sagar Project.
  • Tendering and techno-commercial eventuation of bids.
  • Implemented ISO 9001:2000 QMS for NHDC Limited, Bhopal.

Deputy Manager (Civil) at Design and Engineering Division at NHPC Corporate Office

NHPC Limited
Faridabad, Haryana
07.1996 - 09.2000
  • Planning and Designing of Hydro-Mechanical equipment including gates and penstocks/ steel liners of pressure shaft, technical specifications, tender drawing, DPR cost estimation etc.

Assistant Manager at Design and Engineering Division

NHPC Limited
Faridabad, Haryana
07.1992 - 06.1996
  • Planning and Designing of Hydro-Mechanical equipment including gates and penstocks/ steel liners of pressure shaft, technical specifications, tender drawing, DPR cost estimation etc.

Engineer (Civil) at Tanakpur Power Station

NHPC Limited
Banbassa, District Nainital, Uttarakhand
11.1987 - 06.1992
  • Construction of hopper type silt ejector and concrete lined open power channel including all civil and hydro-mechanical works.
  • Coordination with design department, contract management, quality control, construction scheduling, survey & layout of the works, land acquisition, local liaising and coordination etc.

Education

Bachelor of Engineering (B.E.) - Civil Engineering With Honors

University of Roorkee (Now IIT Roorkee)
Roorkee
07.1982 - 1986.06

Master of Technology (M. Tech.) - Structural Engineering

IIT Bombay
Mumbai, India
07.1986 - 1988.07

Master of Business Administration (M.B.A). - Financial Management

IGNOU
New Delhi
07.1992 - 1998.06

Advanced Diploma -1 Year - Alternative Dispute Resolution

NALSAR University of Law
Hyderabad, India
08.2023 - 2024.07

Skills

Project Management

Certification

Program Management Level-B, Project Management Associates, India - Mar2010-Mar-2015

Languages

English
Bilingual or Proficient (C2)
Hindi
Advanced (C1)
Bengali
Upper intermediate (B2)

Timeline

Advanced Diploma -1 Year - Alternative Dispute Resolution

NALSAR University of Law
08.2023 - 2024.07

Executive Director (ED) Regional Office- Teesta and Chief Executive Officer (CEO) of Lanco Teesta Hydro Power Limited

NHPC Limited
09.2021 - 05.2023

Chief Executive Officer of Lanco Teesta Hydro Power Limited-LTHPL

Lanco Teesta Hydro Power Limited-LTHPL (WOS)
02.2021 - 09.2021

General Manager at Design & Engineering Department

NHPC Limited
11.2018 - 02.2021

Chief Engineer (Civil) at Design and Engineering Department

NHPC Limited
01.2017 - 11.2018

Chief Engineer (Civil) at Design and Engineering Department

NHPC Limited
11.2013 - 12.2016

Chief Engineer (Civil) at Teesta Low Dam Project-Stage-III

NHPC Limited
02.2012 - 10.2013

Chief Engineer (Technical) at CMD Office

NHPC Limited
08.2008 - 02.2012

Chief Engineer (Technical) at Director (Projects) Office

NHPC Limited
02.2008 - 08.2008

Senior Manager (Technical) at Director (Projects) Office

NHPC Limited
09.2006 - 08.2008

Senior Manager (Civil) at Corporate Project Monitoring & Support Group (CPMG)

NHPC Limited
04.2006 - 09.2006

Senior Manager (Civil) at Indira Sagar Project

NHDC Limited
01.2004 - 04.2006

Manager (Civil) at Indira Sagar Project

NHDC Limited
07.2002 - 03.2004

Manager (Civil) at NHDC (A JV of NHPC & Govt. of MP)

NHDC
04.2001 - 07.2002

Deputy Manager (Civil) at NHDC (A JV of NHPC & Govt. of MP)

NHDC
09.2000 - 03.2001

Deputy Manager (Civil) at Design and Engineering Division at NHPC Corporate Office

NHPC Limited
07.1996 - 09.2000

Assistant Manager at Design and Engineering Division

NHPC Limited
07.1992 - 06.1996

Master of Business Administration (M.B.A). - Financial Management

IGNOU
07.1992 - 1998.06

Engineer (Civil) at Tanakpur Power Station

NHPC Limited
11.1987 - 06.1992

Master of Technology (M. Tech.) - Structural Engineering

IIT Bombay
07.1986 - 1988.07

Bachelor of Engineering (B.E.) - Civil Engineering With Honors

University of Roorkee (Now IIT Roorkee)
07.1982 - 1986.06

Executive Director (Arbitration)

NHPC Corporate Office
5 2023 - 12.2023

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Accomplishments

  • Empanelled as a Dam Safety Technical Expert by National Dam Safety Authority.
  • Co-authored a technical paper on "Intervention in existing Spillway Gates by providing Flap type Radial gate to negotiate floating trash" presented at ICOLD Symposium held in February 2021, New Delhi
  • Overtopping of Poringalkuthu Dam, KSEB Kerala - Member of Independent Panel of Experts (DSRP) constituted by Kerala State Electricity Board (Feb. 2019) - Report on Restoration Measures (Short term) and Enhancement of Spillway Capacity (Long term) of Poringalkutthu Dam (commissioned in 1957) on river Chalakkudi in Distt. Thrissur, Kerala.
  • Investigation of Penstock Rupture and Resultant Flooding of Kopili Powerhouse (200 MW) in Assam - Member of the Committee constituted by CEA - Scope was to identify reasons of rupture/ Penstock failure (Oct.2019) & resultant Powerhouse flooding and Remedial measures to be taken in short term/ medium term/ long term for early restoration of the power station and to avoid future recurrence of such incidents. Report of the Committee submitted to CEA.

Training

  • General Management Programme, MDI Gurgaon
  • Strategic Brand Management Programme, IIM Bangalore
  • Winning Habits of Effective People, IIM Ahmedabad

Membership of professional bodies

  • Fellow Member (F.I.E.) of Institution of Engineers (India) & Chartered Engineer
  • Life Member of Indian Institute of Public Administration, New Delhi
  • Life Member - Administrative Staff College of India, Hyderabad
  • Certified Senior Project Manager (Level-B) – Project Management Associates (Indian member of International Project Management Association)

Last employer

NHPC Limited (now a  Navaratna CPSU under Ministry of Power, Govt. of India)

Last emoluments per month

Rs. 5.0 Lakhs plus Performance Related Pay plus Company Car plus Medical benefits

Summary of work experience

Professionally qualified and experienced in the field of Civil Engineering with specialization in hydropower sector; working for over 36 years in the largest premier public sector hydro power utility of India;Field experience in execution of civil engineering & hydro-mechanical works; worked in design & engineering department of NHPC for over 15 years; experience in planning, execution & monitoring of hydropower projects;Visited various countries in Europe/ Africa & Bhutan for on-site inspection of equipment/ technical meetings/ Project appraisal, due diligence etc.;Experience as hydro-mechanical expert on several erstwhile Dam Safety Review Panels and Committees constituted by CEA, Govt. of India, KSEB, Kerala; Participated as a member of DSRP constituted for the periodic inspection and review of the Dam and appurtenant works of Chamera-I, Chamera-II, Bairasiul and Uri-I Power Stations of NHPC Limited;Worked in office of Director (Projects) NHPC and as Chief Engineer (Tech) to CMD NHPC for about six years; dealt with techno-commercial, contractual and regulatory issues concerning hydropower projects of NHPC, a premier CPSU; successfully coordinated PR activities and interactions with industry associations, IPO related roadshows, coordination with state government departments, MOP/ CEA/CWC/CERC, visits of parliamentary committees etc.;As Head of the Project, responsible for execution of 500MW Teesta-VI Hydro Electric Project in the State of Sikkim (INR 57.48 billion); functioned as Engineer-in-charge for all major works contracts of the Project; transmission line, project construction including twin tunnels each of 10.8m finished diameter in fragile Himalayan geological conditions; procuring CAR/EAR insurance policies for the mid-term project in a high risk zone with approx. sum INR 50 billion.As CEO of LTHPL (a wholly owned subsidiary of NHPC Limited) having authorized share capital of INR 25 billion; engaged with all stakeholders in connection with taking over a financially stressed asset, for the first time ever by a CPSE in India and successfully moving forward with the execution of a stalled hydro project involving design interventions, award of major civil, hydro-mechanical & electro-mechanical works contracts, raising of debt financing, environmental, statutory & other compliance related issues etc.;As Executive Director & Head of Siliguri/ Teesta Region of NHPC Limited, involved with technical, regulatory, administrative, risk & safety related issues, public relations and liaising with State Governments & District Administration;Responsible for all NHPC operations in the states of Sikkim, West Bengal & Manipur; total 967 MW hydro generating stations under operation, 500 MW hydro project under construction and 520MW hydro project under Stage-Il forest clearance.

Significant contributions

  • Fabrication & erection of large sized dam spillway radial gates involving about 6000MT of steel works at Indira Sagar Project (8X125MW) in MP carried out during 2003-2005 at the site itself using innovative means, thus saving about 20% of the cost and delivering the Project within planned schedule.
  • Introduced the innovative idea of providing flap type radial gates in dam spillways for efficient management of floating trash & debris in hydro project reservoirs, thus enhancing the generation by about 10% in the monsoon months.
  • Introduced an innovative arrangement in existing hydro power projects for release of environmental flows on continuous basis from the dam spillways pursuant to Court orders, which have been subsequently adopted by various other dam owners/ power utilities.
  • Successfully negotiated owner driven CAR/ EAR insurance policies for Teesta-VI Project (4X125MW) in Sikkim, which was a mid-term stressed asset; total premium INR 14.5 billion.
  • As an Executive Director & CEO, provided leadership to a multidisciplinary team of about 700 hydropower professionals and achieving the assigned tasks/ goals successfully.

Professional training programmes attended

  • General Management Programme for NHPC Executives (Mar. 2007) — MDI Gurgaon
  • Programme Title: Strategic Brand Management for NHPC (Dec. 2015) - IIM Bangalore
  • Programme on Winning Habits of Effective People for NHPC (Mar. 2018) - IIM Ahmedabad

Professional research innovative measures

  • Pursuant to Court orders for release of e-flow from existing dams & barrages, an innovative, simple and cost-effective solution for release of e-flow from the spillway gates by providing steel blocks under the gate was devised in 2020 and implemented in a time bound manner. This solution was successfully implemented at various power stations of NHPC and subsequently accepted by other hydropower utilities also.
  • Hydropower stations in the Himalayan region regularly face operational problems due to high quantum of floating trash particularly during rainy seasons. This trash gets accumulated in front of Intake structure, clogging the trash rack panels, causing reduced power generation due to head loss and also damages to the generating units. In dams with crest type gates such as in 690MW Salal hydroelectric project of NHPC, an innovative flap type radial gate was introduced in place of existing spillway radial gate with retrofitting and retaining major supporting structures of the gates. The flap type opening over the main gate proved to be more efficient in flushing the incoming floating trash & debris without the need of opening/ raising the main gate.

Visits abroad

  • Germany, Pre-dispatch inspection of hydraulic dam gate cylinders of Indira Sagar Project (8x125 MW) at Montan Hydraulik GmbH, October 2003
  • Russia, Review meeting of Hydro-Mechanical works of Indira Sagar Project with the Vice-Minister In-charge, Govt of Russia and President, "FGUP VO TECHNOPROMEXPORT" (A Russian Govt. Enterprise) at their headquarters in Moscow; also visited Volga Hydroelectric Power Station (2,671 MW) built over River Volga in Volgagrad, Russia, April 2004
  • Netherlands, Pre-dispatch inspection of hydraulic intake gate cylinders of Omkareshwar Project (520MW) at M/s Rexroth/ Hydrodyne, December 2005
  • Germany, Pre-dispatch inspection of hydraulic cylinders for barrage gates of Teesta Low Dam Stage-III (132MW) at M/s Montan Hydraulik, December 2007
  • Hongkong & Singapore, Post-IPO Road Show after listing of NHPC Limited (Sep.2009) and interaction with potential investors/ Fl Is, November 2011
  • Democratic Republic of Congo (DRC), Africa, Due diligence of Grand Katende Hydroelectric Project (4x16MW) in Kasai-Central Province, financed by Govt. of India through Line of Credit facility by EXIM Bank, September 2016
  • Bhutan, Site inspection of ongoing works at Mangdechhu H.E Project (4x180 MW) under the technical consultancy assignment undertaken by NHPC Limited, September 2018

Religion

Hinduism

Personal Information

  • Date of Birth: 12/12/1963
  • Nationality: Indian