Assistant Site Engineer
- Outdoor-Cable laying, Point Installation, Track circuit Installation etc
- Indoor-Interface wiring, Relay rack Installation, K-rack installation
- Bell test
Working at Alstom as a Scheme plan designer deputed by cyient. At cyient . At cyient work as Rail signalling design engineer for 3 years . Having 2year 6 month of Experience at site for installation and site management. Also having post graduate diploma in Railway signal and telecommunication from Ms Ramaih University of applied sciences. Learnt various Signaling Concepts, acquiring thorough understanding of basic Rail Signaling principles, Basics of Railway Signaling Design in various Customers’ standards. Experienced in Indoor and outdoor installation, Interface designing (As Built)
Working with Surat Mainline and DCS work for Lucknow. Checking of Dubai
Autocad
undefinedAlstom /Jan2024 , Deputed By Cyient
Designation-Scheme plan Designer
Project-Surat Mainline,DCS lucknow
Cyient ltd /Aplil 2021Designation: Design Engineer
Client: Siemens COE, Thales Canada Team, Hitachi Rail India
Project: For Indian Railway Projects Duration: 2Year 10 Month Siemens Coe- Dcafe Training
A. Thales Canada Team: Projects:As a Rail signaling Engineer Supported Thales Canada team for various projects globally. Followed Design Control Process, Good Working practices and Guidance documentation.
Dubai – In Dubai Project, I have supported the team in updating the As Built designs for the Project Closure.
EWL – It is a Hong kong based metro project on CBTC. In this project I have updated the Decommissioning design(Red & green) by using micro-station .
Finch – In this project, I was working on SLD update, Point Update, LCP (Local control panel), WRU update etc. I have completed the book-wiring (As Built). Also I have made Release audit before the delivery date to the client. Here I develop my competency by using Auto-cad.
FLNY- Here ,I develop my competency by using Micro-station.
B. Hitachi Rail India Team: Projects: Project Name- Morarpur, Pedaperiya,BDY, BART Client Name- Hitachi
Role- Designer
Responsibilities:
· Baseline Preparation for Interface circuits as per SIP
· Gear List Preparation and Bit chart Preparation as per SIP
C. Hitachi Offshore : Team:Project Name- BART DCS fiber Splicing Design, LIRR _3RD_Track_ AIS, SEPTA Client
Mrt Signals Ltd/June2016 to Jan2018 - Assistant Site Engineer, 1 year 6month, Railway Projects, Kota (WCR):, i) Outdoor-Cable laying, Point Installation, Track circuit Installation etc, ii) Indoor-Interface wiring, Relay rack Installation, K-rack installation, iii) Bell test
Param Enterprise Pvt Ltd/JAN2018 to Feb 2019- Site Engineer, 1Yrs,
VSp steel Plant and Hajipur Bachoara, i) Outdoor-Cable laying, Point Installation, Track circuit Installation etc, ii) Indoor-Interface wiring, Indoor Installation, iii) Bell test and site management etc