Accomplished Project Manager with over 16 years of experience in coal-based thermal power plants. Specializing in project execution, maintenance, erection, and commissioning of units ranging from 50 MW to 600 MW. Demonstrated success in leading both Greenfield and Brownfield projects, managing budgets of ₹200 Cr. Ensuring operational efficiency, regulatory compliance, and cost optimization. Proven track record of delivering complex projects while implementing process enhancements, safety improvements, and automation initiatives. Skilled in stakeholder collaboration, vendor negotiations, and team leadership to drive high-performance operations.
• Led engineering & execution of coal-based power plant expansion for a 5MTPA Alumina Refinery.
• Spearheaded contract finalization and execution of Electrical & Instrumentation works.
• Prepared tender documents for vendor participation, ensuring smooth commissioning of the Brownfield project within budget and timelines.
• Played a vital role in equipment assessment, refurbishment, and overhauling of 33Kv, 6.6KV & 415V switchgears, oil transformers, successfully commissioning equipment unused for 12 years.
• Finalized technical specifications of all Electrical & Instrumentation (E&I) packages in collaboration with consultants, ensuring compliance with industry standards, operational efficiency, and seamless integration with plant systems.
• Defined instrumentation requirements, including system specifications, design reviews, process control architecture, and integration of DCS, PLC & SCADA systems for optimized power plant performance.
• Finalized switchyard design, procured all required equipment, executed the switchyard project, secured regulatory approvals, and coordinated with OEMs for successful commissioning.
• Initiated and successfully commissioned the CILMS system at the Power Plant and Refinery, ensuring blackout prevention, improving system reliability, and enhancing operational efficiency.
• Led panel refurbishment including spare identification, bus bar fabrication, functional checks, and relay testing, ensuring optimal performance and reliability of electrical systems.
• Retrofitted ESP TRCC panels from Chinese controllers to EPIC III controllers, improving ESP performance and ensuring compliance with emission guidelines.
• Implemented safety standards and developed proactive safety mechanisms to achieve zero reported incidents across power plant operations.
• Fostered a culture of safety through active participation, employee training, and adherence to industry best practices, ensuring compliance with regulatory safety requirements.
• Led integration of automation systems with SCADA & PLC platforms, enhancing operational monitoring and improving data-driven decision-making.
Project management expertise