Summary
Overview
Work History
Education
Skills
Contact
Timeline
Generic
Sreekantha

Sreekantha

Bangalore

Summary


Proffessional Summary: SAP PP Consultant is Arranging, leading and participating SAP team meetings (developers and support) on a frequent basis,Reviewing development efforts affecting existing functionality to understand integration and process impact Integration MM & QM. Strong knowledge in configuration of Master Data: Material Master, Bill of Material, Work center, Routing, Production Version, Supply area, Production Planning, Material Requirement Planning, Capacity Planning, Shop Floor Control, Interfaces PLM BMS Fiori NCR and MM Fiori.

Overview

13
13
years of professional experience
2012
2012
years of post-secondary education

Work History

Principal Consultant

Genpact
06.2024 - Current

Client GE Vernova

Product Owner (PP)

GE Power
10.2021 - 06.2024
  • Gathering requirements from end users and transforming requirements in to functional documents in RICEF components
  • Worked with PLM and BMS team to send the idocs from source PMx (SAP) to destinations as required by the business
  • Reviewed and proposed changes to the business
  • Enabled PMx(SAP) data to PLM thru a new channel
  • Closely worked with ABAP/BW team for the new enhancements
  • Post go live support and training document prepartion for the end users
  • AS-IS Studied entire business process of the client related to PP & QM with their interface
  • Business
  • Blueprinting Preparation of BBP documents based upon the inputs of AS-IS study.Analyzed Gaps and identified developments.Arranged process validation workshop
  • Realization phase Configured sap system for production.Prepared key data structure (KDS).Prepared UT script and tested with client.Created “functional specification” documents for object development and coordinated with technical team for development.Preparation of integration script and testing with all functional team.Test problem resolution
  • Final preparation & Go-Live Prepared user training manuals Uploaded data to quality / production & Training to end users
  • Handling tickets within the time period
  • Handling Queries extensively to accommodate various PP, PM & QM related requirements
  • Carrying out planning run and evaluating the planned order through stock requirement list
  • Preparation of various Functional Specifications for Z-Developments
  • Understand the Requirements of the Users, Make Changes if necessary

Functional

General Electric, SAP
01.2017 - 10.2021

· Worked as SAP Functional SME with GE Power.

· Hands-on work experience working for GE Aviation MRO project

· Designing test cases and functionalities to be tested for SIT/ UAT were taken care for each release cycles.

· Creation of test data for SIT/ UAT and regression for end to end MRO flows were handled.

· Later automation scripts were developed for the same using Worksoft thereby reducing the time spent on these activities.

· Hands-on work experience with configuration in GE Power project.

Material Planner

ICT SMS
06.2015 - 07.2016
  • Backorder handling for entire INDIA ASL’s along with escalation cases, coordinating wit RE team to meet the customer requirements
  • Planning for weekly replenishment Based on SS and BS availability at the Storage location (ASL)
  • Dismantling FG method to fulfill the child BOM requirements
  • Based on customer requirements to raise the PO and to buy the goods from Vendor, and follow up for ETD and ETA for Spare parts with Vendor

Planning Engineer

Deutsch is now TE connectivity
02.2014 - 06.2015
  • Data management
  • Master data updating that include creation of material master, bill of materials, routings etc
  • Extensively involved with MRP: Single item single level and multilevel planning, BOM explosion and MRP results, lot sizing, scheduling
  • Execution of shop floor activities including creation of orders, conversion of planned orders, order release, availability check, shop floor papers, and order confirmations, order information systems
  • Forecast loading based on customer inputs and planning of components
  • ATP checks (scope of availability check) and solving exception messages
  • Production planning and shipments w.r.t the customer requested dates and monitoring On-time-delivery
  • Planning activities
  • Plans and establishes production work schedule to meet delivery times and best utilize company production capacity
  • Initiate Material planning activity against forecast or order
  • Scheduling for materials and production in co-ordination with purchase and production using SAP-PP-ECC 6.0
  • Track actual production and inventory to better plan, and correct problems as required
  • Purchasing activities
  • Creation of purchase requisition and purchase orders as per the procurement plan to meet the customer requirement

Production and planning Engineer

BHAVANI INDUSTRIES
05.2013 - 02.2014
  • Profile: Manufacturer of Precision machined components
  • Planning, Quality and Production Management
  • Process Planning & Incoming inspection
  • Daily process Report of Production

Graduate Apprentice Trainee

BHARAT ELECTRONICS LIMITED
12.2011 - 11.2012
  • Worked in production control dept On SAP PP Module.
  • Gained knowledge on manufacturing parts, how to proceed towards finishing the part, operation flows using SAP-PP-ECC 6.0.
  • Launching Production Orders in time to meet the Delivery Schedule using SAP PP-6.0.
  • Follow up with suppliers for getting the item in time.
  • Coordinating with Quality Control Circles.

Education

Bachelor degree - Mechanical Engineering

R.Y.M.E.C, VTU University

Skills

    MRP

    Production Orders

    KANBAN

    In process inspection

    In coming inspection

    SAP QM basic settings

    Other / Non-SAP Skills

    Good Knowledge in MS Word, Excel, PowerPoint, Worksoft

Contact

Bangalore India

Timeline

Principal Consultant

Genpact
06.2024 - Current

Product Owner (PP)

GE Power
10.2021 - 06.2024

Functional

General Electric, SAP
01.2017 - 10.2021

Material Planner

ICT SMS
06.2015 - 07.2016

Planning Engineer

Deutsch is now TE connectivity
02.2014 - 06.2015

Production and planning Engineer

BHAVANI INDUSTRIES
05.2013 - 02.2014

Graduate Apprentice Trainee

BHARAT ELECTRONICS LIMITED
12.2011 - 11.2012

Bachelor degree - Mechanical Engineering

R.Y.M.E.C, VTU University
Sreekantha