

Successfully managed to produce cost effective design and drawings in all projects assigned to me like Metro, DFCC railway, Highways, Airport connectivity and buildings from pitch to completion. Good Experience in Proof checking as a GC/Authority as per codal requirements and with independent calculations. Preparation of tender drawings and design for government tenders to support the BOQ/DBR. Have experience in the preparation of condition survey report of the structures for existing alignment or proposed alignment for feasibility report preparation. Have acted as an authority engineer for the Highway Bridges. Have exposure towards AASHTO LRFD & ACI design codes. Worked with the KSA DDC (RGCK) for 30% to 100% design submissions and approval for Saudi Government highway projects. Coordination with the Planning team for effective time management. Managing team of 3 to 8 engineers and 3 draft persons. Attending kick off or review meet, ensuring contractual & statutory compliance by proactive, effective & continuous communication with clients and contractors. Strategic Senior Manager known for productivity and efficiency in task completion. Skilled in leadership, operational strategy, and financial management. Excel at communication, problem-solving, and adaptability to drive team success and achieve organizational goals.
Led the design of the underpass for the taxiway, including considerations for aircraft and road loadings, retaining walls, closing abutments, and elevated support structures.
Project: Design & Construction of Civil, Building & Track Works for Double Line Railway involving Formation in Embankments/Cuttings, Bridges, Structures of JNPT-Vaitarana Section of Western Dedicated Freight Corridor (Phase-2) 102km Stretch (Civil, Building & Track Works Contract Package - 11, ICB No. CTP-11) with estimated cost of INR 29.49 Bn.
Project: Line 9, Line 7A of Mumbai Metro Rail Project. Total length of these metro lines is 13.581 Km running from CSIA Airport to Andheri & from Dahisar to Mira-Bhayander with 9 elevated stations and 1 underground station estimated cost of INR 66.07 Bn.
Project: Proof Checking for Detailed Structural design of Viaduct of Reach-2 for Pune Metro Rail Project.
I hereby declare that the information provided by me is true to the best of my knowledge., Bengaluru, India, 15-02-2026