Professional Summary:
Architect with 3 years of Working Experience in BIM and multidisciplinary projects and experience in handling BIM Model Creation, Complying Design with Project BIM Standards and BIM Execution Plans and Scan to BIM Projects. Developing and managing clear BIM Execution Plans, BIM Implementation Strategies and BIM Technologies for active projects and also assisting in developing and enforcing BIM documentation and workflow process. Creation and execution of detail drawings while maintaining the accuracy and quality of construction.
BIM Platform- Revit, Bim360
1 HOTEL ALVISO @TERRA, SAN JOSE:
Hotel Alviso is a combined industrial/commercial building occupying 271,533 SQ.FT(6.2 AC) with 2 levels, scope of work is to produce shop drawing for CD set. Client for this Project was CORBEL Architects, LA
Roles & Responsibility:2 New Children's Hospital(2019~2021), Dublin Ireland.
The project covers the construction of the 224 beds children's hospital in the area of 1776045.22 sq ft in Dublin, Ireland. Client for this project was Jones Engineering Group.Scope was defined as 3D model, shop drawings, BWC, Coordination, Hangers, Equipment and materials, module sheet.
Role & Responsibility:3 Wembley Park, London, United Kingdom By Bradley-Hole Schoen ich Landscape
It is mixed used Building in which Architectural Model was provided by the client. Our scope of work is to develop landscape model with accurate coordinates.
Roles & Responsibility:4 Cuaso Design Studio, USA
5th street creative office is an office building which consists of 4 floors. The scope of work is to develop LOD300 model from Scratch and complete the overall set of drawings.
Aquarena Lot 1 is a commercial project which is a PEMB structure building. The scope of work is to develop LOD300 model from Scratch and complete the overall set of drawings.
Z tejas is a Restaurant Project which is a wooden structure building. The scope of work includes architectural 3d modelling and 2d drawing.
Roles & Responsibility:5 TCHC Retrofit - 91 Augusta St By BSN Architects, Canada
TCHC Retrofit is a residential Apartment building of 14 floors, it was a renovation project . Scope of work is to develop LOD300 model of Retrofit phase with reference to existing phase.
Roles & Responsibility:6 ECC Hospital, Singapore.
This Hospital project is considered as the iconic project in Pinnacle, it is the first Singapore hospital project. Project Area is 2,161,931.00 sq ft. with 27 levels including 4 basements. It’s a orthopedic plus dental hospital building. Our scope of work is 3D Modeling,Shop drawing,COBie/Facility Management,As-built upgradation. This project is divided in several packages i.e. WSO(Wall setting out), Room book creation, Block wall elevation and RCP.
Role & Responsibility :