

Accomplished Assistant Construction Manager with over 13 years of specialized experience in electrical systems and plant machinery operations within the construction industry. Expertise in commissioning, testing, and maintaining critical electrical infrastructure, including batching plants and diesel generators, has consistently led to enhanced operational efficiency and significant cost savings. Proven track record in project management and resource optimization, complemented by a strong commitment to fostering a safety-oriented culture that achieves zero-incident records. Technical proficiency in electrical components, combined with a deep understanding of safety protocols and sustainability practices, positions this professional as a valuable asset for driving success in large-scale construction projects.
Project Responsibilities:-,
MPSB Project, Assistant Construction Manager (P&M): Steered testing and commissioning activities for batching plants and diesel generators. Orchestrated the acquisition of high-tension (HT) power supplies from APDCL to fulfill operational needs. Directed the successful commissioning of eight gantries, facilitating segment and I-girder precasting across two casting yard sections. Championed continuous equipment operation at the Guwahati site, ensuring adherence to project timelines and specifications.,
Project Responsibilities:-,
KRIDE -C2-C4 Project, Assistant Construction Manager (P&M): Directed testing and commissioning efforts for batching plants and diesel generators (DGs). Acquired high-tension (HT) power supplies from BESCOM to effectively support operational requirements. Successfully executed the commissioning of eight gantries, enabling U-girder and I-girder precasting operations at the casting yard. Maintained seamless equipment functionality at the Bengaluru project site, upholding continuous operational standards.,
Project Responsibilities:-,
Project Responsibilities:-,
KIAL Project, Senior Engineer (Electrical): Directed the commissioning of batching plants and diesel generators, fortifying site operations. Acquired high-tension (HT) supplies from KSEB, warranting continuous, interruption-free operations. Managed batching plant protocols, underpinning the seamless execution of the Kerala project.,
Project Responsibilities:-,
SSRP Project, Supervisor: Oversaw commissioning and operational phases for both batching plants and substantial 40-ton gantries powered by diesel generators. Bolstered on-site activities via strategic equipment placement and ceaseless batching processes.
1) Reading, 2)Playing Carrom board 3)Chess.