Summary
Overview
Work History
Education
Skills
Timeline
Generic
Sri Krish

Sri Krish

Instrumentation Engineer
Bengaluru

Summary

Fastidious Instrumentation Engineer with 5.5 years designing and maintaining technical products of incomparable accuracy. Specializes in conforming all instrumentation solutions to perfectly align with performance tolerances and budgetary thresholds. Satisfied only when exceeding customers' technical expectations and meeting financial needs.

Overview

7
7
years of professional experience
7
7
years of post-secondary education
4
4
Languages

Work History

Instrumentation Engineer

Flowserve India Controls Ltd
2021.09 - Current

As an Instrumentation Engineer, I have spearheaded various critical tasks and projects, showcasing my expertise in ensuring the seamless operation of systems and equipment. Here's a detailed breakdown of my responsibilities and achievements:


  • Preparing and checking the Instrument Data Sheet, Instrument Index, Hook Up drawings, GA Drawings, for Instrumentation and Automation.
  • Preparing the ESD Logic, Cause and Effect Document, I&C equipment Spare list.
  • Preparing the Instrument IO List. DCS Connections, Instrument Wiring Diagrams, and Cable schedule.
  • Reviewing the Vendor Drawing Specification, Instrument Specification,Instrument Test run procedures and Certifications.
  • Selection of Instruments as per the ISA Standards. Preparing the Handoff Documents during FAT and SAT stages.
  • Worked on both Green Field and brown Field Projects.
  • Delivering the projects on time with good quality.

Master Station V and Flowsync App Testing

  • Conducted rigorous testing of Master Station V to control electric actuators via Modus Protocol, ensuring seamless functionality.
  • Performed Smoke and Sanity testing to validate system reliability and stability.
  • Led comprehensive Testing and Validation of Flowsync Bluetooth-based application for Actuator control and configuration.
  • Developed detailed Test Plans and executed Test Cases, meticulously analyzing results and reporting issues.
  • Conducted Black Box testing, System Testing, and Regression Testing to ensure robust application performance.
  • Documented entire validation process, noting any changes or alterations made.


Site Engineer (Installation and Commissioning)

Advanced Sys-Tek Pvt Ltd
2019.10 - 2021.09

HPCL Gas Plant Green Field Project:

Installation and Commissioning of Metering Skid:

  • Spearheaded the installation and commissioning of the Metering Skid for the HPCL Gas Plant Green Field Project, ensuring compliance with design specifications and safety standards.
  • Prepared essential documents including Site Acceptance Document, As-Built Documents, and Test Run Certifications, facilitating smooth project execution and documentation.

Instrumentation and Control System Setup:

  • Compiled Data sheets for Field Instruments, IO Lists, and Instrumentation Index sheets, ensuring accurate documentation of instrument specifications and configurations.
  • Reviewed Hook Up Drawings and supervised the installation of instruments as per drawings, ensuring precise positioning and connectivity.
  • Oversaw the installation of Control Panels, conducted loop connectivity checks, and powered up cabinets to ensure operational readiness.

Site Engineer

ABB India Pvt Ltd
2017.06 - 2019.10

Documentation Preparation:

  • Generated Data Sheets, Loop Diagrams, and P&ID Diagrams for Field Instruments, ensuring accurate representation of instrument specifications and placement within the system.
  • Created comprehensive Instrument Index Sheets, IO Lists, and Cause and Effect documents, providing essential references for system configuration and troubleshooting.

Coordination and Planning:

  • Developed daily work schedules and coordinated with contract workmen to ensure alignment with project timelines and objectives.
  • Effectively communicated work status updates and priorities to contract workmen, fostering a collaborative and productive work environment.

Documentation Management:

  • Updated and maintained project documentation, including design documents, test reports, and meeting minutes, for thorough record-keeping and future reference.
  • Ensured that project documentation was accurate, up-to-date, and easily accessible to project stakeholders as needed.

On-Site Troubleshooting:

  • Utilized analytical problem-solving skills to troubleshoot on-site issues promptly, minimizing delays to the overall project schedule.
  • Collaborated with project teams and subcontractors to address and resolve issues effectively, ensuring project milestones were met according to plan.

Through meticulous documentation preparation, effective coordination, and proactive troubleshooting, I contributed to the successful execution of the project while maintaining high standards of quality and efficiency.

Education

Instrumentation and Control Engineering - Bachelor of Engineering

PSG College of Technology
Coimbatore
2014.06 - 2017.05

Diploma in Electric And Electronic Engineering -

PSG Polytehnic College
Coimbatore
2010.06 - 2014.05

Skills

    Auto Cadd

undefined

Timeline

Instrumentation Engineer

Flowserve India Controls Ltd
2021.09 - Current

Site Engineer (Installation and Commissioning)

Advanced Sys-Tek Pvt Ltd
2019.10 - 2021.09

Site Engineer

ABB India Pvt Ltd
2017.06 - 2019.10

Instrumentation and Control Engineering - Bachelor of Engineering

PSG College of Technology
2014.06 - 2017.05

Diploma in Electric And Electronic Engineering -

PSG Polytehnic College
2010.06 - 2014.05
Sri KrishInstrumentation Engineer