Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic
Sk mehtab ali

Sk mehtab ali

Supervisor
Kolkata

Summary

Fabrication Supervisor managing fabrication planning, material readiness, and manpower coordination for pressure vessels, storage tanks, heat exchangers, steel structures, and MS/SS piping. Oversees fabrication of IBR-approved boilers up to 5 ton while aligning shop activity with drawing, quality, and delivery requirements. Keeps production moving by arranging raw materials from store and coordinating crews across multiple fabrication jobs.

Overview

1
1
Certification
23
23
years of professional experience

Work History

Fabrication supervisor

Par enterprises pvt Ltd
05.2009 - Current
  • Supervise [number] fabrication jobs weekly across pressure vessels, storage tanks, heat exchangers, and structural steel.
  • Coordinate raw material flow from store for pressure vessel, boiler, and MS/SS pipeline fabrication.
  • Monitor welding and fabrication work on pressure vessels, storage tanks, heat exchangers, and steel structures.
  • Support IBR-approved boiler fabrication up to 5ton through job planning and shop-floor coordination.

Structural foreman

Hidada construction company pvt Ltd
04.2007 - 10.2009
  • Managed [number] structural assemblies per shift, including columns, beams, and pipe towers.
  • Fabricated building structures, columns, beams, pipe towers, hoppers, conveyor lines, and plate work.
  • Applied welding and quality inspection standards across structural steel and plate fabrication work.
  • Planned work sequences for structural jobs to keep fabrication moving across active site demands.

Foremen

Project equipment manufacturing company
01.2006 - 08.2007
  • Supervised [number] fabricators per shift across structural steel, columns, beams, and tank work.
  • Directed fabrication of structural steel components, including columns, beams, and heavy plate assemblies.
  • Oversaw welding activities and shop execution for tanks and other heavy fabrication jobs.
  • Managed raw material planning and issue control to support uninterrupted fabrication workflow.
  • Performed quality inspections on finished work to verify fit, alignment, and fabrication standards.
  • Scheduled daily work across building structural, column, beam, and tank assignments to support timely delivery.

Fabrication Supervisor

Prime tharmax
01.2004 - 11.2004
  • Supervised boiler fabrication crews and aligned daily work with project scheduling requirements.
  • Performed quality inspection on welded assemblies to confirm fabrication standards before handoff.
  • Managed raw material planning for fabrication work and kept crews supplied with needed components.

Education

Class 12 - Higher secondary education

Dum dum airport hindi high school
Kolkata, West Bengal
01-1998

Skills

Welding

Fabrication supervision

Pressure vessel fabrication

Boiler fabrication

Raw material planning

Structural steel fabrication

Workforce planning

Material coordination

Quality inspection

Project scheduling

Manpower allocation

Production reporting

Certification

diploma

Timeline

Fabrication supervisor

Par enterprises pvt Ltd
05.2009 - Current

Structural foreman

Hidada construction company pvt Ltd
04.2007 - 10.2009

Foremen

Project equipment manufacturing company
01.2006 - 08.2007

Fabrication Supervisor

Prime tharmax
01.2004 - 11.2004

Class 12 - Higher secondary education

Dum dum airport hindi high school
Sk mehtab aliSupervisor