Sreekumar M

Fire & Safety system
Nellaya-Via,KL

Summary

Results-driven professional with over 23 years of extensive experience in project execution, expediting, and implementing FM-approved Fire Fighting and Security Systems, including Fire Hydrant Systems, Wet and Dry Sprinkler Systems, and Fire Detection and Alarm Systems (PAS), as well as CCTV and Intruder Alarm Systems. Recognized for a proactive approach to planning and executing work schedules while effectively managing manpower, machinery, and materials to ensure project success. Committed to delivering high-quality results through meticulous attention to detail and strategic oversight. Proven ability to adapt to dynamic environments while maintaining a focus on safety and compliance standards.

Overview

24
24
years of professional experience

Work History

Senior Manager – Projects

Sobha projects & Trade Pvt Ltd
08.2017 - Current
  • Complete understanding of NFPA,FM global and other codes and standards of Fire Protection Systems.
  • Ability to implement a testing commissioning plan, method statements, testing and commissioning procedure, data sheets, testing criteria, testing commissioning reports as per FM global fire protection standard.
  • Ability to participate in Factory Mutual loss prevention auditing.
  • Experience in threaded and grooved joint piping, Electrical Panel and controllers testing commissioning, decide the pipeline laying methodology as per site condition.
  • Monitoring Grooving, Threading, Welding to avoid any defect.
  • Co-ordination with Engineering Department for Fabrication & Installation related problems.
  • Attending the review meeting with the management, client, consultant, architect, Loss prevention insuring agency, PMC.
  • Lesioning with the contractor for the project.
  • Vendor Evaluation & Vendor Development, Pre dispatch inspection & Expediting of Bought out Electrical & mechanical Items & Equipment’s like Panels, devices, pumps, etc.
  • Involved in Expediting of Pipes, long lead items, Fabricated parts as per Drawing & IS standards for the timely completion of project.
  • Executing the welding as per WPS & PQP.
  • Promoting the design change as per site condition to engineering.
  • Co-ordination with Site personnel & Solving of problems related Installation of Bought out items at site & Vendor’s Place.
  • Reviewing & get the work done as per QA-QC/ITP in the Site.
  • Expediting of the supply items for timely completion of projects.
  • Lessoning with External & Internal Agencies for the timely completion of project.
  • Coordinating with Fire force department regarding Fire NOC inspection and Fire clearance certificate.

Manager – Projects

Sobha projects & Trade Pvt Ltd
04.2012 - 07.2017
  • Experience in FM approved Fire protection system installation, testing & commissioning related works.
  • Complete understanding of NFPA,FM global and other codes and standards of Fire Protection Systems.
  • Ability to implement a testing commissioning plan, method statements, testing and commissioning procedure, data sheets, testing criteria, testing commissioning reports as per FM global fire protection standard.
  • Ability to participate in Factory Mutual loss prevention auditing.
  • Experience in threaded and grooved joint piping, Electrical Panel and controllers testing commissioning, decide the pipeline laying methodology as per site condition.
  • Monitoring Grooving, Threading, Welding to avoid any defect.
  • Co-ordination with Engineering Department for Fabrication & Installation related problems.
  • Attending the review meeting with the management, client, consultant, architect, Loss prevention insuring agency, PMC.
  • Lesioning with the contractor for the project.
  • Vendor Evaluation & Vendor Development, Pre dispatch inspection & Expediting of Bought out Electrical & mechanical Items & Equipments like Panels, devices, pumps,etc.
  • Involved in Expediting of Pipes, long lead items, Fabricated parts as per Drawing & IS standards for the timely completion of project.
  • Executing the welding as per WPS & PQP.
  • Promoting the design change as per site condition to engineering.
  • Co-ordination with Site personnel & Solving of problems related Installation of Bought out items at site & Vendor’s Place.
  • Reviewing & get the work done as per QA-QC/ITP in the Site.
  • Expediting of the supply items for timely completion of projects.
  • Lessoning with External & Internal Agencies for the timely completion of project.
  • Coordinating with Fire force department regarding Fire NOC inspection and Fire clearance certificate.

Asst Manager – Project

Sobha Projects and Trade Pvt Ltd
05.2009 - 03.2012
  • Fabrication & Erection of Fire hydrant & sprinkler system, Addressable Fire alarm system, VESDA early warning smoke detection system, Water leakage detection system.
  • Reviews contract requirement for project execution, Identify requirements and scope of work.
  • Review specifications process data sheet, material specification, Piping & instrumentation drawings/diagrams, GA drawings, Fire fighting layout drawings and other relevant documents.
  • Monitoring and controlling any site installation defects.
  • Identify and resolve discrepancies and divergences from original proposal through the investigation of technical queries to project/client.
  • Co-ordination with Engineering Department for Fabrication & Installation related problems.
  • Attending the review meeting with the client, consultant, PMC, management.
  • Coordinating with various sub contractors to ensure that there are no deviations or rework done.
  • Experience in the wet system piping projects, Fire Alarm System, Installation & Testing Commissioning, decide the pipeline laying methodology as per site condition.
  • Timely billing and collection.

Project Engineer

Sobha Projects & Trade Pvt Ltd.
12.2006 - 04.2009
  • Co-ordination with Engineering Department for Fabrication & Installation related problems.
  • Attending the review meeting with the client.
  • Identify and quantify the engineering deliverables, material Indenting, man-hour allocation, maintaining daily progress report.
  • Liasoning with the contractor for the project.
  • Attending site meeting.
  • Experience in the Fire hydrant and sprinkler system projects, Fire Alarm System, VESDA early warning smoke detection system Installation & Testing Commissioning, decide the pipeline laying methodology as per site condition.

Site Supervisor

Sobha Projects & Trade Pvt Ltd
06.2002 - 11.2006
  • Experience in Installation, Testing, Commissioning and Programming of Addressable Fire alarm system, Conventional FAS, Intruder alarm system, CCTV and Access control system, fire hydrant and sprinkler system.
  • End to end supervision of the project site.
  • Co-ordination with Engineering Department.

Skills

Project management oversight

Þ

Þ Site Management : Responsibilities in terms of monitoring the timely execution of project, Creating the planning & giving to contractors for timely completion, Monitoring the material management to avoid shortage of material when needed, expediting of the project in terms of material supply, on time payment problems, contractor and in house technician dealing, knowledge of MS Office

Þ

Installation engineering

Project planning

Scope management

Agile methodology

Client relationship management

Personal Information

  • Passport Number: AN066716
  • Date of Birth: 1982-05-26
  • ID Type: Passport
  • ID Number: AN066716

Profile Snapshot

A competent professional with 23+ years of experience in project execution, expediting, FM approved Fire Fighting and Security System (Fire Hydrant System, Wet & dry Sprinkler System & Fire detection and Alarm System/PAS, CCTV, Intruder alarm System). A proactive planner as per work schedule with skills in manpower, machinery and material management.

Roles And Responsibilities

Reviews contract requirement for project execution, identifying requirements and scope of work. Problem solving & supervision of fabrication & erection of fire protection, detection & Alarm system as per approved drawings & standards, expediting of bought outs & site. Co-ordination with client & internal departments, Preparing & review the billing schedule, payment follow ups., Responsibilities in terms of monitoring the timely execution of project, Creating the planning & giving to contractors for timely completion, Monitoring the material management to avoid shortage of material when needed, expediting of the project in terms of material supply, on time payment problems, contractor and in house technician dealing, knowledge of M.S Office., Co-ordination & supervision of fabrication, erection, testing, commissioning and handing over of fire hydrant, fire sprinkler, gas suppression, fire detection, PAS, intruder alarm system, CCTV, motor Controllers, MCC panel etc.

Projects Handled

  • Fire protection system for Sobha Dream Acres, Sobha Sentosa, Sobha Insignia, Bengaluru, 7Cr, Ongoing
  • Fire protection system for Arliga Infrastructure, Tower-2, Bengaluru, 1.4Cr, Ongoing
  • Fire protection system for Raja Bagmane Residence, Bengaluru, 2.6Cr, Ongoing
  • Fire protection system for Sattva Knowledge point, Bengaluru, 12.2Cr, Ongoing
  • Fire protection system for Sattva Park Cubix, Bengaluru, 3.2Cr, Ongoing
  • Fire Protection system for Renaissance Reserva, Bellevue, Bengaluru, 4.0Cr, Completed
  • Fire protection system for Manipal Academy and Higher Education centre, 0.75Cr, Completed
  • Fire protection system for Marriott hotel, Bengaluru, 2.3Cr, Completed
  • Fire protection system for various Infosys projects, Bengaluru, Indore, Chennai, Mysore, Pune, Bhubaneshwar, Nagpur, 28.5Cr, Completed
  • Fire Protection & Detection system for Godrej United Oxygen, Bengaluru, 5.73Cr, Ongoing
  • Fire Protection system for Manipal Hospital, Bengaluru, 5.0Cr, Completed
  • FM Global Standard Fire Protection System for Intel SRR-3 office building, Bengaluru, 11.8Cr, Completed, 2015-11-01, 2016-11-30
  • Fire Protection System for HCL technologies Ltd, Bengaluru, 4.6Cr, 15 months
  • Fire Protection system for Sabic Research Centre, Bengaluru, 3.3Cr, 12 months
  • Fire Protection system for Biocon B2 and Syngene International, Bengaluru, Completed
  • External Hydrant System for GE India, Bengaluru, Completed
  • Fire protection and detection system for Orion Mall, Bengaluru, Completed
  • Fire protection system for Lulu international shopping mall, Cochin, Completed
  • Fire Sprinkler System for Wipro technologies, Pune, Completed
  • Fire Protection, Detection, PAS, VESDA & Water leak detection system for Infosys campus, Pune, Completed
  • Fire pump Room for UGS-1, UGS-2, UGS-3, Completed
  • Fire detection and public address system for Sasken communication, Pune, Completed
  • Fire protection system & Fire alarm system for Sobha Carnation, Pune, Completed
  • Fire Hydrant and Sprinkler system, PAS & Fire alarm system for Infosys campus, Mysore, Completed

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Education

ELECTRONICS& TELECOMMUNICATION ENGINEERING (ETE - LE)

CTECH TRAINING CENTRE
KERALA
06.2000 - 04.2002

Timeline

Senior Manager – Projects

Sobha projects & Trade Pvt Ltd
08.2017 - Current

Manager – Projects

Sobha projects & Trade Pvt Ltd
04.2012 - 07.2017

Asst Manager – Project

Sobha Projects and Trade Pvt Ltd
05.2009 - 03.2012

Project Engineer

Sobha Projects & Trade Pvt Ltd.
12.2006 - 04.2009

Site Supervisor

Sobha Projects & Trade Pvt Ltd
06.2002 - 11.2006

ELECTRONICS& TELECOMMUNICATION ENGINEERING (ETE - LE)

CTECH TRAINING CENTRE
06.2000 - 04.2002
Sreekumar MFire & Safety system