Fabrication Supervisor managing fabrication planning, material readiness, and manpower coordination for pressure vessels, storage tanks, heat exchangers, steel structures, and MS/SS piping. Oversees fabrication of IBR-approved boilers up to 5 ton while aligning shop activity with drawing, quality, and delivery requirements. Keeps production moving by arranging raw materials from store and coordinating crews across multiple fabrication jobs.
Overview
1
1
Certification
23
23
years of professional experience
Work History
Fabrication supervisor
Par enterprises pvt Ltd
05.2009 - Current
Supervise [number] fabrication jobs weekly across pressure vessels, storage tanks, heat exchangers, and structural steel.
Coordinate raw material flow from store for pressure vessel, boiler, and MS/SS pipeline fabrication.
Monitor welding and fabrication work on pressure vessels, storage tanks, heat exchangers, and steel structures.
Support IBR-approved boiler fabrication up to 5ton through job planning and shop-floor coordination.
Structural foreman
Hidada construction company pvt Ltd
04.2007 - 10.2009
Managed [number] structural assemblies per shift, including columns, beams, and pipe towers.
Fabricated building structures, columns, beams, pipe towers, hoppers, conveyor lines, and plate work.
Applied welding and quality inspection standards across structural steel and plate fabrication work.
Planned work sequences for structural jobs to keep fabrication moving across active site demands.
Foremen
Project equipment manufacturing company
01.2006 - 08.2007
Supervised [number] fabricators per shift across structural steel, columns, beams, and tank work.
Directed fabrication of structural steel components, including columns, beams, and heavy plate assemblies.
Oversaw welding activities and shop execution for tanks and other heavy fabrication jobs.
Managed raw material planning and issue control to support uninterrupted fabrication workflow.
Performed quality inspections on finished work to verify fit, alignment, and fabrication standards.
Scheduled daily work across building structural, column, beam, and tank assignments to support timely delivery.
Fabrication Supervisor
Prime tharmax
01.2004 - 11.2004
Supervised boiler fabrication crews and aligned daily work with project scheduling requirements.
Performed quality inspection on welded assemblies to confirm fabrication standards before handoff.
Managed raw material planning for fabrication work and kept crews supplied with needed components.