Accomplished Piping & Equipment Design professional with 23 years of experience in Oil & Gas and Chemical Process Plants. Skilled Lead Piping Designer and Sr. Isometric Checker proficient in analyzing P&IDs, PFDs, PMS, Mechanical Datasheets, and Equipment Layouts to develop precise Piping Layouts. Successful in creating Pipeline Routes through detailed study of Area Plot Diagrams. Strong background in quality assurance and compliance, with a focus on detail and effective problems solving. Known for promoting team collaboration and delivering dependable results.
Overview
23
23
years of professional experience
1
1
Certification
Work History
ISOMETRIC CHECKER
Jacobs Engineering PVT LTD.
10.2024 - Current
Client: FUZI CHEMICALS
Role: ISOMETRIC CHECKER
Responsibilities:
1. Isometric Checking
2. Co ordinating with designers and updating the isometric comments and Issuing IFC Isometrics as per weekly Target
Client: NOVO
Role: ISOMETRIC CHECKER
Responsibilities:
1. Isometric Checking
2. Co ordinating with designers and updating the isometric comments and Issuing IFC Isometrics as per weekly Target
ISOMETRIC CHECKER
AR Technologies & consultancy (HYDERABAD)
11.2023 - 09.2024
1) Project Name: SWING
Plant: ABUDHABI (ADNOC)
Unit: RDS1,RDS6,BCDS PACKAGE-9 WATER INJECTION CLUSTERS
Software Used: Navisworks
Responsibilities:
1. Preparation of Model for 60% Model Review
2. Checking of Vendor Drawings
3. Co ordinating with Designers for better routing possibilites
4. Isometric Checking.
5. Deliverable responsibility of Initial GAD.
6. IDC checking.
2) Project Name: PHRC
Plant: NIGERIYA
Unit: TANKFORM
Software Used: Navisworks
Responsibilities:
1. Overal project Co ordination with around 10 Team Members.
2. Dealing Technical Quires with Client.
3. Work Planning and assigning work to Designers.
4. Isometric Checking.
5. Weekly Deliverable responsibility of Isometrics.
6. Co ordinating with Stress team.
7. Preparation of Input for Stress Team.
8. Overal Design co ordination as per Project Standards.
Overall Responsibility of Tank form area of PHRC project. This project is a revamp Project.We will receive Laser Scan data from Client. We will convert this into R3D and will be modelled as per Laser scan data and Latest P&ID.After Modelling we will do Isometric checking and will Issuie the Isometrics for Hydrotest to Client. All Replaced Equipment and related Piping should be Issued for Construction and all remaining Isometrics will be Issued as Issued for Hydrotest.
FIELD ENGINEER AND SITE CO ORDINATER
TTSJV W.L.L - BAHARAIN
05.2023 - 07.2023
I have worked as a Field Engineer cum site Co Ordinator for BAPCO MODERNIZATION PROJECTIn Bahrain for 3 months.I have been involved in resolving the piping site technical quires of BPCO project with construction team. Quires related to routing mismatch and miss alignment of Piping Isometrics and Spool drawings and Materials. And updating the routing as per Site requirement as per design Standards. Checking of Test packs as per Latest P&ID and Model. Giving comments on Test packs .
Preparing of FER'S and PCN'S as per Site Requirement and getting approval from Client BAPCO.
UNIT LEAD & ISOMETRIC CHECKER
Anewa Engineering pvt Ltd.
05.2021 - 04.2023
Project Name: SOCCAR
Plant: SAUDI
Unit: GHT
Software Used: Navisworks
Project Name: SMS INDIA (STEEL PLANT)
Plant: INDIA
Unit: PIPIE RACK AND PUMP HOUSE
Software Used: Navisworks
Principal Designer & Isometric Checker
Valdel Engineers & constructors (INDIA)
03.2011 - 04.2021
Project Name: RASTANURA
Plant: SAUDI
Unit: REVAMP UNIT-30,34,J06
Software Used: SP3D VERSION-2014.
Project Name: PETRONAS
Plant: MALAYSIA.
Unit: CNHT-CROCKED NAPTHA HYDROTRETOR.
Software Used: SP3D VERSION-2014.
Project Name: JAZAN
Plant: SAUDI ARABIA
Unit: HYDROCRACKER UNIT
Software Used: SP3D 2014
Project Name: SRU
Plant: KAJAKISTAN.RASSUIA.
Unit: SULFER RECOVERY UNIT.
Software Used: PDS and Micro Station
Project Name: IOCL
Plant: PARADEEP, ORISSA.
Unit: PIPE RACK
Software Used: PDS and Micro Station
Project Name: TUPRAS
Plant: TURKEY
Unit: SRU
Worked as a Design Engineer and Checker for SRU Unit Big bore and small Bore piping.
Responsibilities:
Equipment Modeling.
Flare Knockout drum Elevation fixing and Inlet ,outlet Pipe Nozzles elevation fixing ad routing .
Providing comments for all MDS drawings of all Horizontal vessals and Vertical Vassals.
Loading drawings.
Preparing Nozzle orientation drawings for columns, Vassals.
Critical Lines Routing.
Sour Water Stripper and DEA Regeneration Column Piping.
Finalizing Battery Limit points with Interconnecting Unit Areas.
Updating Model review comments.
Updating as per Latest P&ID and generating Isometrics with Latest Updates.
Interacting with clients to finalize the Hold Items.
Work assignment for 4 Designers.
Design and Routing guidance to Designers.
Interacting with clients to finalize the Hold Items.
Participating in Model review meetingsProvide from month year to month year, employer name.
Piping Engineer
TECHNICAS REUNIDAS (SPAIN-Madrid)
12.2008 - 11.2010
Company: TECNICAS REUNIDAS GROUP
Project Name: HELIP- GREECE
Unit: Flexicoker Unit-32
Plant: GREECE
Software Used: PDS and Micro Station.
Responsibilities:
Worked in Flexi coking unit (latest technology of coking process) for GreeceHellenic Petroleum. By Flexi coking technology we can reduce the percentage of low value petroleum coke and increase the high value petroleum products like gasolineDiesel and Flexi Gas. The licenser of flexi coking is EXON MOBILE.
Flexi coking is the latest coking technology in which fluid coke is gasified with High pressure steam and air. Reactor side yields are similar both delayed coking and Flexi coking process. In Flexi coking Grassfire is used to produce clean fuel gas called Flexi gas.
Critical line routings like Flare lines etc.
Utility line routing like cooling water supply ,return ,steam lines condensate lines
Portable water lines, Instrument Air and Plant Air lines.
Column, Pump, Exchanger, AIR Cooler Piping.
Equipment modeling and Nozzle orientation, Platform elevations.
Providing input to Mechanical for location of ladders, piping supports, cleats & platforms.
Supports showing for piping using with Logical & physical supports through Pds piping model, And also using with pds Equipment modeling..
Special support marking and providing sketches to civil (strl) dept. for special structural supports.
Providing Isometrics (input) for stress calculation and co-ordination with them for modification of pipe routing & relocation of supports
Clash checking using with pds piping model after running the class report.
Providing input to civil for platform modeling, special supports modeling etc.
Control valves, PSV's, FE, LG, LT and other instruments are modeling using with pds piping model.
Isometrics extraction using PDS Isogen.
Connecting Battery limit Lines.
Sr.Piping Designer
BECHTEL INDIA PVT LTD.(INDIA-Delhi)
06.2007 - 11.2008
Project Name: MOTIVA-CEP
Plant: HOUSTAN U.S.A
Software Used: PDS and Micro Station.
Responsibilities:
Taken total responsibility of RACK area of VPS 5 UNIT.Involved in studying of Engineering Flow Diagrams, Routing of Pipes as per the system requirements using EFD's , Extraction of Isometrics using Isometric Drawing Manager from PDS.
Piping Engineer
RELIANCE PETROLIUM LTD.(INDIA-Mumbai)
08.2005 - 05.2007
Project Name: JERP
Plant: RPL, Jamnagar
Unit: Aromatics, V.G.O
Software Used: PDS and Micro Station
Responsibilities:
Involved in studying of Engineering Flow Diagrams, Routing of Pipes as per the system requirements using EFD's , Extraction of Isometrics using Isometric Drawing Manager from PDS.
Big and Small bore routing using P&ID
Manifold placement and LS LC routing.
Steam Trap placement and LS LC routing
Equipment modeling and Nozzle orientation, Platform elevations
Interphase checking.
Cad Engineer
KABSONS GAS LTD.(INDIA-Hyderabad)
06.2002 - 07.2005
Responsibilities:
Preparation of tool drawings ,part drawings, assembled drawings of L.P.G Valves and regulators in autocad-r14 and maintaining of ISO documents and Formats.
Education
High School Diploma -
SKPVN School
Nandyal, India
01.1997
Skills
Proficient in 3D piping design software
SMART Plant SP3D Administration from Inter Graph
Tray and nozzle orientation preparation
Vendor drawing review and feedback
Plot plan preparation
Effective management of pipe routing and support relocations
Project coordination with modelers
Interdisciplinary project coordination
Certification
[Area of certification] Training - SP3D Administration by Inter Graph
Languages
English, Hindi
Personal Profile
Name: SREEDHAR MODALA
Father's name: Late M.B. RANGA SWAMY.
Date of birth: 1977-06-28
Nationality: Indian.
Marital status: Married.
Passport: J7171024.
Permanent Address: FLAT NO :810, Tower 2,Marina Skies Green Hills Road,Moosapet. Hyderabad.-500050